HomeMy WebLinkAbout2022 CON Crest Equipment Inc. - El Toyon Las Palmas Bicycle Corridor CIP No. 19-02 Change Order No. 9El Toyon-Las Palmas Bicycle Corridor
ClP No: 19-02 �+. ILL: I
Contractor: Crest Equipment Inc.
Reason/Purpose for this Change Order.
The City has directed the Contractor to perform misc. electrical work on a Trrt basis.
17,
r'rnir
az
CHANGE ORDER NO. 9
August 26, 2022
The City of National City and Contractor agree to the following change to the original Contract
The City has directed the Contractor to perform misc., electrical work on a T&M basis. The work consisted of
exploring the DLC conduit at Plaza and drove to attempt to remove existing wire, install conduit for the
service point at 18th and Grove and 8th and T and complete all other work necessary to energize service
points per SDG&E. All work was tracked on a T&M basis and performed for the total price listed below and
per the back-up documents attached.
Original Contract Amount
Net change by previously authorized Change Orders
Subtotal
Amount of this change order ...... ..............�.
New contract amount
Working days added: 4
Working days subtracted: 0
0
ft*Vali •e• bie•
$ 1,281, 798. 7
98.091.17
1,379,889.54
18,966.58
Percent change in Contract to date 7.0%
1,398,85612
Submitted by:
sect Manager
..._9-.7.14622
Date
City Project Mana
aft-5-p-
Date
,Approved
Cit En. j" eer
Date
Cit5 na ' er, equired For Ohara Orders 424299 Date
By signing this Chan *"- Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly
negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and
labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the
price is fair and corrfplete and represents all costs associated with the work, including but not limited to all equipment, materials, labor,
supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions
of the original contract documents are incorporated herein. (2 originals: .1 for City Clerk, di for Contractor)
tractor)
L ccepted and agreed to by (Contractor's name)
-o
aloe.
102Z,
Date
Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the
contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect
your claim.
Originals: City Clerk, Contractor
cc: Engineering project file, Project Manager
1243 National City Boulevard, National City, CA 91950
Telephone (619) 336-4380
NATIO.v aid
(16natrt sn
.•'
El Toyon-Las Palmas Bicycle Corridor
GIP o: 19-0
Contractor: Crest Equipment Inc.
rReason/Purpose for this Change
'The City has directed the Contractor to perform misc. electrical work on a T&M basis.
•
CHANGE ORDER NO. 9
August t , 2022
r) r
Y'k
/col
The city of National City and Contractor agree to the following change to the original Contract:
directed the Contractor to perform misc. electrical work on a T&M basis. The work consisted of
The Cityhas
exploring lowing the DLC conduit at Plaza and Grove to attempt to remove existing wire, install conduit for the
service point at 18th and Grove and 8th and T and complete all other work necessary to energize service
p per er SDG&E. All work was tracked on a T&M basis and performed for the total price listed below and
per the backup documents attached.
Original Contract Amount
Net change by previously authorized Change Orders. , ... .
Subtotal.w...■a i•irrrar,rass4+�a..... ■......
Amountof this change order...,...rrsrsr.rwrasrsrsss�asrsssissssass�su
New contract amount..,
Working days added: 4
Submitted by:
Tana er
iApproved by:
Working days subtracted: 0
.9-14-22 ..
Date 1Ci Projct Manager
*1
•
$ 1,281,798.37
75 7.65
)(I-;.0
18,966.58
$ W6,642:60
Percent change in Contract to date 7.40%
Date
City Engineer Date ICity_Manager, required red for Charge e Ord&s >$ 4.999 Date
By signing this Change Order the Contractor confirms that he/she is completely familiar wilt its terms and conditions and has fairly
negotiated its price, terms and conditions. if this Change Order is approved, Contractor will provide all of the equipment, materials and
labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the
price is fair and coMplete and represents all costs associated with the work, including but not limited to all equipment, materials, labor,
supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. AU of the terms and conditions
of the original contract documents are incorporated herein. (2 originals: for City Clerk, f for Contractor)
Accepted and agreed to by (Contractor's name):
°11� I3• to2z
ame,
Date
Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the
contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect
your claim.
Originals: City Clerk, Contractor
1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380
cc: Engineering project file, Project Manager
i�
4a E.• ' a04
Extra Work/Construction Delay
Project Title: El Toy - Las Palmas Bicycle Corridor
Project No.:
Location: Plaza Blvd and Grove Street
OP NO 19 02
Date Performed: 7/1 12022
Date Reported: 7126/2022
Report
Description of Work: Pulled DLC, Main crossing does not mom coil DLC on north East Corner
Equip. No.
1
Hourly Rate
&fended And,
$0.00
- $0.00�
- -
$0.00
$0.0i
$0.00
_
- $0.00
$0I00,
-
$0s00
1 $0.00
_
$0,00
$0.00
$0.00
$0.00
r
_
$0.00
$0.00
n
De net add rows, use separate shest If necessary)
Sub -Total:
0.00
aerials and/or Work done by pecialhsts
Descr*Non
-No. of Units
Unit.t -•'L
Perry Electric- DIG
1
$796.22
$796.22
$0.00
please see attached
0.00
$0.00
w
Sub -Total:
$796.2 I.
n
�actontr
r's Representative
Accepted for Progress Payment:
Resident Engineer
Labor
Hours
Hourly Rate
Ant
Reg.
$0.00
$0.00
OT
Reg.
$0.00
OT
$0.00
Reg.
$0.00
OT
$0,00
Reg.
$0,00
r
OT
_
$0.00
Reg.
$0.00
OT
-- --
$0.00
Reg.
$0.00
OT
$0.00
Reg.
$0.00
OT
, $0.00
Reg.
$0.00
or
_-
$0.00
(Do not add row use Separate sheet tr nec awry)
Reg. Hrs. illi $0.00 OT Hrs. = $0.00 Sub-Tc tal:
$0.00�
20%I. Labor Markup*
Total Labor Cost
Total E' u u ment i Material Cost
Equip/Marl Markup*
Total Equlpat'l Cost
Sub Contractor ??
