HomeMy WebLinkAbout2022 CON Crest Equipment Inc. - El Toyon Las Palmas Bicycle Corridor CIP No. 19-02 Change Order No. 3— CtU.IVORt IA
Nagritarom.CiTy
El Toyon-Las n-Las Palmas Bicycle : orrid r
CIP No: 19-02 -=
Contractor: Crest Equip ment J r-ic.
lFi;1 M11*o Iti ET)
Reason/Purpose for this Change Ordei.e. 4 r
The City has directed the contractor to install a 6" curb at the back of sidewalk, cold mix the walk way at the
intersection of 18th & Grove, and the contrabtor also ran into an unmarked & unforeseen gasoline and
waterline while constructing the bio swale on T Ave.
CHANGE ORDER NO, 3
May 6, 2022
The City of National City and Contractor agree to the following change to the original Contract:
The City has directed the contractor to remove existing sidewalk forms and reinstall new forms for a 6" curb at
the NE corner of 18th & Grove to facilitate a design modification. The city has also directed the contractor to
place cold mix within the pathway on 18th St for pedestrian safety due to delays caused by the SDGE service
order delays. The contractor encountered an unmarked gasoline & waterline while constructing the bio swale
box along T Ave. and encountered delays while the utilities were researched. All work was performed on a
T&M basis for the total price listed below.
...,$ 1 , 2 8 1,798,37
Net change by previously authorized Change Orders .....R..,., 14
Subtotal.......
Original Contract Amount... , ... , ...
Amount of this change order
New contract amount.
Working days added: 0
•RMR■SlRi
Working days subtracted:
Submitted by:
roiect tanager
LApproved by:
.r
Percent change in Contract to date
1, .96,659. 1
'I , 3.7
1,298 043.78
1.27%
at _ City P ect 1" ariager _ _._. = ..... _ . y ...Date
4/22
En * ineer Manager, Cityl�an� fi5qervei: for Charge Orders 424,999 Date
By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly
negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and
labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the
price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor,
supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. AD of the terms and conditions
of the original contract documents are incorporated herein. (2 originals: I for City Clerk, I for Contractor)
Accepted and agreed to by (Contractor's name):
Name:
Date
Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the
contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect
your claim.
Originals: City Cleric, Contractor cc: Engineering project file, Project Manager
1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380
Extra Work/Construction Delay
Project Title: ES To, ±ate Palma Bicycle Corridor Date Performed:
Date Reported:
Report No.:
Project No.
Location: T Street
P NO 1942
Description of Work: Bio Swale Box: Unmarked & Unforseen Gasline and Waterline
!Equip. No.
Equipment
Hours
Hourly Rate
Extended A
50.00
CE-29
Crew Truck
2.0
$28,48
$56.92
305ER
Excavator
1.0
$40.28'
$4028
$0.00
$0.00
$0.00
$0.00
$0.00
'0,00
(Do not add rows, use eepsrite sheet if nec siiary)Sub-Total:
$97_20
Materials andfor Work done by Sp ciailsts
_
No of �i -
Exiernr dA L
Description-
$0.00
$0.00
$0.00
111�
$0.00
$0.00
Sub -Total;
$0.00
Corm acis Representative
Accepted for Progress Payment:
Resident Engineer
5/2/2022
5/5/2022
Labor
MUM
Hearty Rats
&tended A
t rynn a r s
eg.
2.0
5116.48
$232.96
$0.00
Cola Bello
F .
2.0
$114•48
$2 8.96,
OT
$0.00
Req.
$O.00
OT
$0.00
Reg.
$0.00
OT
$0.00
Reg.
$0.00
OT
$0.00
_6
$0.00
OT
$0.00
Reg.
,
Ci-
$.00
OT
$0.00
Reg.
1
$0.00
$0.00
(Do not odd rows, use separate sheet If necessu ) -
Rag. Hrs. s $461.92 OT Hrs. = $0.00 Sub -Tut $481. 92
2O %!jL tJor Markup
Total Labor host
Total Egiiip rent / Material Cost:
15'°1jEgwap/M3t"t Markup*
Sub Contractor 7?
term O'No »
0
5141
Total Equip/Marl Coat
Sub Markup*
Total Sub Cost
DAILY TOTAL:
$92.36
$554.30
$97.20
514.58
$111.78
$0.00
L festal
* For TRO Projects: Lab 0%, Equlpl lat" 1O%, Su
See Contract p aRe callPrcvlslons
DPW Form CE4971 (Rev 11111)
Crts.caicl F.r*:ogem:...5, Coy4.141Xe+
Location: lath street
Extra Work/Construction Delay
Project Title: El Toyon Las Palmas Bicycle Corridor
Project No.: OPNO19-02
Description of Work: Cold Mix Walk way At SOG&E Service Pole on 18th Street
kqtup. Nat
Equipment
Hotta
fiewirI.Uttincliect Arne
CE-24
_Grew Truck
1.0
$28.48
528.46
310
Backhoe
1.
