CHANGE ORDER MEMORANDUM
January 10, 2023
To: Roberto Yana
Director of Engineering & Public Works/City Engineer
Engineering and Public Works Department
City of National City
From: Josh Johnson
Project Manager
Project Professionals Corp
Project: Paradise Creek Educational Park Extension
CIP-NT.: 19-33
Subject: Change Order No. 10
Change Order No. 10 provides `or:
The additional cost to furnish and install the Dogipot Quik Pet. Station as per the revised landscaping
plans provided by Neri Landscaping.
Payment for this change order will be as agreed upon at a lump sum price.
upporting in rmation;
On August V, 2022 Neri Landscape Architecture provided a revised landscaping plan that included the
installation of a Dogipot Quik Pet Station. Following the installation of the pedestrian pavers, the
Contractor submitted RFI 25 inquiring about the planned installation of the Dogipot station in the paver
area. The Contractor was directed by PPC to install the foundation in the planter area adjacent to the
pedestrian pavers to avoid damaging newly installed improvements.
Time fed/L+stment:
One (I) additional working day is being added to this change order for the time necessary to complete the
additional scope of work.
Cost Adjustment:
The additional cost for this change in the scope of work has been agreed upon at a lump sum price of
1,49.49. The cost for this change of work accounts for all labor, equipment, materials and all other work
associated with this change order.
The pay method and amount have been reviewed by the Project Manager and are considered fair and
reasonable. The supporting documentation is on file with the project records.
2j20/2023
Pct M ger Date
kows CALIFORNIA
%TiONAL Cfl'y
3 3
( or.
I CORp RATttl
PARADISE CREEK EDUCATIONAL PARK EXTENSION
CIP NO. 19-33
Contractor: Tri- r oup Construction and Development.
9580 Black Mountain Rd. Ste. L
San Diego, CA 92126
CHANGE ORDER NO.
January 10, 2023
This Change Order modifies
Contractor's and the it s obligations and rights under the abovementiened
contract. This change order is not effective until approved by the City.
Time ad`ustment:
One (1) additional working day is being added to the Contract,
Cost of Change Order:
The City and the Contractor agree
that the Contractor shall proceed with installing the Dogipot Quik
' revisionsprovided by Neri Landscapingdated August `'�, 2022. The
Pet Station as per the landscaping rev�r�i concrete footing and
includes but is not limited to excavation and installation of the
additional workrent
• i Dogipot luik Pet Station. Thetota[r ount for at tabor, rnater l e
installation of the
other associated work is 1,49+6.49.
Recommended by Project Manager --kosh Johnson, Senior CM
Date: 2/20/2023
- a
By signing this Change Order the Contrac r confirms that he/she is completely familiar with and has fairly
negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the
provide materials and labor necessary to a complete work as described above at that the price
price is fair and complete and represents all costs associated with
stated herein. Contractor confirms that the the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds,
insurance, profit, etc. and that there vv l
will be no further compensation. All of the terms and conditions of the
original contract documents are incorporated herein. The signer for the Contractor confirms that he/she is
authorized to bind the Contractor to this Change Order.
Agreed and Accepted by Contractor:
(Print Name and Title)
Approved by City Engineer:
Approved by City Manager:
(Required for change orders $25,000 and above)
14-66w agG.^aSl
Date:
Date:
Fr 0121512;
'31./2/2;
CALIFORNIA -
NATIONAL Cilltr
PARADISE CREEK EDUCATIONAL PARK EXTENSION
CIP NO. 19-33
DATE: January 10, 20 3
CHANGE ORDER NO. 10
WORK PERFORMED BY: Tri-Group Construction & Development
DESCRIPTION OF WORK: : Install DogipotStation.
ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT
Labor Apprentice
MATERIALS
1)
2)
Dogipot Station
Concrete Footing
Unit
Unit
EA
EA
Sub -Total Labor:
Labor Markup (0%):
Qty
1.00
4.00
Rate
r
257.20
8.00
T ota i
113.84
768.56
TOTAL LABOR:
Total
257.20
32.00
Sub -Total Materials: 289.20
Materials Markup (15%):
43.38
TOTAL MATERIALS:
Sub -Total Equipment:
Equipment Markup (15%):
TOTAL EQUi I PM ENT:
SUBTOTAL:
1% BOND:
GRAND TOTAL:
922.27 1
332.58 I
1,481.67
14.87
1,496.49