1= Ye.s, 0-JNo 0 51.11 Sub rkup*
Total Sub Cost
DAILY TOTAL:
$0.00
$0.00
$0.00
$0.00
am* iimniimmlin•Mw• mio MN MD
$0.00
$836.03
I
$R3SA3'
* For TRO Projects: Labor= %, Eq IMa i 10" , Subs%
See Contract Special Provisions
DPW Form CE4471 flirt 11/11)
E03 C-4
lolly yr!mammal Guy
I Contractor Job: 1363 - El To r - Las Palmas Bicycle
Work Performed: T& E1ci lr'. DBA' Per ElectricCorridor
(ForCrest Construction Company
Descriptor' of Weric Plaza Blvd & Grove St / Pulled Dic, Main Crossing Does Pilot Move, Coil D
ic On North Eat Corner
Labor Charges
DrattiLevel Employee Name
LOl ELC SED E Dukes
"2 ELC SDM 0 Macias
Equipment Charges - _-
Equipment ID Claim Make
Eel TRUCK 56 TRUCK T&TT 12-20
E02 58 TRUCK T&T 12-20
h
MRCP PORT 016-025
Material/Specialist Work/Lump Sum or Unit Price
_ Number Date Vendor Name and Description _
t 1069-io i of W15,2022 Oatifornia Electric SupplyI #6 Lid
MO2 1069-1 3 7/15/2022 Cafitornia Electric Stipply / Type 8 DLC
Al A2
DAILY EXTRA WORK REPORT
Contract: 19.02
RT Mrs 0T Mrs Subs Unite RT Rate
2.50 54.230
2.50
EL
T81,1%1 Electric, Inc. OBA Perry Electric
P.O. Box 710130JSantee! CA 92072
Phone. 619.449.0045 Fax: 619.449.0511
Special BM F
AT Hrs OT I rs
2,50
2.50
2,50
47.300
Sub: PERRVELECT BILL 2,0 Job: 1363
Change Order
Silting Number
1 Report Date
Perform Daze
(yr Rate ts Rate _ Extended
135.575
118. 50
AT Rate OT late Delay pear
20.800
Eden del
92.975
92.975
52.000
Units Unit Price
1
_.__. .000 LS
225.000 EA
111.09000
0.36431
Dow
Dare.
Extended
01
7/1 5/202
7/1 5/2022
chare
RT Labor 253.83
8C 10.00% 25.38
OT Labor 0.00
Subtotal Labor
Subsistence
Other Expenses
MU .%
Labor Total
279.21
0.00
0.00
335.05
61.091 Equipme,rd Charge.
alig7 Subtotal237.96
15,0015469
Equipment Total vares
allaterial age*
Subtotal 163.06
u 15.00%
Material Total
Activity Total
4.48
187.52
788.22
79B.22
796.22
79B.22
Page 4'i '�""Y. tie. , i
EL)11)116fIrc
JOB NAME:
LOCATION:
Description of Work rfor (bedetailed)
Extra Work Tentative Agreementer No._________
D;i4W*--443 iiiimnmt Quantity
nvoices are re.uired for ALL materials used on Extra Work
Perry Becht - Representative Name
DATE: is.
JOB NO.:
-L2
Description of Work
not from stock
T
Representative Name
CA
L/FRNIA ELECTRIC SUPPLY
1011 BAYBLVD.
CHULA CA91 11
T: 6194272370
SOLD TO:
T & M ELECIOSA PERRY
11519 WOODSIDE AVE
S, CA 92071
ACCOUNT •NAME
I Y-7O 77 JOB #1299 3 ROOTS PROJECT4.82102
sAtesPERSON
ORDERED
T
SDPR
N36
BIER w. �r fr � ` : - • men . i c1l1 1�Imiry Ft m�dragnagaliVIRMETIVOTWIRAINTAW 14111"
PRODUCT CODE
SDPRE
0
N3OXTRAFF 41p..
L
SHIP TO:
Invoice
1069.4021401
P PLEASE SNOW INVOICE NAND RED
PO Box 847068
Los Angeles. CA90084-7068
ELECtLIBA PERRY
BRANDON8
9265 CAMINOSANTA FE
SAN .I .`, CA 92121
JOB NAME.
PREPAID
.NEr Remit 10 .DUE 8-Y THE 15TH OF THE NIONM
FOLLOWING PURCHASE
SHIP VIA
art
SNIP
SDI
CUSTONwk
19-
SALES TAX 7.75000
SHIPPING CHARGE
TOTAL DUE
Page 1
DATE
05/10/2022
RDA NO
1401
SHIP DATE
0 02.2
301Z5
529.05
0.00
CALIFORNIA ELECTRIC RI P i Ly
1011 BAY BLVD.
CHULA VISTA CA 91911
6194272370
SOLD TO:
T & M ELEC/ORA PERRY
11519 WOODSIDE AVE
SANTEE, CA 92071
KY-8 +751 JOB 01387 NAT. emir "1lD BIB PR. T
SALESPERSON INFORMATION
! T1
ORDERED
T
WIRE
ACCOUNT #!NAME J B NAME
Invoice
Page 1
INVOICE NO. INVOICE DATE
1069-102235408107/2022
PLEASE SHOW DICE NO. AND REMIT TO:
PO Box 847088
Los Angeles, CA 4-7068
SHIP TO:
T & M ELECIDOA PERRY
JOBSITE
VARIOUS LOCATIONS IN NATIONAL CITY
NATIONAL CITY, CA 91950
16-O C TYPE B WIRE
DescR►aRBN
DLC 1612 C 2500E
iert.F cmAtiotn,E PAzzEzihT F Oi€ SHIP CAR CDR HMV ruktmaip
KM C(A. Ut_ S A!. TO CARRiVi
LL , FOar DT ? tERROR OUR PART.
h SWAM CKAR'Ol v 1.510. PVI MOH Pt V IOT TO EXC. CE3! 1fR{ HTt 1IEU/. o 4Wc1UNT IJi 'Yi u..Y
001-0/41306i'COfdrOACTIPtM STAT 'Afttt. OE woe On Au. PAST ma ACtRcw
TPA wits is st.PO Wit TWMIS tocAM AT ,SA OUR,TVIRWLCOM. YitttiGli WE rMY
CliMiGE fR MT Mf TO 71.70ENVITHartPRIOR na i71C£
CUSTOMER ORDER NO.
