HomeMy WebLinkAbout2023 CON Project Professionals Corp - Paradise Creek Educational Park Extension CIP No. 19-33 Change Order No. 80.P0,_. i PROFES E. r ":1 L5 CDRPOPATIOi' CHANGE ORDER EMORA.N U 'l January 24, 2023 Roberto Yano Director of Engineering & Public Works/City Engineer Engineering and Public Works Department City of National City From: Josh Johnson Project Manager Project Professionals Corp Project: Paradise Creek Educational Park Extension CI P No.: 19-33 Subject Change Order_1 o. Change Order No. provides for: The additional cost to mill and pave to a depth of 3" over approximately 9925 SF in lieu of performing full -depth pavement removal and rFeplacement. Payment for this change order will be as agreed upon at a unit price per ton. Supporting information: While excavating for placement of the electrical crossings for the flashing beacons on 18th Street, the Contractor identified groundwater and unsuitable soil below the existing asphalt.. In order to avoid this issue while performing frill -depth removal and replacement of asphalt as per the original approved plans, the Project Manager suggested to mill and pave the existing asphalt. As this operation would provide significant savings by resulting in the deletion of line items regarding excavation and backfilling with base materials and filter fabric, the Project Manager directed the Contractor- to extend the paving limits to include more of the existing cracking in the asphalt along 18 ' Street. ,Time Adjustment: Thirty-one (31) additional working days are being added to the contract for the additional time necessary to coordinate and perform the change in scope. Cost d/ustrrrnt. The additional cost for this change in the scope of work has been agreed upon at unit price per ton. 181.73 tons of asphalt were placed at $250.88/ton for a total cost of 45,5 2.4 .. The pay method and amount have been reviewed by the Project Manager and are considered fair and reasonable. The supporting documentation is on file with the project records. 2/23/23 Date N 4)-", cm. FOltiVikTio.! orcoRPon& r o PARADISE CREEK EDUCATIONAL PARK EXTENSION CHANGE ORDER NO. CIP NO.19-33 Contractor: Tri-Group Construction and Development. 9580 Black Mountain Rd. Ste. L San Diego, CA 92126 January 24, 2023 This Change Order modifies Contractor's and the City's obligations and rights under the abovementioned d contract. This change order is not effective until approved by the City. Time adjustrnent: Thirty-one 1 additional working days are to be added to the Contract. Cost of Change Order: The City and the Contractor agree that the Contractor shall proceed with milling and paving halt to asphalt a depth of 3" approximately 9925 SF in lieu of performing full -depth pavement removal and replacement. The total amount for all labor, material, equipment and all other associated work Is $45592.42, Recommended by Project Manager: 1 Date: 2/23/23 By signing this Change Order the Co r ctoi- co irms that he/she is completely familiar with and has fairly negotiated its price, terms and conditions. If thi -'Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to p ovide a complete work as described above at that the price stated herein. Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc, and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. The signer for the Contractor confirms that he/she is authorized to bind the Contractor to this Change Order. Agreed and Accepted by Contractor: (Print Name and Title) • Approved by City Engineer: Approved by City Manager: (Required for change orders $2 ,000 and above 44-0S•-• r-J6.0 Date: 2 ' .. Date: pitizal Date: 31 ISI Z-3 CALIFORNIA NATIONAL CIS ir, ,t, C-- 'iv D PARADISE CREEK EDUCATIONAL PARK EXTENSION CHANGE ORDER N, CIP NO. 19-33 DATE: December 21, 2022 WORK PERFORMED BY: Tri-Group Construction & Development DESCRI PTI O N OF WORK: RK: Revised Asphalt Paving ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT MATERIALS i IAlphaIAA - Type III C2 PG6/1-10 Unit TN Qty 181.73 Rate 250.88 Sub -Total Materials: Total 45,59 .42 45,592.42 TOTAL MATERIALS: 45,592A2 GRAND D TOTAL: I$ 45,592.4