CIP No: 19-02
Contractor: Crest Equipment Inc
CHANGE ORDER NO. 5
July 26, 2021
Reason/Purpose for this Change Order.
The City has directed the contractor to install twelve speed cushions along U Ave at tour locations.
The City of National City and Contractor agree to the following change to the original Contract:
The City has directed the contractor to install twelve speed cushions along U Ave between 4th and Division at
four separate locations to replace the existing asphalt speed bumps removed during paving. The new speed
cushions meet National City Fires request. All related costs has been authorized at the agreed lump sum
price listed below.
Original Contract Amount I .
Net change by previously authorized Change Orders
Subtotal........ „
Amount of this change order
New contract amount
$ 1,281,798.37
37,895.41
1,319,693.78
25,291,83
$ 1,344,985.61
Working days added: 0 Working days subtracted: 0 Percent change in Contract to date 4.93%
Submitted by
P
En in
..
7-27-22
Date
City Pro'ect Manager Date
City Manager, required for Change Orders >s24.999 Date
By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly
negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and
labor necessary' to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the
price is fair and complete and represents all costs associated with the work, Including but not limited to all equipment, materials, labor,
supervision, overhead, fees, bonds,, insurance, profit, etc. and that there will be no further compensation. Ali of the terms and conditions
of the original contract documents are incorporated herein. (2 originals: I for City Clerk, I for Contractor)
Accepted and agreed to by (Contractor's name
Name:
'l • 21 ZO27-
Date
Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the
contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect
your claim.
Originals: City Clerk, Contractor
cc: Engineering project file, Project Manager
1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-43E0
161 Seottford Drive
El Cajon, California 92021
Phone: 619 444-50 1 Fax: 61 47- 540
Customer Name
City OfNaonal City
1243 National City Blvd
National City, CA 91950
Item
Subcontractor
Subcontractor
LIC # A892791
DIR # 1000005405
DDEMBE/UDBE # 36251
KBE # lOCE0072
PM WEE # 9EN00060
Description
Payco Speed Cushions
-3 Cushion Per location 4 Locations)
Ship To
El Toyon CIP No19-02
Extra Work:
Additional Speed Cushion
Invoices must be paid 30 days or a 5% gnaw charge will be applied
We appreciate this opportunity to bid this project and look forward to doing
business with you. This bid is good for 30 days.
i A tare Pima Sim & Return
LS
Unit
Date
Proposal
Estimate
[6/20/2022 I 3361
Est. Quanity
1
Unit Price
24,087.46
5.00%
Total
Total
24,087.46
1,204.37
$25,291.83
Pa SSpecialties, Inc. A WOMAN OWNED BUSINESS
Highway ay - Airport - Parking Lot - Signage - Striping - Marking & Removals
Si3E #18502 -DBE 1 BE #102 - LABORERS LOCAL UNION #1134 - LICENSE #298637 C-32
CA D(R REGISTRATION #1000003515
CHANGE ORDER
Project Description: 21105 - EL TOVON RD CO SPEED =IONS
Contract Time Limit:
NA W.D. Ltquidatvd Damages:
Item clam
No. De cri 'can
NA
Bid Date;
t C.O.
Estimated Unit of
Quantity Measure
bollard)
Excludes Couiie yellowstripion rdddle speed cushion, Cannot
gurarfige pent '0 nther paTrenent actziort
07/25/2022
Adtdandurms Noted:
Note See Aitacivad Prod= Cata Sheet for PioPPosed SPeed
Cushicn To Ele installed
Unit
Price
NA
Item
Total
1
.10
S
STIPULATIONS: RECIPIENT 15 RESPONSill3LE POR ALL STiPULATiON NOT fiE #=INN ANID BELOW
• ANY badging, security checks, railroad classes+ project required safetytrainIng will be billed at TRIM to contractor
• A signed Purchase Weir or Subcontract is required prior to any work associated with this Primal.
* This Proposal .Is based on an S hour shift per workday. any overtime (premium time) r ri l l be paid by the Prime Contractor.
• Thhs Prop sal is valid for 30 days after ete bid sate.
• If acted, this Proposal vAll be incorporated as an Exhibit to the Urntract or Purchase Ortler.
* A rrinirnurrt of 21J working days schedule notice In wrltling Es required AFTER ALL PAPERWORK IS COMPLETED.
• Bond cost to be paid by Prime Contractor.