OUR TRUCK
5000 335.00
1:02e TO ACMSE roiiiivrt0611FTLY CONG001111413 Tagialak.rite woe *WED CPI Oti INVOICES,
c =rem WrLL 6141P Mw PILSTRUCTED
NM' PAVMNT ES DUE BY THE iSTH OF THE O
FOLLOWING PURCHASE
3 8 354
SHIP DATE
05/2512022
EXTENSION
1675.00
MERCHANDISE
C
1
0
b.�
1675.01
SALES TM 87
SHIPPING CHARGE
TOTAL DUE =
146.51
1.821.51
Extra Work/Construction Delay
Project TitI :: _ El you -Las Palmas Bicycle Corridor
Project No.:
Location: lath met arid Grove Street
Description Work: Pipe In service point, pipe into
(Co not add ram, use *operate stiest Lr ne- aary)
Ids andiur Work done by Specialists
won
Ferny Electric- OLC
lease see attached
Sub -Total:
Contractor's RepWentstFie
Accepted for Progress Payment
Resident Engineer
1P NO1902
ExtestrodAiir
$11509.44
$0.00
$0.00
0.00
$0.00
$0.00
Sub -Total: $1,609.44
Reg. Hrs. = $0.00
Date Performed: 7118/2022
Date Reported: 7126'2022
Report No.: 8
Hain Horn Extended
$0.00
0.00
-
.00►
0T
Reg.
OT
Reg.
Reg.CI.00
O •
i
! Y •I
Reg.
OT
0.00
Reg.
OTRe
g.
OT
.01.
(Do not odd rows, uss eepernfe sheet tit necesra ,►j
CT Firs. = $0.00
Sub -Total:
20%11Labor Markup*
$0.00
Total Labor Cast
Total E i u p rnent I Material Cost:
Equipitvlatat Markup*
Total Equip/Marl Cost
Stub Corttnictur 771
No ›). I 0 5` i ub Markup*
Total Sub Cart
DAILY TOTAL:
$0.00
$0.00
$0.00
$0.00
$0.00
1 .91
* For TRO Projects: Labor 0` , Equlp,Plat'llg10%, Sub0,5%
See Contract Special Provisions
pPW Form CE471 11111)
Ulty OfNational' City
Contractor Job: 1363 - El Toyon - Las P irnas Bicycle o dor
Work Perform Sy: T&IVi Electiic, Inc. OBA Perry Electric (For Crest Construction Company)
Description of Wok 10th St & Grove t / Pipe In Service Point, Pipe into BODE 3
309
Labor Charges
Cra111Levet Ern a eB Name_
' ELC "2 8 Perry
run ELC SPA P Aleman
Lao OE BG- R8 B Gunter
Equipment Charges
Equkprinert ID Claes
'lei 59 TRUCK T&TT 1 - 0
TRUCK T&Ti 60
TRUCK TaT 20-28
AIRCP PORT 016-025
Eti3 62
Et4
E05 BOBCAT - A
ae MINI EX
Al P2
Make
Model
TRACS <50 A
HCE L, SCAT E20
DAILY EXTRA WORK REPORT
RTRrs OTKrs
3.00
3.00
3.00
Contract: 19-02
Sub: PEARYELEC BiIl: 3.0 Job:1363
Change Order
Billing Number
Repels Date
Perform
$1,1309.44
002
3.0
7/1 1 022
7/18/2022
Subs Units RT Rale OT Rate Subs Rate Extended
44.450
4.2.890
ITT H1 OT His
3.00
3.00
3.00
82,970
3.0
Material/Specialist Work/Lump Sum or Unit Price me►nt
Dale VundDr Name and Dew* * iron
1 10894024017 7f1� California Electric
_ Supply � �h ���
11402 1061o's7 711� California Electric Supply 1 -2* 9CH80 Elh+aa
kw 7320054 7/1&12022 Vuk an 1 rial Comp -any 11 Ten E-30 Fill Sand
7/1 af2022
NUMber
3.00
RT Rate
37.190
74.690
39.410
20.800
!OT Rate Delay Factor
27. 30
133.350
128.670
910
Extended
111.570
224.070
118.230
14,760
units
10.000 EA
3.000 EA
62.400
81.690
44.280
Unit Pica
7.60700
Extended
76,07
20.42000 61.26
AMloss-imam fcrr�ie Electric Supply3- Couplings 1.6�� 2� ,5�
3.000 EA 0.6502.55
10691 5i1u 7/18/2022 California Electric Supply 1 -2"' Bell Ends - —
TM 'uric, Inc DBA Perry Elegtriu
P.O. Box 710130, Santee, CA 92072
Phone: 619.449.0045 Fax:619.449.0511
MS Special BM Farm
1.000 Ls
2.000 EA
4.79500
7 ,,,,,,,,fractor:
CUM
9.594
Labor Charges
RT Labor 510,93
10.00% 51.09
CST Labor 0.00
Subtotal Labor
SubalBtance
Other Expenses
MU 20.00%
Labor Total
582.02
0.00
0.00
D.w
874.42
Equipment Charge*
Subtotal
mu 15 Oa%
Equipment Total
nue
642.24
Material Charges
Sub otal 170.82
MU 15.0.0% a5.62
Mated& Totai 196444
Activity Total
Work Total
am Numb
BM Total +
1,609
1,609.44
1,609.44
age
mom, ewbl t cjrn
?"1411iC
Extra Work Tentative Agreement Serial
No.
