Loading...
HomeMy WebLinkAbout2022 CON Tri-Group Construction Inc. - Citywide Safe Routes to School CIP No. 19-04 Change Order No. 6CALIFORNIA - Ali 0.. ��.y■fir * ■ �w4 • CHANGE ORDER NO. November 9, 2022 of (ticn City and Contractor agree to the following change to The original Contract: The csiv ha ire include corn the contractor to remove the existing tree to ted at.2560 E. .4th -St. Removal oval shall I ana i p l l clu ing stump grind, removal of grindings and compacting grade . Ali work and related &Its regarding the removal of the tree have been authorized at the agreed lump p sum price listed below. .Q.r aa.�:.:maws a•a �._ _ Original Contract Amount• Net change by previously authorized Change Orders. • . , Subtotal 61•ii• Amount of this change order,.iws�.• ii•guess •��l�i New contract amount Working days added: 1 Working days subtracted: 0 Submitted by: .�..� anger_ - - - Approve • 11-23-22 _ Date a1,40 ,8 0.00 24,136.00 1,4 ,95 .i00 4,600.00 •. $ A32.556.00 Percent change in Contract to date 2.05% /453171,1a` City--aject Ma�a�er------_.... _ Date CityEn eeDate City Manager. required for Change Orders 424,g99 Date ......... By signing this Change rder- the Contractor confirms that he/she Is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to ail equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are Incorporated herein. (2 originals: 1 for City Clerk, I for Contractor) Awe ted and sgmed to + ntre or's name!) 1.4% l... Name: �7 NAlri Citywide Safe Routes to School CIP No: 19 04 Contractor: Tri-Group Construction Inc.__ Reason/Purpose for this Change Order: The contractor was directed to remove the tree and stump grind. Th r-ate.a.a«yam ..az�a—+'.4���r--�r�..�--.. q,24.17.7.-r ate Note to Contractor: It you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager er 1243 National City Boulevard, National City, CA 91950 Telephone (519) 336-4380 TR1GROU Construction and Development, n . Lie. No. 792159 November 8,2022 Mr. Parker Gill City of National City 1243 National City Blvd National City CA 91950 Project: CITYWIDE SAFE ROUTE TO SCHOOL PROJECT Subject: Cost Proposal S Lanoitan Ave and & E 24th Street Tree Cost Proposal to Remove Tree and Grind Stump Tn-Group Construction and Development, Inc. (TriGroup) proposes to: . Sep -up Traffic Control tor the Tree Removal Crew . remove one (I.) exiting large tree at S Lanoitan Ave and & E 24th street . Grind the stump a total of 6" below surface Fil.1 void with wood chips generated from the grinds . Cleanup area from the abovemmentioned work . Remove Traffic Control For a lump sum net increase of: 4,601: .00 Add 1day to the contract. . NOTE: This r l is additional cost and does not replace any contract bid item. The addition is . cost of $4,600.00 9580 Black Mountain Rd? Suite L • San Diego, CA 92126• Office M0 • Fax (858) -1 RO.UP Construction and Deve!opment, Inc. Lc. No, 792159 Cost. Breakdo L.abor:. $825A8 N....:.....:... : Note: alt labor rates. include employer's burdensas per Section -4 .1 Laborers: 8 hours at $ , /hour Labor apprentice: 3 hours at $56.92 Labo.r Markups $156.16 Equipment: $306. Work Tu : 4 hours . TC Devices: 8 hours $16/hour Equipment Markup: S4596 iS Specialist Work: $2,SOILOO Specialist Markup: $420 rs Bond: $46 it 9580 Black Mountain. Rd, $ufte L • .. San Diego, CA .92126 Office .. • Fax 689-1594 = TRIGROUPH:.H-- Construction and Development, Inc, Lic. No. 792159 NI This cost proposal is for proposed work ands in lieu of the useexirw*- 7'T of UM basis_ to pay for iL In the event this cost proposal Is not rove and T&M basis is chosen by the chy for payment, then this cost proposal become null and void and cannot..be used as a "not -to -exceed" threshold to pay the cumulative T&Mextra ' Conditions: . All Sections of the Contract & Greenbook apply to this extra work. • TSAI work is not applicable due to the use of a specialist • All Sections of the Contract apply. .This cost cost and does not ire lace an cfmtract bid item. The addition ma -cost -of , oo: - - * Handling unsuitable & hazardous material, and not included . Cost Proposal expires on 11/30/2022 Please contact our office at 858-G89OO58 for any questions regarding this matter. Sincerely, einF Dominic Oshana 9580 Black Mountain Rd. Suite L • San Diego, CA 92126 • Office (858) 8 -0058 b Fax 0 8) 689-1594