HomeMy WebLinkAbout2023 CON Project Professionals Corp - Paradise Creek Educational Park Extension CIP No. 19-33 Change Order No. 10PfOFES =,C i+ LS CJRPQPATIDNI. CHANGE ORDER MEMORANDUM January 10, 2023 To: Roberto Yana Director of Engineering & Public Works/City Engineer Engineering and Public Works Department City of National City From: Josh Johnson Project Manager Project Professionals Corp Project: Paradise Creek Educational Park Extension CIP-NT.: 19-33 Subject: Change Order No. 10 Change Order No. 10 provides `or: The additional cost to furnish and install the Dogipot Quik Pet. Station as per the revised landscaping plans provided by Neri Landscaping. Payment for this change order will be as agreed upon at a lump sum price. upporting in rmation; On August V, 2022 Neri Landscape Architecture provided a revised landscaping plan that included the installation of a Dogipot Quik Pet Station. Following the installation of the pedestrian pavers, the Contractor submitted RFI 25 inquiring about the planned installation of the Dogipot station in the paver area. The Contractor was directed by PPC to install the foundation in the planter area adjacent to the pedestrian pavers to avoid damaging newly installed improvements. Time fed/L+stment: One (I) additional working day is being added to this change order for the time necessary to complete the additional scope of work. Cost Adjustment: The additional cost for this change in the scope of work has been agreed upon at a lump sum price of 1,49.49. The cost for this change of work accounts for all labor, equipment, materials and all other work associated with this change order. The pay method and amount have been reviewed by the Project Manager and are considered fair and reasonable. The supporting documentation is on file with the project records. 2j20/2023 Pct M ger Date kows CALIFORNIA %TiONAL Cfl'y 3 3 ( or. I CORp RATttl PARADISE CREEK EDUCATIONAL PARK EXTENSION CIP NO. 19-33 Contractor: Tri- r oup Construction and Development. 9580 Black Mountain Rd. Ste. L San Diego, CA 92126 CHANGE ORDER NO. January 10, 2023 This Change Order modifies Contractor's and the it s obligations and rights under the abovementiened contract. This change order is not effective until approved by the City. Time ad`ustment: One (1) additional working day is being added to the Contract, Cost of Change Order: The City and the Contractor agree that the Contractor shall proceed with installing the Dogipot Quik ' revisionsprovided by Neri Landscapingdated August `'�, 2022. The Pet Station as per the landscaping rev�r�i concrete footing and includes but is not limited to excavation and installation of the additional workrent • i Dogipot luik Pet Station. Thetota[r ount for at tabor, rnater l e installation of the other associated work is 1,49+6.49. Recommended by Project Manager --kosh Johnson, Senior CM Date: 2/20/2023 - a By signing this Change Order the Contrac r confirms that he/she is completely familiar with and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the provide materials and labor necessary to a complete work as described above at that the price price is fair and complete and represents all costs associated with stated herein. Contractor confirms that the the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there vv l will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. The signer for the Contractor confirms that he/she is authorized to bind the Contractor to this Change Order. Agreed and Accepted by Contractor: (Print Name and Title) Approved by City Engineer: Approved by City Manager: (Required for change orders $25,000 and above) 14-66w agG.^aSl Date: Date: Fr 0121512; '31./2/2; CALIFORNIA - NATIONAL Cilltr PARADISE CREEK EDUCATIONAL PARK EXTENSION CIP NO. 19-33 DATE: January 10, 20 3 CHANGE ORDER NO. 10 WORK PERFORMED BY: Tri-Group Construction & Development DESCRIPTION OF WORK: : Install DogipotStation. ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT Labor Apprentice MATERIALS 1) 2) Dogipot Station Concrete Footing Unit Unit EA EA Sub -Total Labor: Labor Markup (0%): Qty 1.00 4.00 Rate r 257.20 8.00 T ota i 113.84 768.56 TOTAL LABOR: Total 257.20 32.00 Sub -Total Materials: 289.20 Materials Markup (15%): 43.38 TOTAL MATERIALS: Sub -Total Equipment: Equipment Markup (15%): TOTAL EQUi I PM ENT: SUBTOTAL: 1% BOND: GRAND TOTAL: 922.27 1 332.58 I 1,481.67 14.87 1,496.49