45.2.3
$45..21
$0.00
$0.00
..
$0.00
$0.00 r
SO 00
$0.00
$0.00
$0lOii
Wm
_$0.00
$0.00
50.00
50.00
50.00
(Do not add rows, use separate shoot if triece
DIY)
Sub -Total:
$73_69
Materials andlor Work done ley Specialists
Description
"NO, of Units
-
Extended- t& '
Cold Mix
1.4
$100.56
5140.7B
i
$0.00
$0.O
4
0.00
r
0.00
-- - _ -
. 00
_ - _
` $14.78
r -, Sub -Total
Contractor's Represenla0 e
Accepted for Progress Payment:
Resident Engineer
Labor
Guwynn Harris
Cole aelio
Date Performed: 5/5/2022
Date Reported: 5/6/2022
Report a.: 5
(Dci add rows, us
Reg. Hrs. = $ 30.96 OT Hrs.
NORM
Hourly Rids
Extended Amt.
Reg.
R 1,0
$116.46
S116.48
OT
4-
SO 00
Re2_
1.0
$114.48
5114.48
OT
$0.00
Reg.
0.00
OT
-
` $0400
Peg.
-
$0.00
OT
$0.00
l ie%%
$0y00
OT
_
$0.00
Reg. ,
Tyr
--
_ _
moo
$0.00
Reg.
.
$0.00
OT
I separate
$0.00
_ _
WOO
sheet if necessary)
Sub -Total:
$230.96
r 20%, Labor M a rkup*
$46.19
Total Labor Cost 127715
Total E i ur i Merit l Material Cost
Equip/Marl Markup*
Sub Contractor ??
g=Yes, 0=Afo
0
5` c,
$21 .47
$32,1 7
Total Equip/Mat'l Cost $246.64
Sub Markup*
Total Sub Cost
DAILY TOTAL:
i
$523.80 I
* For TRO Projects: Labor=30%, EquipfMat'1=10%, Sub=5%
See Contract Special Provisions
DPW Form CE4971 (Rev 11/11)
Project Title:
Project No.:
Location: lath Street and Grove
Extra WorkfConstruction Delay
El To on - Las was Bicycle o of
CIP NC 19-02
Description of Work: Remove Sidewalk Form AT NrE Bump Out to lnt !i 0"
Eq No,
EquiPment
Hours
$0.00
.4
.00
$0.00
$0.00
o.ott
0.00j
$ ..o0
- --
0.00
0.00
0.00
-
$0 00
$0.00
$0.00
(Do not add rows. use aspirate sheet If neaeryt
Sub -Total:
SO.00
ndJar'1f Park cane by Siec mists
No. o Units
- Unit Cost
ExtenL
Delefigndoh
$0.00
$0.0
Sub-Total!
$0.00
ontr 3 ors Rep
Accepted for Progress Payment:
Resident Engineer
Date Performed: 542022
Date Reported: 516i20
Report No.: 6
Hourly Rate
Extended Amt.
Re .
0,5
$114.48
$5724
;:,,
OT
$0.00
Reg.
0.5 y
$8023
40.1
nGuerrero
EOT
.0)
s -
0.5 °
$43.46
$21.73
Cody Severn
OT
.
Re w _
0.5
S .14
"
�.07
[]avid
OT
$0.00
- -
Reg.
$0.00
OT
SUM
Reg.
$0.00
OT
$0.00
Rag.
$0.00
OT
$0.00
Reg.
$0.00
OT
$0.00
(Do net add my" use
Reg. Hrs. = $162.16 2.16 OT Hrs. =
separate
$0.00
shut it necessary)
Sub -Total.
$162.16
22% Labor Markup*
$32.43
Total Labor Cost $194.59
Total E * uipment f Material Cost
15%
Sub Contractor ?
toYeei, r No > 0
Equip/Maul Markup*
Total EqufplMat`f Cost
5%J Sub Markup'
Total Sub Cost
DAILY TOTAL:
$0.00
$0.00
$0.00
$0.00
$194.59
For TRO Projects: Labor=30%, EquIrAtlet'1=10%, Sub=50.6
See Contract Spacial Provisions
DPW Form CE4971(Rev 11!tl)