JOB NAME:
LOCATION:
Description of Work Performed (be detailed):
DABi
N
JOB O
t% r - Rapresentative Name
ORDNRED
I
PVC
scHsoia
9$0061)00308
..
SCH40-3
0.0008
sCH80-2
geoosoomos
SDPE
oaoa00000Q0
LJ E
CALIFORNIA ELECTRIC SUPPLY
1011 SAY elVet
CHULA VISTA, CA 91911
Tt 8194272370
SOLD TO:
T 8t ELEC/D8A PERRY
1519 WOODS(CIE.AVE
sANTee, CA 92071
POT CODE
SDPERE
3309.1
OQWJOQ0
0300800.6608
3DEIPLUG
.9800.000443.88.
OR STREET'LIGHTING
DO
GR3410
781'00235030
3309,1
TO
104434411.31:199
4
IVORROUR
Mejrir IFTan latifteltaatiatiraTHMIAlbliTtAVAIII"
InetrigrESOlittilIERNECOK MICR WO Mile
Invoice
Page
POSE 8140W INVOICE "SIG- �.4._ ...
AND Ef T:
PO Box 847088 - :....
Los Angeles, CA 9008407066
SHIP
T & M ELEC/DBAPERRY
TO YARD
11516 WOODSIDE
SANTEE, CA 92071
PREPAID
DESCRIPTION
BOVCOVER #PD24313Z50601(
314 X GROUND R t
=COVE #pcaa-Q
Id. ORDER
SHIP VIA
OUR TRUCK
SHIPPEDPRICE
tarratrici,tora IP AS SCON RECIMI, WOMB INSTRUCTED
OktICSI1.E NOT RI WO= UMMILE TO FORMIS8 IXICALY.
NET PAYMENT la ENS BYTHE is i OFTH MOM
FOLLOWING pt + HAS
T
MERCHANDISE.
SHIPPING CHARGE
TOTAL DUE =
amp DATE
01706/2022
EXTENSION
D
0R
Tar
5580.54
432.49
r F 3.03
II
nit
cr,,,Parw
SNIP TO:
*use CARROLL CYN RD If PERRY ELECTRIC..
���.
FORMAN DIEGO mum
SAN DIEGO,CA9212
Bata To:
INVOICE ��ECTRIC INC DB,p PERRY ELECTRIC
woonslpe AVE
05/130122
STD
STANCIARD
STANDARD
STANCE
STANDARD
STANDARD
CUSTOlitIERNO:
INVOICE NO:
INVOICE DATE
INVOICE AMT:
ORDER:
DUE DATE:
TEMAIIPT
AXES;
CAUFORNiA
AN DSO
REGIONAL TRANSPORTATION
31452
ENVFEE
31452
73284364
440.27
104.35
Taw
10.00
ton
It
SAVE TIME AND SAWA TREE wird asmit..novoicEDELNERYi
Receive your invoice faster and help save the ertvironntent by enroning in our email invoicing service. Weif Wake s ale sent in one easy to open Me ciscaty to your Enka, To sign up, contaa Us at
heipiav
VULCAN MATERIALS MANY AND SUBSIDIARIES, CALMAT CO DOA VULCAN MATERIALS Co
95.19
to oo
410,00
94,43
10Xio
i
14..E
CALIFORNIA ELECTRIC
/01'1 . L r '
SUPPLY
CHULA wsrAi A 91911
T: 6194272370
SOLD TO:
.M.ELECOM
11619 WOODSIDE AVE
KY-80033
...
SALESPERSON
Se00 JG
QTY
ORDERED
40
fil AVM
PRODUCT CODE
PVC
SELL eNtiz
.y
MIONMOSVMMianliarCr44141"j1"4114:C44 1411411112111W
iT ;
JOB
SHIPPING INFORMATION
PREPAID
DESCRIPTION
Oak END ADAPT
• ,. y-
poutnivaimPti Asa
Invoice
SHIP o
INVOICE DATE
'EA06/24/2022
NOW INVOICE AND
PO Sox 847088
Los Angeies. CA 90084-7068
TO SHOP
SANTEECA 92071
C
0
161++4w.cyu•
OUR TRUCK
40
MIST R ORDER
s
1-'1
sHIP DATE
061221204
PRIDE
44E23-
SALESTAX , o rb
SHIPPING CHARGE
TOTAL DUE
MSC.
EXTENSION
17 .09
..0
191.89
I
11,0
CAL/FOR NIA ELEOTRicSUPPLY
111BAY BLVD.
CHULA TA, CA Mill
T: 6194272370
SOLD TO:
Ec PERRY
11519 l IAVE
SANTEE,CA 02071
JOB tun SuNROAC, 5.0.OFFS1110
.,.. ..
SALESPERSON
DF#
N30
7 PFR
y
.p!c
MUM
trattputiainsformaiffireerr
ainglatagirMivirt
■4Ff
fi
BOLTS
dim
Invoice
Pa
INVOICE DAB
03103/2022
POSE SHOW INVOICE NO.. ANDREMIT
PO Box 047068
Los Angeles,. CA 900844'068
SHIP TO:
& M ELEC/DBAPERRY
1011 BAY BLVD,
H LA VISTA,. CA 11
a; CAPICSILM nor INSTOCK WOOLS TO PuRCROME uv*
NKr FOLLOW RA it DUE I OFF MOB
USTOM tt ORDER Nibr--"--
1,2734590
SHIP DATE
o e 2
MERCHANDISE
84r.Es rNc MOMSHIPPIHIG CHARGE
TOTAL DUE
67.88
776.90
0.00
844r88
Project Ti iti :
Project No.:
Location: 8th Street and T Street
Extra Work/Construction Delay
El Town - Las Wires Bicycfe
Description of Work: Pothole & Utilities bore path on SIL Service Point Run
CAP NO 1942
i i
Equipment
Hours
Hourly Rote
Extended Amt.
i$0.00.
$0.00
$0.00
Ii
$0.00
$0.00
o.00
$0.00
-
-
&0.00E
.00
-
-
$0.00
$0.00
.00
$0.00
0.00
+0.00.
