El Toyon-Las Palmas Bicycle Corrido
GIP No:19-02 77 AU.) 2 2 A 2b
Contractor: Crest Equipment inc.
fea, on/Purpose for this Change Order:
The City has directed the contractor to remove the newly installed striping a
curb to better accommodate parking.
CITY O-F NAflONAL CIT
CHANGE ORDER NO. 6
August 17, 2022
restripe the bike lane and
The City of National City and Contractor agree to the following change to the original Contract:
The City has directed the contractor to remove the dedicated bike lane striping and bike legend, gray the red
curb and provide two additional sharrows for SEA Grove between 18th and 20th. All related costs has been
'authorized at the agreed lump sum price listed below.
Original Contract Amount
Net change by previously authorized Change Orders.. _.. _ , ..... .
Subtotal ..
Amount of this change order �...r�
New contract amount s e
Working days added: 10 Working days subtracted: 0
`l ,8 1,798.;7
.*• ..63,187.24
134 8.1
7,748.27
... + $ 1,352
Percent change in Contract to date .5.5%
Submitted by:
Manager
8717-22
Date
City Project lnaer
Date
Rik
Approv - d by:
City i deer Date City Manager, to mod fix Change Ordr s >524.9-99 Date
By sig ing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly
negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and
labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the
price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor,
supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions
of the original contract documents are incorporated herein. 2 originals: I for City Clerk, I for Contractor)
c e ted and agreed to by Contractors name
Name:
(z tp(V klO (Y'L4'1'r 1T' l-1 • 20- "a"-•
Date
Note to Contractor: if you do not agree with this Change Order you may be directed to proceed with this work under the terms of the
contract and you may proceed under protest You must comply with the contract requirements of submitting a written protest to protect
your claim.
Originals: City Clerk, Contractor
1243 National City Boulevard, Notional City, CA 91950
cc: Engineering project file, Project Manager
Telephone (619) 336-4380
161 Scoftford Drive
El Cajon, California 9 0 1
Phone: 19 444 0 1 Fax: 9)44 0
Customer Name
[City Of Nation City
1243 National City Blvd
National City, CA 91950
Item GDescription
'Labor Est Equipment Supervisor
Subcontmctor Stateside Stripes
Subcontractor Crest Mark Up
LIC 0921
DIR # 10000054
EM/BME # 36251
SLBE # IOCE0072
POC WBE 9EN00060
Ship To
Proposal
Date
Estmate*
8/15/2022
3368
El Toyon Las Palmas Bicycle
Corridor Project
CEP No 19-02
Additional Striping and Koval - - -
Invoices must be paid 30 days or a 5% fine charge will be applied
We appreciate this opportunity to bid this project and look forward to doing
business with you. This bid is good for 30 days.
HRS
LS
LS
Unit Price
1,159.52
,#0
313.75
Statewide Stripes, Inc.
P.O. Box 600710
San Diego, CA 2160-0 10
858.560.6887
858.560.0158 fax
Tax ID #33-0915254
Class: C32
SB# 40 21 DBE# 32232 LBE# 516672
SBA-8a Contractor ,! DIR# 1000001334
Citstortter
o
CA Lie. #78E1286
Sine 1990
Signatory Local 1184
Crest Equipment Inc.
161 Scottford Drive
El Cajon, CA 92021
ritOrgCT
ESTIMATE
DATE
NO.
El Toyon Bicycle Project - Crove St
DESCRIPTION
872
29
62
2
i Toyon Bicycle Project - Grove St
Apx. Ian. Pt of Paint Removal
Apx. Sq. Ft. of Thermoplastic Removal
Paint curb Gray
Thermoplasticnarrow Marking
8/10/2022
21477
SCB
TERMS
Net 30
Includes: Prevailing wages, one mobilization, removal by viterblasting, items listed
Excludes: Traffic control plans or permits, items not listed
Stipulation: Work to be completed with in two weeks of a signed estimate
TOTAL
6, 0.0
EXCLUDE Staiewide Stripes as not responsible for following:Cleanup of construction debris or dirty surfaces, Removal and/or striping outside of work area, curb
qtriping, Liquidated Damages. Badging or Tining. Bonds, Notary services, Night work. Prevailing wages, Flashing beacon assemblies, Mast arm signs. & A.D.A.
Compliance; unless items are specifically included in the estimate. items not specifically included arc excluded and require an additional Bid.
Retention is to be paid 30 days From Statewide Stripes' completion of work
Adjust Cancellation Clause (S250.O0 ea Cat, Additional Insured Endorsements on Auto Liability @ $75.00 ea.
This proposal is based on an hour shift per workday. any overtime (premium time) will he paid by the Prime Contractor.
Proposal is valid lbr 6 months From date above or revision date indicated
If accepted, this proposal will be incorporated as an exhibit to the contract or purchase order.
STATEWIDE STRIPES, INC REQUIRES TWO WEEKS ADVANCE WRITTEN NOTICE MDR TO SCHEDULING.
ACCEPTANCE OF ESTIMATE AND AGREEMENT
The undersigned bcreby contracts for the services noted above and agrees to pay For the services upon completion and receipt of an invoice. The uddetsigned agrees to
pay reasonable attomey's fees and costs if incurred In the enforcement of this contract.
Co. Name:
Date:
By: Signatare;
riot Name and Title)