Loading...
HomeMy WebLinkAbout2022 CON Crest Equipment Inc. - El Toyon Las Palmas Bicycle Corridor CIP No. 19-02 Change Order No. 6TUJ Lu Cr: CAL NATI. ' L. airy 1 .i.4 E D .� . _. , � r _a ��t Wp f t r ! El Toyon-Las Palmas Bicycle Corrido GIP No:19-02 77 AU.) 2 2 A 2b Contractor: Crest Equipment inc. fea, on/Purpose for this Change Order: The City has directed the contractor to remove the newly installed striping a curb to better accommodate parking. CITY O-F NAflONAL CIT CHANGE ORDER NO. 6 August 17, 2022 restripe the bike lane and The City of National City and Contractor agree to the following change to the original Contract: The City has directed the contractor to remove the dedicated bike lane striping and bike legend, gray the red curb and provide two additional sharrows for SEA Grove between 18th and 20th. All related costs has been 'authorized at the agreed lump sum price listed below. Original Contract Amount Net change by previously authorized Change Orders.. _.. _ , ..... . Subtotal .. Amount of this change order �...r� New contract amount s e Working days added: 10 Working days subtracted: 0 `l ,8 1,798.;7 .*• ..63,187.24 134 8.1 7,748.27 ... + $ 1,352 Percent change in Contract to date .5.5% Submitted by: Manager 8717-22 Date City Project lnaer Date Rik Approv - d by: City i deer Date City Manager, to mod fix Change Ordr s >524.9-99 Date By sig ing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. 2 originals: I for City Clerk, I for Contractor) c e ted and agreed to by Contractors name Name: (z tp(V klO (Y'L4'1'r 1T' l-1 • 20- "a"-• Date Note to Contractor: if you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor 1243 National City Boulevard, Notional City, CA 91950 cc: Engineering project file, Project Manager Telephone (619) 336-4380 161 Scoftford Drive El Cajon, California 9 0 1 Phone: 19 444 0 1 Fax: 9)44 0 Customer Name [City Of Nation City 1243 National City Blvd National City, CA 91950 Item GDescription 'Labor Est Equipment Supervisor Subcontmctor Stateside Stripes Subcontractor Crest Mark Up LIC 0921 DIR # 10000054 EM/BME # 36251 SLBE # IOCE0072 POC WBE 9EN00060 Ship To Proposal Date Estmate* 8/15/2022 3368 El Toyon Las Palmas Bicycle Corridor Project CEP No 19-02 Additional Striping and Koval - - - Invoices must be paid 30 days or a 5% fine charge will be applied We appreciate this opportunity to bid this project and look forward to doing business with you. This bid is good for 30 days. HRS LS LS Unit Price 1,159.52 ,#0 313.75 Statewide Stripes, Inc. P.O. Box 600710 San Diego, CA 2160-0 10 858.560.6887 858.560.0158 fax Tax ID #33-0915254 Class: C32 SB# 40 21 DBE# 32232 LBE# 516672 SBA-8a Contractor ,! DIR# 1000001334 Citstortter o CA Lie. #78E1286 Sine 1990 Signatory Local 1184 Crest Equipment Inc. 161 Scottford Drive El Cajon, CA 92021 ritOrgCT ESTIMATE DATE NO. El Toyon Bicycle Project - Crove St DESCRIPTION 872 29 62 2 i Toyon Bicycle Project - Grove St Apx. Ian. Pt of Paint Removal Apx. Sq. Ft. of Thermoplastic Removal Paint curb Gray Thermoplasticnarrow Marking 8/10/2022 21477 SCB TERMS Net 30 Includes: Prevailing wages, one mobilization, removal by viterblasting, items listed Excludes: Traffic control plans or permits, items not listed Stipulation: Work to be completed with in two weeks of a signed estimate TOTAL 6, 0.0 EXCLUDE Staiewide Stripes as not responsible for following:Cleanup of construction debris or dirty surfaces, Removal and/or striping outside of work area, curb qtriping, Liquidated Damages. Badging or Tining. Bonds, Notary services, Night work. Prevailing wages, Flashing beacon assemblies, Mast arm signs. & A.D.A. Compliance; unless items are specifically included in the estimate. items not specifically included arc excluded and require an additional Bid. Retention is to be paid 30 days From Statewide Stripes' completion of work Adjust Cancellation Clause (S250.O0 ea Cat, Additional Insured Endorsements on Auto Liability @ $75.00 ea. This proposal is based on an hour shift per workday. any overtime (premium time) will he paid by the Prime Contractor. Proposal is valid lbr 6 months From date above or revision date indicated If accepted, this proposal will be incorporated as an exhibit to the contract or purchase order. STATEWIDE STRIPES, INC REQUIRES TWO WEEKS ADVANCE WRITTEN NOTICE MDR TO SCHEDULING. ACCEPTANCE OF ESTIMATE AND AGREEMENT The undersigned bcreby contracts for the services noted above and agrees to pay For the services upon completion and receipt of an invoice. The uddetsigned agrees to pay reasonable attomey's fees and costs if incurred In the enforcement of this contract. Co. Name: Date: By: Signatare; riot Name and Title)