Do not add rows, use Ecpara1u sheet tfnecessary)
Sub -Total:
$0.00
Materials r Work done bar Stteltsts
Mac piton
Na. of Units
UnitCoat
ndeif Jr mt.
Paw Elecblc DLC
1
2. 166.7'9
$21168.79
please see attached
$0.00
$1.00
$0.00
Sub -Total:
$21165.79
Contrac o s Representative
Accepted for Progress Payment
Resident Engineer
Date Performed:
Date Reported:
Report No.:
7/1812022
7/26/2022
-- --
n
Labor1113
Hourly Rota
&laded Amt.
T
$0.00
$0.00
OT
$o,oa
Rea.
$0.00
Fhb .00
I
OT
$0.00
Reg.
$0.00
OT
$0;00
_
R-!.
_
$0.00
OT-
0.00
Re! :
$0.00
OT
$0.00
Reg.
$0.00
--_--
I
OT
$0.00
(Do not add ro , use separate sheet if nems■ry)
Reg_ Hrs. = $0.00 OT Hrs. - $0.00 Sub -Total:
I
$0,00:
o%>
Sub Contractor ??
1=Ye&t O o »>
i
Labor Markup*
Total Labor Cost
ment 1 Material Cast
Equip/Marl Markup.
Total EquIpiNtall Cost
5%
SubMarkup*
Total Sub Cost
DAILY TOTAL:
$0.00
$0.00
$0.00
$0.00
$0.00
$21277.23
* For TRO Projects: Labor=30%, Equip i 10%, Sub=5°
See Contiact Special Provisions
DPW Farm CE4971 v 11l17)
DAILY EXTRA WORK REPORT
City Of National City Cantrscetr Jab: 1363 - El Toyon - Las Palmas Bicycle Corridor
Work Performed By: T&M Electric, Inc. DBA Perry Electric (For Crest Construction Company)
Description of Wotk: 8th St & T Si ! Pothole & Utilities For Bore Path On SIL Service Point Run
Labor Charges
Craft/Level
u ELC AM-1
�a ELC RG-2
Employee Name
Contract 19-02
Sub: PERIRYELECT edl: 4.0 Job: 1363 veleara
Order
Billing Number
Repoli Date
Perform Date
AMeza
R Godlnez
PT 1-Ins
8.00
OT Firs Suter Units
AT Rate OT Rate Subs Rate amended
51.720
8.00
Equipment Charges
Equipment ID Class Make
s1 54 TRUCK T&TT 12-20
Model
39.360
413.760
Al A2 ft OT ilrm
ER 24 TRUCK T&TT 12-20 8.00
TRAILER2 TRAIT 16-18
Erg C-3 AIRCP PORT 016-025
8.00
FIT Rate
314.880
37.1.90
37.190
OT Elate Delay Factor —Extended
297.520
Material/Specialist WLump Sum or Unit Price Payment
Number Date Vendor Name and DeSaiption
MO1 73847117
8.00
7/1 022 Vulcan Material Company / 2 Tons Cold Mix 3/8
T&M Electric, Inc. OBA Perry Electric
P.O. Box 710130, Santee, CA 9 072
Phone: S19.449. 0045 Fax: 619.44 .0511
6.390
20.800
297.520
51.120
166.400
units Unit Price
1.00019 L. 37.00000
NW Special NCI Fenn
Accepted:
Customer
Cont"raeror:
Extended
237.00
Date:
4.0
7/18/2022
7/18/2022
Labor Charges
AT Labor 728.64
SC 10.00% 72.86
OT Labor 0.00
• bat labor
Subsistence
Other
MU 20.00%
Labor Total
80150
0.00
160.30
961.80
Equipment Charges
Subtotsi 812.56
MU 15.00% 121.88
Equipment Total 934.44
Materlal Chagos
Subtotai 237.00
mu 15.00% 35.55
Material Total 272,55
Activity Total 2.1168,79
WorK Total 2088079
EMI Subaotsl 2,168.79
Biii Total 4 29168.79
agi
wriney.ew'r s.com
Serial No,
JOB NAME:
LOCATION:
Extra Work Tentative Agreement
Description of Work Performed detailed):
DATE:
JOB NO.:
Work Force
Names
How
Equipment
Type
Hours
stir
oni
WI*
1 % -
i
4
4
i
i
♦ - ' C r-) r{1 • or ;IF 1.
r _ _
4
Subcontractor Names
Hours
Compsmy
Ticket Nos
Desciption of Work
Equipment
Rental
Company
Hours
TicketCornparry
�n
n c Work
li
(Invoices are required
Materials
for ALL
-
materials
Damon
used
& Quantity
on Extra
Work, not from stogy)
Invoice No,
-
M
F
Per/Vile:tie- Repretiantatbie Name,
Contractry- Reptiagentative Name
Project Title:
Project No.: _
Extra Work/Construction Delay
El Toyon 0 Las PalmasBicycle Corridor
CgPNO 111.02
Location: Plaza Blvd and Grove Street
Description of Work: Blow air on r conduit, Try to remove phase wars, nothing roves conduit dang
-.1a
%
lHourly
Rat.Wended
Amt.
$0.00'
$0.00
_$0.00
1
0.00
$0.00
1.
-
-
- _
$0.00
b
boo
$0.00
$0.00
0.00
-
SO.O0
0.00
(Do not add rows, use separate sheet W neeess a ry)
Sub -Total:
$0.00
Mail and%or Work done by Specialism
Electric- DLL
DOstralption
please sere attached
*of tintiCott
Extended M*
Contractors Representative
re
Accepted for Progress Payment:
$604A4
Resident Engineer
$6041.44
$0,00
$0.00
$0.00
$0.00
0.00
Sub -Total: $604.44L
Date Performed: 71/9/2022
Date Reported: 712612022
Report No.: 10
edended Ant
Labor
How
Now* Rote
Reg.
y 4
CT
`00
w
OT
1
,00
Reg.
30,00
0
^-
0++ 4
R.
