CHANGE
ORDER NO.
November 9, 2022
of (ticn City and Contractor agree to the following change to The original Contract:
The csiv ha ire
include corn
the contractor to remove the existing tree to ted at.2560 E. .4th -St. Removal oval shall
I ana i p l l clu ing stump grind, removal of grindings and compacting grade . Ali
work and related &Its regarding the removal of the tree have been authorized at the agreed lump p sum price
listed below.
.Q.r aa.�:.:maws a•a �._ _
Original Contract Amount•
Net change by previously authorized Change Orders. • . ,
Subtotal 61•ii•
Amount of this change order,.iws�.• ii•guess •��l�i
New contract amount
Working days added: 1 Working days subtracted: 0
Submitted by:
.�..� anger_ - - -
Approve
•
11-23-22 _
Date
a1,40 ,8 0.00
24,136.00
1,4 ,95 .i00
4,600.00
•. $ A32.556.00
Percent change in Contract to date 2.05%
/453171,1a`
City--aject Ma�a�er------_.... _ Date
CityEn eeDate City Manager. required for Change Orders 424,g99
Date .........
By signing this Change rder- the Contractor confirms that he/she Is completely familiar with its terms and conditions and has fairly
negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and
labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the
price is fair and complete and represents all costs associated with the work, including but not limited to ail equipment, materials, labor,
supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions
of the original contract documents are Incorporated herein. (2 originals: 1 for City Clerk, I for Contractor)
Awe ted and sgmed to + ntre or's name!)
1.4% l...
Name: �7
NAlri
Citywide Safe Routes to School
CIP No: 19 04
Contractor: Tri-Group Construction Inc.__
Reason/Purpose for this Change Order:
The contractor was directed to remove the tree and stump grind.
Th
r-ate.a.a«yam ..az�a—+'.4���r--�r�..�--..
q,24.17.7.-r
ate
Note to Contractor: It you do not agree with this Change Order you may be directed to proceed with this work under the terms of the
contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect
your claim.
Originals: City Clerk, Contractor
cc: Engineering project file, Project Manager
er
1243 National City Boulevard, National City, CA 91950
Telephone (519) 336-4380
TR1GROU
Construction and Development, n .
Lie. No. 792159
November 8,2022
Mr. Parker Gill
City of National City
1243 National City Blvd
National City CA 91950
Project: CITYWIDE SAFE ROUTE TO SCHOOL PROJECT
Subject: Cost Proposal
S Lanoitan Ave and & E 24th Street Tree
Cost Proposal to Remove Tree and Grind Stump
Tn-Group Construction and Development, Inc. (TriGroup) proposes to:
. Sep -up Traffic Control tor the Tree Removal Crew
. remove one (I.) exiting large tree at S Lanoitan Ave and & E 24th street
. Grind the stump a total of 6" below surface
Fil.1 void with wood chips generated from the grinds
. Cleanup area from the abovemmentioned work
. Remove Traffic Control
For a lump sum net increase of:
4,601: .00
Add 1day to the contract.
. NOTE: This r l is additional cost and does not replace any contract bid item. The
addition is . cost of $4,600.00
9580 Black Mountain Rd? Suite L • San Diego, CA 92126• Office M0 • Fax (858) -1
RO.UP
Construction and Deve!opment, Inc.
Lc. No, 792159
Cost. Breakdo
L.abor:. $825A8
N....:.....:... :
Note: alt labor rates. include employer's burdensas per Section -4 .1
Laborers: 8 hours at $ , /hour
Labor apprentice: 3 hours at $56.92
Labo.r Markups $156.16
Equipment: $306.
Work Tu : 4 hours .
TC Devices: 8 hours $16/hour
Equipment Markup: S4596
iS
Specialist Work: $2,SOILOO
Specialist Markup: $420
rs
Bond: $46
it
9580 Black Mountain. Rd, $ufte L • .. San Diego, CA .92126 Office .. • Fax 689-1594
=
TRIGROUPH:.H--
Construction and Development, Inc,
Lic. No. 792159
NI This cost proposal is for proposed work ands in lieu of the useexirw*- 7'T
of UM basis_
to pay for iL In the event this cost proposal Is not rove and T&M basis is chosen by
the chy for payment, then this cost proposal become null and void and cannot..be used
as a "not -to -exceed" threshold to pay the cumulative T&Mextra '
Conditions:
. All Sections of the Contract & Greenbook apply to this extra work.
• TSAI work is not applicable due to the use of a specialist
• All Sections of the Contract apply.
.This cost cost and does not ire lace an cfmtract bid item. The addition
ma -cost -of , oo: - -
* Handling unsuitable & hazardous material, and not included
. Cost Proposal expires on 11/30/2022
Please contact our office at 858-G89OO58 for any questions regarding this matter.
Sincerely,
einF
Dominic Oshana