HomeMy WebLinkAbout2023 CON Project Professionals Corp - Paradise Creek Educational Park Extension CIP No. 19-33 Change Order No. 80.P0,_. i PROFES E. r ":1 L5 CDRPOPATIOi'
CHANGE ORDER EMORA.N U 'l
January 24, 2023
Roberto Yano
Director of Engineering & Public Works/City Engineer
Engineering and Public Works Department
City of National City
From: Josh Johnson
Project Manager
Project Professionals Corp
Project: Paradise Creek Educational Park Extension
CI P No.: 19-33
Subject Change Order_1 o.
Change Order No. provides for:
The additional cost to mill and pave to a depth of 3" over approximately 9925 SF in lieu of performing full -depth
pavement removal and rFeplacement.
Payment for this change order will be as agreed upon at a unit price per ton.
Supporting information:
While excavating for placement of the electrical crossings for the flashing beacons on 18th Street, the Contractor
identified groundwater and unsuitable soil below the existing asphalt.. In order to avoid this issue while performing
frill -depth removal and replacement of asphalt as per the original approved plans, the Project Manager suggested
to mill and pave the existing asphalt. As this operation would provide significant savings by resulting in the deletion
of line items regarding excavation and backfilling with base materials and filter fabric, the Project Manager
directed the Contractor- to extend the paving limits to include more of the existing cracking in the asphalt along
18 ' Street.
,Time Adjustment:
Thirty-one (31) additional working days are being added to the contract for the additional time necessary to
coordinate and perform the change in scope.
Cost d/ustrrrnt.
The additional cost for this change in the scope of work has been agreed upon at unit price per ton. 181.73 tons of
asphalt were placed at $250.88/ton for a total cost of 45,5 2.4 ..
The pay method and amount have been reviewed by the Project Manager and are considered fair and reasonable. The
supporting documentation is on file with the project records.
2/23/23
Date
N
4)-", cm. FOltiVikTio.!
orcoRPon& r o
PARADISE CREEK EDUCATIONAL PARK EXTENSION CHANGE ORDER NO.
CIP NO.19-33
Contractor: Tri-Group Construction and Development.
9580 Black Mountain Rd. Ste. L
San Diego, CA 92126
January 24, 2023
This Change Order modifies Contractor's and the City's obligations and rights under the abovementioned
d
contract. This change order is not effective until approved by the City.
Time adjustrnent:
Thirty-one 1 additional working days are to be added to the Contract.
Cost of Change Order:
The City and the Contractor agree that the Contractor shall proceed with milling and paving halt to
asphalt
a depth of 3" approximately 9925 SF in lieu of performing full -depth pavement removal and
replacement. The total amount for all labor, material, equipment and all other associated work Is
$45592.42,
Recommended by Project Manager:
1
Date: 2/23/23
By signing this Change Order the Co r ctoi- co irms that he/she is completely familiar with and has fairly
negotiated its price, terms and conditions. If thi -'Change Order is approved, Contractor will provide all of the
equipment, materials and labor necessary to p ovide a complete work as described above at that the price
stated herein. Contractor confirms that the price is fair and complete and represents all costs associated with
the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds,
insurance, profit, etc, and that there will be no further compensation. All of the terms and conditions of the
original contract documents are incorporated herein. The signer for the Contractor confirms that he/she is
authorized to bind the Contractor to this Change Order.
Agreed and Accepted by Contractor:
(Print Name and Title) •
Approved by City Engineer:
Approved by City Manager:
(Required for change orders $2 ,000 and above
44-0S•-• r-J6.0
Date: 2 ' ..
Date: pitizal
Date: 31 ISI Z-3
CALIFORNIA
NATIONAL CIS
ir, ,t,
C-- 'iv D
PARADISE CREEK EDUCATIONAL PARK EXTENSION CHANGE ORDER N,
CIP NO. 19-33
DATE: December 21, 2022
WORK PERFORMED BY: Tri-Group Construction & Development
DESCRI PTI O N OF WORK: RK: Revised Asphalt Paving
ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT
MATERIALS
i IAlphaIAA - Type III C2 PG6/1-10
Unit
TN
Qty
181.73
Rate
250.88
Sub -Total Materials:
Total
45,59 .42
45,592.42
TOTAL MATERIALS:
45,592A2
GRAND D TOTAL:
I$
45,592.4