■ 0•
OT
$0.00
Reg.
SO.00
$0.00
CT
30.00
Reg_
0
OT
,;
Reg.
_
$0.00
OT
$0.0 0
Reg.
50.00
OT
_ -
0.00
$0..00
r o not add M ! tine separate *bait Fr necessary)
Reg. Hrs. = v OT Firs, = $0.00 Sub -Total:
Sub Cum
fw
Total E
0
Labor Markup
Total Labor Cost
- ent ! Material Cost:
5%,
a ip t�l Markup
TotoEC Equipi ari Cost
1Sub Markup*
Total Sub Cost
DAILY TOTAL:
$0.00
MISS
$0.00
$3, 00
$0.00
$0.00
$634.66
$634.66
TRO Projects: Lab--30%, Equip/It , Sub '
See Contract Special Provisions
DAV Fans CUM li!1l)
Labor Charges
Craft/Levet Ent8aee Name
01 EL SED E Dukes_
la, ELC&SPAN J i lue la
City Ot National City
Contractor Job: 1363 - El Toyon - Las P
Wont Performed By: TiStill Electric, Inc DBA Perry
Description (moark4 Pik Blvd & Grove St / Row Atr OnConduit, Try To Remove Phase Wire, Nothing Move. COnduit Dan
DAILY EXTRA WORK REPORT
almas Bicycle Corridor
Electric (For Crest Construction Company)
Equipment Charges�
Equipment ID Class Make Model Al A"
eat TRUCK 56 TRUCK TUT 1 - _ _
58 —TRUCK f T&TT 1- 0—
w�y
C-3
AIR P PORT C16-0 5
TiSIA Electric, inc. DBA Perry Electric
P.O. Bx 710130, Santee, CA 92072
Phone: gi %449.0045 Fax: 619.44 .0511
NTS Special 8lii Form
SAuwor-
ub. LEM S.C1 at; 1353 ii,
44
ntract 19-02 I Change Order
r,U 0
02
Billing g mbar 5.0
Report Date 7/1912022
Perform Vie' 719/ 0 2
Labor charge
AT Labor 250.60
so 10.00% 25.06
OT Labor 0.00
AT Firs OT lira S T Hate OT gate
2.50 54.230
-
46.010 Ti
2.50
RT Hre QT
.0
-
50 .
HT Rate
37.190
37 .190
Custom -ix
Cyr:
20.800
Subs mate Extended
135.575
115.025
OT Rate Delay Factor
Date:
Dab:
`Extended ]+r
9a9/ 5,
9.95_
55.660
Subtotal Labor
Subsistence
Other Expenses
21. 00
Labor Tel
Equipment
subtotal
mu 1. 5.%
Equipment Total
275.66
0.00
0.00
55.13
330,79
Charges
237.96
.6
273.85
Memorial Charges
Activity Total
Wort( Total
Eft Subtotal
NI Total +
604,44
44
604.44
1
voywebitills.com
Serial No.
7;,�rC Extra Work Tentative Agreement
JOB NAME:
LOCATION:
Description of Work Performed (be detailed):
Work Force Names
Subcontractor Names Hours
Equipment Rental Company
Company
Ticket
JOB NO.:
Equipment Type Hours
Description of Work
Description of Work
Materi-m-g---—F."'IP—awa-'1-----
1 -Description & Quantity
Invoices are re utred for ALL materials used on Extra
Perry Electric-- Representative Name
Contractor- Representative Name
Project Title:
Project No.:
Location: fith Street and T Street
Extra Work/Construction Delay
Ei T n - Las Palmas Bicycle Conidor
OP NO 19-02
Description of Work: Bore to Utility Pole for SLC, Service Point not installed
IgtPdP• Equipment
Do not add rows, u.e separila shut if nsase sry)
Materials and/or Work done by ,peciatists
Perry Etectnc- DLC
tease see attached
r-w)
Cc actors Representative
entative
Accepted for Progress Payment:
Resident Engineer
Rawly
Sub -Total:
Sub -Total:
0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Date Performed: 711 r 022
Date Reported: 7/26/2022
Report No.: 11
Leber
Hours
Howdy Rate
Re
OT
Reg.
OT
0
Reg
OT
Reg,
OT
attended IItst
0.00
.00
$0.00
Reg
OT
$0.00
$0.00
$0.00
.00
0.00
0.00
0.,00
OT
Reg.
Or
o not add ram, use separate sheet Wnecessary)
$0.00 Reg. Hrs. = $0,00 OT Hrs. =$0.00
Sub -Total:
$0.00
0,00
0.00
$0.00
S0.00
.00
zo%riabar Markup*
Total Labor Cost
mtal Equipment / Material Cost:
Equip/M t i Markupft
Sub factor
%
Tel Equipiblati Cost
'Sub gip'
Total Sub Cost
DAILY TOTAL: $7,54°-98I
$0.00
r
$0,00
$0.00
$0.00
$7.540.98
' For TRO Projects: Lab , Equip at'i=10%, Subs%
See Contract Special Provisions
DPW Form CE4971 lRev 1' 11I
City Of DAILY EXTRA, WORK SPORT
National Citycont
r or Job: 136 -- Ei TOyo - Las Palmas Br'
INC,*Performed: UM Elect Inc. D8A Eisiric ���� corridor
r Crest Construction Company)
Description t A ■e Mil St T St (Bore To Utility Pole For SIC, Service ce PoInt Not Inside('
Labor Charges
Craft/Level _Ereplo Name
L01 ELC SBP-2 B Perry
ELC SAM-1 A Maza
L03 ELC SPA P Al are
04 OE B GR8
ELC FIG-2
B Gunter
Gocknoz
ELC Axelson
Equipment Cgq
I 1rs o-r Hrs Subs Units
8.00.
