HA GE ORDER MEMORANDUM
February 8, 2023
To: Roberto Yano
Director of Engineering & Public Works/City Engineer
Engineering and Public Works Department
City of National City
From: Josh Johnson
Project Manager
Project Professionals Corp
Project: Paradise Creek Educational Park Extension
C1P No.: 19-33
Subject: Change Order No. 7
Change e r d er No. 7 provides for:
Removal of the vehicular pavers placed per plan along the westerly edge of the SS Building. The additional scope
also includes setting pavers in mortar above the 30'x3' concrete bike rack pad.
Payment for this change order was by force account.
Supporting ing Information:
After installing pavers per the approved plan at approximate station 1+3.14, the Contractor identified an
aesthetic issue with aligning the new pavers with the existing pavers. Installing the pavers per the plan would
result in an angular pattern not congruent with the new improvements and would require additional cut pavers.
The Contractor suggested removing the pavers, placing a paver band and realigning the new pavers to the easterly
edge of the new improvements. The Project Manager agreed that the solution suggested allowed for the pavers to
fit the new improvements and still tie-in to the existing pavers.
In accordance with the bike rack revisions provided by Neri Landscaping on November 17, 2022, the Contractor
was directed to mortar the pavers to the concrete pad installed for the bike racks in Change Order 46.
imeAdu,st er t:
One (1) additional working day is being added to the contract for the time necessary to remove the installed
pavers prior to realignment.
Cost A f us tmen t,.
The additional cost for this change in the scope of work has been agreed upon at a lump sum price of 4,45.44.
The cost for this work was determined by force account.
The pay method and amount have been reviewed by the Project Manager and are considered fair and reasonable. The
supporting documentation is on file with the project records.
1 t
LJ OR A .ff
i
PARADISE CREEK EDUCATIONAL PARK EXTENSION CHANGE ORDER
CIP 19-33
Contractor: Tri-Group Construction and Development.
9580 Black Mountain Rd. Ste. L.
San Diego, CA 92126
February 8, 2023
This Change Order modifies Contractor's and the City's obligations and rights under the abovernentioned
contract. This change order is not effective until approved by the City.
Time adjustment:
One (1) additional working day is to be added to the Contract.
Cost of Chan. e order:
The City and th•e Contractor agreed that the Contractor proceeded under force account with removing
the placed pavers and realigning the new pavers with the additional paver band. Additionally, mortar
was placed between the pavers and the 30' x 3' x 4" concrete bike rack pad. The additional work
included but is not Iirnite Qremovai of the r +e ,-plac n---pa-ver ar dd mbar setting ate
pavers for the bike rack. The total amount for all labor, material, equipment and all other associated
work is $4,495.44.
Recommended by Project Manager:
Date: 0/23/23
By signing this Change Order the Co 'ractor co firms that he/she is completely familiar with and has fairly
negotiated its price, terms and conditions. if thi: Change Order is approved, Contractor will provide all of
. pR � p the
equipment materials and labor necessary to provide a complete work as described above at that the price
stated herein. Contractor confirms that the price is fair and complete and represents all costs associated with
the work, Including but not limited to ail equipment, materials, labor, supervision, overhead, fees, bonds,
insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the
original contract documents are incorporated herein. The signer for the Contractor confirms that he/she is
authorized to bind the Contractor to this Change Order.
Agreed and Accepted by Contractor:
(print Name and Tile)
Approved by city Engineer:
Approved by City Manager:
(Required for change orders $25,000 and above)
kri, 40J "421 %
Date:
Date:
Date:
2.. t4.
) 0 I 15
CALIFORNIA - c-
NATIONAL_ CI
lito.;3,(;3Ly
C-1."I CORFORATED
PARADISE CREEK EDUCATIONAL. PARK EXTENSION
CIP NO. 1933
-
DATE: December 1202022
CHANGE ORDER NO. 7
WORK PERFORMED BY: Teri -Group Construction & Development
CUESCRIPTION OF WORK: Additional Paver Work
2)
3)
4
ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT
Laborer
La borer
La borer
La borer
Unit
HR
HR
HR
HR
Qty
16.00
16.00
8.00
8.00
Wage
75.35
75.35
75.35
7
75.35
Sub -Total Labor:
Labor Markup (15%):
Qty
Rate
Sub -Total Materials:
Materials Markup (15%):
TOTAL MATERIALS:
Total
1,205. GO
1,205.60
$ 602.80
60.80
,G16.80
542.52
TOTAL LABOR:
Tota I
SUBTOTAL:
PRIME MARKUP (5 ):
4159.32
4,281.37
214.07
GRAND TOTAL:
4,495.44