• Cancelatlon dune for any shift of work called off within 12 Firs of siwwup time Is $2,500
• industry surd insurance available up to S aOD# , LIMIT- Railroad irtsurance ExaUDED
• A Mobilization 1 M In is any work accomplished eve shifts. Unavailable work and all extra-w+a t iMll be
charged addled mobilkradons upon completion.
• Pam are net 10 days. Retention is to be paid 3D days from iPayco's completion on of work.
• QX ttUDES LL MAST AIM SIGN5,SIGN STRUCTURES. APID ELECTRICAL SIGNS
• in the event of significant delay cw Rice increase of rented al occurring during the performance of the contract throat no fault of
Payco SpeclafGies I the contract sum, time of pertbnrance, and contract requirements s shall be equitably adjusted by clan order
In accordance with the procedures of the contract docurrents. A clam In mice of an item of rrra1erlaa shall be considered significant when
the price of an item increases by ten percent between the date of this cat and the clate of installation
EXCLUSIONS:
ENGINEERING - TRAFFIC CONTROL PLANS & PERMITS - PERMITS - FLAGGERS- BONDS - LDS - HAZARDOUS WASTE REMOVAL- - NO PARKING BARRICADES
TRUNCATED DOMES - CURS PAINT REMOVAL - BOLLARDS - CONCRETE CURE REMOVAL* CUSTOM SIGN POST - MAST ARM SIGNS - ILLUMINATED SIGNS -
FLASHING BEACONS - STRIPING- PAVEMENT MARKING
INCLUSION:
INSTALL RLISBERFORM SPEED CUSHIONS ONLY
of Working Days to Complete our Wort;
BID AMOUNT: $24,087.46
of Move.in"s Allotted: 1 Add`I c vEln°s: $
3.000.00
ESTIMATOR: JEREMY GRIFFIN
120 North Second Avenue, Chula Vista, CA 91910-1127
Phone (619) 422-9204 f Fax (619) 427-1620
PSI -21105 EL TOYON LAS PALIVIAS BICYCLE CORRIDOR
CHANGE ORDER BREAKDOWN
SPEED CUSHIONS REVISED ESTIMATE 0712512022
Labor Charges
aI Level
LDI L RPH F4
L03 LB PH
too LBRPH G1
LBRP 4
Employee Name
AY
E ROBLEDO
E LUNA
DA RIFF1
MARTIN
Firr is
16.00
16.0
16.00
16.00
16.00
r•MYr ... omits T a T afa dubs Pale
.450
41.680
62,E
87.450
Equipment Charges
prnent ID Glass Make Model Al A Tors OT Hrs
1 TRUCK T&TT 12-20 -.-.-
16.00
502 14 tRUCK P P217
314 -...- TRAFC 2TC D100
16.0
_16.00 — 25.200
RT Rate OT Fate Delay Factor
MdendEd
17111.200
1'51.3
4 666.880
11079,200
Extended
37.190 595.E
50.060 800.960
403.200
MateiiitliSpeciafist Lu p Sum or Unit Price Payment
Number Date Veer a description
l 3600 -613/2022 Sharpline SolutionS R11RFORM SPEEDCUM-4114�
.) New Bel
Resuiamittal
NTS Universal Bill Form
For Owner/Resident Engineer% Use Only
riApproved tor Payment
Returned for Correction
Date cf Action;
IDate Received:
Accepted:
Customer
C
on cfa :
1.0 L
Labor Charges
FIT Labor 4,907.04
OT Labor
Subtotal Labor
Subsistence
ce
Otheri�Expenses
MU 29 0O%
Labor Total
0.00
43907.04
0.00
00 .
I T42..04
6,330,08
Equipment Charges
1,.
20
269.88
Unit Price wed. a
13,642.0000D 13.642.067Equipment Total 2,069.08
Date:
Dale:
x
Sub
MU 15.00%
Material Charges
Sum 13,642.00
MEI
15,00% 2 046.30
Material Total 15,688.30
1 Activity Total 24,087A6
IWort Total 24,087.46
Bill Subtotal .. ' 24,7A6
Bill Total +
age
•
,o87.4.6
SharpLine Solutions, Ino.
545 Rinisdale Ave. #1546
Covina, CA 91722
626-257-8328
ADDRESS
PAYCO Specialties
120 North 2nd AVE
CHULA VISTA 91910
SHIP VIA
Factory Direct
SHIP TO
PAYGO Specialties
120 North 2nd AVE
CHULA VISTA, CA 91910
SharpLine Solutions, Inc.