0.00 51.720
8.00 42.890
0
82.970
Contract1 9.42
Sub: PERRVELECT Bill: 6,0 Job: 1363 $7,181.69
Change Order 002
Billing Number 8.0
Fleport Date 7/19/
Per M9/2022
RT Rale Oti Rate Subs Extended
44.4
Equipment ID Class Melte Model# Ai A2
MI 59
_ TRUCK T8� 1 -0
_
-TFIUCK
TUT 12-20
ea 50
1504 7
E05 62
8.00
2.00
8.00
TRUCK T&TT 60
IR!JCT&Tr 1 20 _-
TRUCK T&TT 20-28
ex C-6
EO7 ARRW BRD TRAFA R
TRAILB 2 TRAIT T 18- 18
IhtI EX HCB L BOAT E20
dye VACT VACD8 VT`RN 800GT
E1 _CON lU H D-W ,111‘20P
B.00
Material/Specialist r l/SpacialWork/Lump
NUmrSum �� ��i PricePayment
Date Vendor Name arid
042 1 lid 1 o2411T 7f /2022 California Electric-
1003 Supply 1 PVC Factory 90 Elbow
1 t s o7/19f2022 California Electric Sty p
VC 2n COUP
T Mrs OT Hre
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
T e Il Electric, Inc. 013A Perry Electric
P.O. Box 7101301 Santee, CA 92072
P h : 619.44 .0045 Fax: 619.449.0511
otat ejil Form
70.450
39.380 78.720
38.0 308.720
Labor charm
RT Labor 2,060.24
355.600 I SC 10.00%
310.320 OT Labor
343.120
863.760
AT Rate OT Rate Detav Facio► Extended
37.190
297.520
37.1' _ _297,520
_
74.690 597.520
37.190 297.520
39.410 315.280
20.800 .� 166.400
3,480
.390 51.120
f�0
118080
23.960 1 ,1.
880
563.600
Units J ft Pnce
120.000 EA 7.60717
tad:
Gustormmi
Contacrw:
2.000 EA 2c.42 00
3.000 EA 0.85000 2.
55
Extended
912.88
40.84
8ubtatal 'Leber
Subsistence
Other Expenses
MU 20.00%
labor Total
206.02
2,268..E
.01
0.00
5
719.51
Equipment Charges
Subtotal
MU 15,00%
Equipment Total
2,924.08
430.61
3,332.E
Material Charges
Subtotal 956.25
y 1. 14a4.
Material Total 11099.69
Activity Total 71181.89
Work Total 71181.89
Bra Subtotal
7,18149
Bill Total
Pas 1
7,181.89
wwwinstarisllorn
Serie NoeExtra Work Tentative
Agreement
JOB NAME:
LOCATION:
Description of Work Performed (be detailed):
DATE:
JOB NO.:
Materials - Description & Quantity
oices are re uired for ALL materials used on Extra Work u _ _ � from stock
r--7nv
Perry - Representative Name
!Contactor- Representative ire
Ea CALIFORNIA ELECTRIC SUPPLY
I Oil BAY BLVD.
CI-IuLa VISTA, CA 91911
T:6194272370
SOLD TO:
T & M ELECiDBA PERRY
11519 WO D IDE AVE
CA 92071
:. ACCOUNT tiON{.ME
KY-730 0 ... JOB #1363 EL T VON-LAS :PALMA ......
... .. L
?00 LG
PRODUCT CODE
SDPRE
3309.1
porwoopaaoo
. — v .... _
SCH8 U3 90X3
98000008800
SCH80-3
8O0 a
SCH40-3
98006008008
SCH80-2
96006006306
PVC
SC1 0 1=90
96006006326
'.*
RE
N30
00000000000
#. .,• On Kral'
A
WOE TO
OFZPA
Invoice
SKIP TO:
Pegs
INVOICE DATE
0771i*22
PLEASE SNOW INVOICE NO. AND REMR T:
P Box 706 ,
Los Agee 0 7 68
T & M 51-8C/OBA PERRY
TO YARD
11516 WOODSIDE AVE
SINT 'E, CA 92071
JOB NAME
NATIONAL ary EL TOVON
SHIPPING INFORMATION
PREPAID
DESCRIPTION
BOX/COVER 5080
CONOUI
3/4 FOOD
BOA OVER:. ;„p D 6Z50
firreirantiraa"'DETAtrifif."403MOUR
MITI RZI Z ALI +A! rid# tAlwrui-L
MEEMEGINAIK
CO(fi{{ .1 +�yya` 14 .!
To
ninitri FRO, WILL SHIP AB WON PSCSTVE0 MEN MINIUGIEn
#�. - a* ill await isionizio mamas Lomax
I r PA'MNT i JE s'V T 4E t H OF E MONTH
DPP Rj
�. CUSTOMER ORDER,
_
1363-417
IMP VIA SHIP DATE
OUR TRUCK 0710812022
`per
1657,62
MERCHANDISE
SHIPPING CHARGE
TOTAL DUE
I
01
0 1
0
L0
1667112
w 1
6,013.03
114
LI QR JA ELECTRIC SUPPLY
1011 BAY BLVD.
CHULA VISTA. CA 91911 - -
T: 6194272370
SOLD TO:
T & BA ELEODBA PERRY
11519 WOODSIDE AVE
SANTEE, CA 9 071
COUNT 'NAB.
ItY881 JOB .1273 SUNROAD "OFFS IMRROV
�.. A[
OTT
ORDERED
5
T
PRODUCT CODE
SDPRE
N0
N O AT AFF SIG
JIS A IY! WfIU .TI Y N a � IMEAC& M.1
Invoice
* Rafe
INVOICE LI I DATE
PLEASE SHOW I V I AND REMIT TO: PO - �",w.
Box i47068
Los Angel. CA90084-7068
SHIP TO:
T & ELEC!D A PERRY
1011 I3AY BLVD.
CHULA VISTA. CA 91911
JOB NAME
BRA DON
SHIP' VIA
WILL CALL
DESCRIPTION
SHIPPED
Ill�. # L'# FCr:," F '1 1311 �, }F. +I �i
MED
�q���y}}�11 WU-SWAB N RECOVER MOIR I�
'ldf*Atilg ULED ! MSTOCL UNABLE1y# PURCHASE LAU .
