HomeMy WebLinkAbout2022 CON Eagle Paving Co. Inc. - National City Boulevard Bikeway CIP No. 19-18 Change Order No. 1te= CALIFORNIA • t4ATIONAL Cflr i1u�v INCoRpoRwrito NATIONAL CITY BOULEVARD BIKEWAY CIP NO. 19-18 Contractor: EAGLE PAVING . INC. CHANCE ORDER NO. 1 June 30, 2022 Reason/Purpose for this Change Order: The item "Replace Existing Storm Drain Grate, Type 18- " was shown with a quantity of 3 EA t three separate locations on the plans. Field meausrement of the exisint grates along National City Boulevard at Stations 16+50 and 26+00 showed that the existing frame size was 24" and not 18" as indicated on the plans. In addition, the existing frame at Station 26+00 was a double grate whereas the plans only showed replacing a single grate. This Change order compensates the contractor for the upsizing of the 2 of the grates for a 4" frame and one compelete 24" grate not originally called out on the plans. The City of Pation l City and Contractor agree to the following change to the original al Contract: Extra Work at Agreed Unit Price In accordance with Section 4-1.0 , "Changes and Extra Work', of the Standard Specifications, Contractor to replace existing skit, drain grates on National City Boulevard at STA 16+50 (lea) and 26+00 (2ea) with Type 24-12x grates in accordance with Caltrans Standard Plan D77B. Extra Work at Agreed Unit Price 3 EA $1,192.O01EA = $3,576.00 increase A unit price of $1,192 per Type 24-12x grate replacement will constitute full and complete compensation, including all markups, for removing and replacing the storm drain grates, including all material and incidentals. Decrease Bid Items At Bid Unit Price Bid Item 12 "Repalce Storm Drain Grate, Type 18-9x" 22ea (-67%) @ $900/EA = -$1,800(-67%) There will be no adjustment for item No.12 "Repalce Storm Drain Grate, Type 18-9x" in accordance with Section 3-2.2.3 "Decreases of More than 25 Percent" of the Specifications by reason of this change order. Total Decrease Bid Item at Bid Unit Price =-$1,800.00 decrease This change order does not affect the controlling activity_ No time adjustment is warranted. CALIFORNIA NATIONALcn .. -aavel NATIONAL CITY BOULEVARD BIKEWAY CIP NO. 19-18 Contractor: EAGLE PAVING CO, INC. Original Contract Amount Net change by previously authorized d Change Orders Subtotal ... ..... . , ......... , .. Amount of this change order. New contract amount Working days added: 0 Submitted by: Project Manager CHANGE ORDER NO. 1 June 30, 2022 650,760.00 $ 650,760.00 1,776.00 Working days subtracted: 0 ;ent change in Contract to date 0.27% Lucas Rothe, PE Resident Engineer 071 5/ 0 2 Date 652,536.00 Approved by: City Date City Manager, required for Change Orders>$24,999 Date By signing this Change Order the Contractor ccnfirrns that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein, Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc, and that there will be no further compensation. AEI of the terms and conditions of the original contract documents are incorporated herein. 1cc!ptIand,re94t9by EAGLE PAVING CO, INC.: Marisa Garland Name: Digitally signed by Marisa Garland Date: 2022.07.21 15:34:07-07'00' Date 07/21/22 Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the tears of the contract and you may proceed under protest, You must comply with the contract requirements of submitting a written protest to protect your claim. gti? Originals: City Clerk, Contractor cc: En9ineering 11.21 ct file, Pre ect Manager - r..r•.arr.. rr.r•..w.a�r.. . i .. i .dm �...�.r - � � _ rtr ..+�+w++...r+.n. 1