Quote 3600
DATE 07 0t2022
EXPIRATION DATE 7120/202 '
DESCRIPTION
O1Y COST AMOUNT
py; 121 7:811V x 3o".L ArrowSpeed Cushions Pius inst I Hardware
RFPARF-SCLC
Rubberforrn Speed Cushions- Left Corner, 3"H x 15-1 /4"U x 40'TL
RFM:R .SRC
Rubberform Speed Cushions- Right Corner, 3"H x 15-114"W x 4O"L
RFM:RF-SC
RubberForm Speed Cushion Ramp, 3"rH x 161W x o"L, no arrow! no hardware
F FM:RF RPA
RubberForm Sped Cushion Ramp, 3"H x 16"Vt1 x 40"L, with arrow, no hardware
RF. RFHWK1 o
Hardware Kit- Speed Cushion for 10 part Cushion, lag bolt 1Ommx12 n ),
washer: (!c9)1#nchors_pc4c), lla l caps 4O), dual connector (dogbane) (24)
-�am�F
RFM:RF-SCEPR
Speed cushion 2-Component Epox Resin (Tube with 2 nozzles)
RI=:F-S+RDc3
Resin Dispensing Gun
Accepted By
SUBTOTAL
TAX
SHIPPING
24 59.24 1,421.6T
24 59.24 1,421.76T
48 82.56 3,962.88T
24 99.84 2,396.16T
12 138.56 1,662.72T
12 41.74 4► 500.8 T
1 143.59 143.59T
11, 09.75
1,007.10
1,125,15
TOTAL
$13,642.00
Accepted Date
Certified SBE (Micro) & DBE #2008403
Credit Cards Accepted. 3% Fee Applies..
Make all checks payable to; Sharpline solutions.
LI)
iihrrct @454i %%lbgb%Tr$,. k4e
h Aka
CU S I Jrii
All RubberForm speed cushions are designed for easy installation
and to he maintenance -free. Each module has been carefully
designed to ensure that all pieces interlock without difficulty. The
surfaces of our product exhibits a high quality appearance with no
loose material or fiber -like finishes. Quality, value and safety are
just a few of the many goals we set for our products,
Asphalt and concrete speed bumps and speed humps are rarely
consistent heights. Require road closures for installation or
pavement and are normallyremoved for or road repairs. Then are reinstalled causing additional road
closures, delays and expenses.
RubberForm products do not require road closures for installation or removal. They do not require heavy equipment,
large crews or the difficufties
associated with delivering proper quantities to the job site in a timely fashion. They
can be easily installed as a permanentfixture, a
temporary test or for work zone safety. This versatility is highly cost
p
effective.
Asphalt speed reducers cause havoc with low riding vehicles and usually stow critical emergency vehicle response
time, Our speed cushions are a consistent " in height and are designed to
have no effect on low riding vehicles. Minimal Effect if any, on Emergency
Vehicle Response Time!
irifgai te
Neighborhood, bicycle, • Effectively slowing traffic without
motorcyle and skateboard damaging tires or vehicles.
friendly ® 100% Post Consumer Recycled
• Versatile arrow configurations Tire Rubber
Modules connect with a
propriety dog bone, no
interlocking puzzle pieces
• Modular design for custom sizing
- widths and lengths
▪ Longest warranty on the market
• Speed Slots for Emergency
Vehicles
▪ Patented
▪ Made in U.S.A.
■ Only U.S. Manufactured
Cushion
100/36 Recycled
Material
UV Resistant
Made in the LEE '
USA
Te: (626) 257-B328 I safes@sharpline-solutians.com
www.sharpline-solutions.com
SharpLine
tri
i-)
�,IJJ Jf1
Left
Ramp
i;pecifications:
10 pc 78" x o" Modular System
Or
e
• None or single white arrowhead
• Angle Irons Not Required
From 2 to 6 white arrowheads
▪ Angle irons are Included
M Ws:
RF-RKSCLC
▪ Speed Cushion Left Corner
RF-RICSCRC
a Speed Cushion Right Corner
RF-RKSCRP
■ Speed Cushion Ramp - No Arrow
RF•RKSCRPA
▪ Speed Cushion Ramp with arrow
Hied vaim
Installation Hardware lit, includes stainless steel lag bolts,
washers, rubber caps, anchors, connectors and adhesive
4
78" x 80"
7,
t!7 IF r 7r
I
•
i1'
11114:341i
it fr
Tel: (626) 257-8328 `sales@sharpline-salutions.com
www.sharpline-solutions.com
Right
O.� ..., .
a arcfs Boole lite.