CUSTOMER DER No
1.78590
+�+ML
SHIP DATE
0310112022
TOTAL DUE d
0
3 9..39
■
5-7.05
7.90
Project Title:
Project No.:
ExtraWork/Construction Delay
El Toyon - Las Palmas Bicycle Corridor
CIP NO 19.G2
Location: 8th Strut and T Street
Description of Work: Open up all potholes & Grind $' all around and pave back
Equipment
equip. No.
;He.
ifoudyRate
(Do not add rums, use separate sheet If neceasery )
!Victoria's andfor Work done by Specialists
Dare Oran
Perry Electric- DLC
please see attached
Extended mt.
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
.00
$0.00
$0.00
so.0car
No. of Units
1
L 1
Sub -Total:
Contractor's Representative
Accepted for Progress Payment:
Resident Engineer
CM Form MUM( 11111)
$0.00.
$0.00
$0.00
$0.00
$0.00
$0.00,
out mist Eifindedmo4
$5.702.64
$.702.64
$0.00
$0.00
,00
$0.00
Sub -Total:
$0.00
$5, 702.64
Date Performed:
Date Reported:
Report No.:
Labor
Nowt
ire
OT
Hourly Rate
7/20 022
7/26/2022
12
Extended AnA
Reg.
OT
Re.
OT
Reg.
OT
Reg.
OT
Reg.
OT
Reg,
OT
Reg.
OT
Reg. Hrs. = $0.00
(Do not add rows., use separate sheet If rteces ry)
OT Hrs. - $0.00
i
20a
Total E
Sub Contractor ??
Vera, a=rip 0
$0.00
$0.00,
$0.00
$0.00
$0.00
:0.00
$0.00
0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Sub -Total
Labor Markup*
Total LaborCost
ui ' rent I Material Cost:
EQuipitviarl Markup'
Total E p lfat'1 Cost
1Sub Markup*
Total Sub Cost
DAILY TOTAL;
so.o0
$0,00
$0.00
$0.00
$0 00
$0.00
$0.00
$0.00
$51987.77
$a,sa7:rr
"' For TRO Projects: Labor== 0%, EquipIMet1=10%, Sub=5%
See Contract Special Provisions
City Of National City
Contras or Job: 1363 - El Toyer .. Las Palmas Bicycle Corridor
Work Performed By: T& , Inc. DBA Perry Electric (For CrestConstruction
[ripicnorwciic $ih t 8 T i �I ,�Company)
Lip A- Pothole & Grind 6. All Around And Pave Back
Labor Charges
oraitsvii -Employae Nam
LaI ELC SBP-2B Perry
ac SSMN J uesBIe
LDS ELL A-1
ELc SPA
LOS OE BRB
A Meza.
P Aleman
B Gunter
DAILY EXTRA WORK REPORT
Contract;
PT Hr OT Hrs Subs Unita
6.00
6.00
Equipment Charge
1D Clans Model i A2
Eon 82 � -- - � -
EN 50
N54
E05 42
E05 B 1T-A
!T C-3
We AMIN BAD
EN MINI EX
Eno ROLLER
TRUCK T&TT 20-28
TRUCK T&TT 12-20
TRUCK T&TT 80
6.00
8.00
6.00
1942
Sub: PERRYELECT 6ii: 7.0 Job: 1361 5. 64
Mange Order
Billing Number
Report Dale
Perform Date
RT Rate OT RateSubs Rule Extended
44.480
46.010
51.7 0- T
TRUCK T&TT 12-20
TRUCK T&TT 12_ 0
TRACS <50 A
RTHru
8.00
.00
OT Mrs
42.890
82.970
RT Bate
39.410
37.190
266.700
276.060
310.2D
343.120
497.820
OT Rate Delay Fad !clended
315.280
6.00
MRCP PORT 01 6-05►
TEA FLAS TM
HCECL BOAT E20
ROVIB WACK ROi 1A
.00
6.00
74.690
37.190
6.00
Material/SpecialistWork/Lump Sum or Unit Price Payment
Number Date 'e ar e s and Deson onIA0_
1 36216684 7f20/2022 Main Marietta 15 Tons lir Gib C2 ..�
M02 382215653 7/2W2022 Martin Marietta 12 Bucket Tack Oil
Mae 36215710
M04 36215618
6.00
I.140
448.140
223.140
3.140
163.360-
20,800 124.800
37.190
27.230
7.0
7/20/2\022
7/20/2022
Labor Charges
RT Labor 1,694.02
1 0.0, 1 9,40
OT Labor 000
Subtotal Labor
Subsistenc ►
Other Expenses
MU 20.00%
Labor Total
1,86342
0.00
0.00
37�8
2;236810
Equipment Charges
Subtotal 1,914.94
,r 15.00% 2.8224
Equipment Tom 2,202.18
6.00 4B0 1 Material Char
6.00 sub14.7+ 0 I9.580 cr i 1,099.44
6.00 14.080 u 15.
84.480
7120/2022 Martin Marietta / Decomposed Granite3/8th
772012022 Martin Marietta / Ducn,p-P ckup
T&M Electric, Inc, DBA Perry Electric
P.O. Box 710180, Santee. CA 92072
Phone: 019.449.0045 Fax: 619.4 8.0511
aI 8111 Form
Urite
1.000
Accepted:
Cu ffort
Un4 Price Extended
d
435.14000 435,14
1.000 LS 129.30000 12940
1.000LS 153.27000 15327
1.000 LS 3$1.73000 301.73
Materrial Total 1,26483
Activily To
,702 64
Welk Total 5,702.1
Subtotal
4
5,702.64
BMW 4 51702a64
aThrnrimmTmonw=mminomiv?III. core
Ex
„,,thoirr.
tra WorkSerial No
EL Tentative Agreement
JOB NAME:
LOTION:
Descriptiork of Work Peri. armed (be detailed):
rEqujp ment Rental Company
Work Force Names
Per C iC - Representative NQrne
DATE:
J08 NO.: