Reason/Purpose for this Change
IThe contractor was directed to install a 3309pull box at the SDG&E service Via,
i
2DB
CITY OF
1 w, fftik
Y•
� e 1
a.- I
s r , 4_•.`
CHANGE ORDER NO..9
March 31, 2023
The City of National City and Contractor a r e th the following
oi� care to the original Contract.-
The contractor was directed to install a 0 pull be a
of the original ��� � t the DG&E service point. this pull box was not part
p a. A►ll work and related costs regarding the added pull box has
agreed lump sum price listed below, been authorized at the
Original Contract Amount
rr r•* a t y■ a r .r * 4 a r� r i a■ t�
Net change by previously authorized Change Orders
Subtotal
• F • i i t
Amount of this change
New contract amount
Working days added: 0 Working a subtracted: 0
Submitted by:
I
anaer
11pved
5-5-23
DateJJ,FtoJect4anager
Ii t ■'i i i`
Pia■■��l�tklaaafrr*.■■
..r
1, 403 820.00
52 164.94
11455 984.94
1 442.70
Percent change in Contract to date 3.82%
City__ - - `- -� - �,, .a ..-.hwaw ._.t11•-..Y-Y..., .L.IY tz .. L.,. La
yy 'neer Date City tyr Manager,. required far Chence orders >$24 999 Date
1,4 a7,427.64
By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms_
negotiated its price, terms and conditions. It this Change girder is approved, Contractor - and conditions and has fairly
I� will prude all of the equipment, materials and
labor necessary to provide a complete work as described above at that the price stated herein. Additionally,Contractor
hat the
price is fair and complete and represents .ail costs associated with the work, including but not limited to all equipment, ui m materialconfirms,
labor,
q p ertt, mateoals, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions
of the original contract documents are incorporated herein. originals: 1 for City Clerk, IT for Contractor)
Accepted and agreed to b o traetort name)
i
Name:
4
forr 4:6,3 v. fbr-Sw-.5
q( V74 ,f2•3
Date
Note to Contractor: If you do not agree with this Change Order -you maybe directed to proceed with this work under the termso
contract andyou may of the
proceed under protest. You must comply with the contract requirements of submitting a written protest to protect
your claim.
Originals: City Clerk, Contractor
1243 National City Boulevard, National City, CA 91950
cc: Engineering project file, Project Manager
Telephone (619) 336-4380
PROJECT:
EATE-
R
L
Lekos Electric, loci
I S67 - Citywide Safe Routes - ll �r ll
3.132023 , 4..13.2023
CO3- SDGE 3309 Parldhoie- revised 2
T E
ATTNI
Tri Group
MESSAGE: The foilowing Is a requestiat a change order for to form and I tO a 5DGE 3309 handhole and stubo ut up the power pole
Imo: SDGE. As diswased with David Gman art that 1d, neither the plans nerthe specs call for an added SOGE putft,ox/ser rce point to be
ir,stalred Chang.* ortier fiEs for win znd material privelausiv supplied'r;-d irstatkd.
Item
33[92 Pu`I EDX ICES irk -trice
Attache -di
Units • Unit IsiiiOt
EA
SUBTOTAL.
Thank you.
Rite1_ v,
1, 3/4 :C01 1 17 _Cl3
374.40
T"ri-Groip 5'°JMU S68.70
Total $1, . 70
07/ 7 / 02 14 : 51 : 50 SAN DIEGO GAS AND ELECTRIC
CONSTRUCTION ORDER - CUSTOMER COPY
PAGE NO
D]SIGN NUMBER : 80581365
WORK ORDER: STATUS: OSNO IP PROJ iOT I F: 300000483814 JOB N T F: 3 O 0 0 O 0 4
DESIGN DESCRIPTION: LS2-SP Approval-20th & Newell -NC
START DT: 03/07/ 0 2 END DT: 07/31/2022 JOB NAME: LS2-SP Approval-20th & Newell -NC
LOCATION:
DISTRICT : CMT CITY: NC
EXISTING FACILITIES INSTALLED ON:
CUSTOMER CONTACT: Roberto Ruiz.
DESIGNED BY:Ignacio Richard
JOB COORD: Tucker Deborah
ADDRESS:
MATN WORK CENTER: CPD METRO ELEC UG
PHONE:619-307-5593
860 JOB TYPE:DN-LS MCU ORDER#. 431484E
RELATED JOB NOTIFICATION:
PHONE: 85863674!4 DATE ISSUED:
PHONE:6196766801 PROJ t GR:Ignac o Richard
NO. OF L
CATIONS: 1
THOMAS BROS:
PHONE :8 8.6367444
ONE-WAY TRAVEL TIME: 0.3000 YARD TIME: 1.2000 TRAVEL YARD FACTOR: 0.2903
LOCATION: 0003 LOCATION DESCRIPTION: TRENCH, EXCV, BCKFL, COS BY CUST/EXIST ARM DISTRICT: CMT LOCATION 1 OF
=
WRK FUN
C_ ID
STOCK
DE S C R: ;-' a° I O N
QTY
RQD 'UM
,ACT
QTY
WRK
RSP
MAT
RSP
ACCT
TRMT
STAN
PAGE
I.NST/APP
BY
DATE
I-N-S
I-N-S
I-ITT-S
I-N-S
I-N`S.
I- -5
I--N-S
3'HD--A
SH-12H
330918HH
X09H18
1DB3-S
1DB3SB
3 „CP-a
S162688
S 4 9664
S3 2 048
lq1,2472
HAND DIG TRENCH 3 FT DEEP AVE
SHADE TRENCH BY HAND - 12 IN WIDE
THOLE 3309.1, 18 INCHES DEEP
BOX, 24X36X18" POLYMER CONCRETE
33.09.1 INSTALL EXCAVATION/REMOVE
1-3 IN DB CONDUIT SEC
CONDUIT, DIRECT BURIAL, 3" IPS (DR10
1-3 IN DR 90 D 36 IN R BEND SEC
EL B air 3" IPS, 90 DEGREE, 3 " RADIUS
CP BEND SCH 80 3 IN
ELBOW, 3" SC1 80 PVC (CONDUIT RISER
SPLICE
0)
1
10
1
1
1
10
10
I
I
1
1
FT
FT
EA
EA
EA
FT
FT
J_A,
EA
F
.EP.0
C
C
C
C
C
C
G7453
G7405
3312
3..A9.1
3373.1
3373.2
4204.3
C
C
C
C
WRK FUN FAC CODE DESC
EXIST TAG
NEW TAG:
LOC 003 0 COMPLETED
P 18 4 3 4 ;• 4 4 1 3
0 PARTIALLY COMPLETED 0 ENERGIZED
AS -BUILT RECORDED BY: DA'lE :
MATERIAL CHECK BY: DATE:
Sempra Energy «Wilily.
8/10/2022
ICC, LLC
Sean Gill
PO Box 6211
Norco, CA 92860
Dear Sean Gill:
Project if 300000483814
Job It 30000 483860
Subject: PROJECT 3-483860 - L - P APPROVAL- OTH & NEWELL-NC STREET LIGHT SERVICE POINT
COST LETTER
This notification is to inform you that the engineering and Costs to provide a service point fo.r your
proposed lighting installation has been completed.
The attached sketch indicates a handhole will be installed adjacent to pole number P183474413 to provide
120/240-volt service.
X. You will provide all trenching, sidewalk break and repair, excavation, backfill and installation of the
p
secondary hand hole (lid shall read SDG&E). Additionally, you are responsible for providing and installing
conduit from the handhole, to andincluding thecable pole riser material. Additional responsibility includes
providing and installing ladder arms, pulling conductor, and making connections. Your cost will be 2,4.
SINGE will be represented in the field by an Inspector and all work and material shall be subject to
inspection at all times. Our Inspector may be contacted prior to the start of your trenching to answer any
questions you may have regarding your project.
Inspection of your work by an 5DG&E Inspector is required at the trenching, conduit installation, conduit
mandreling, backfill, compaction, (substructure installation, if applicable) and completion stages of
construction. After your trench and conduit have been inspected by SDG&E, our underground cable can be
scheduled in 10 working days. Your light will be energized after SDG&E receives inspection from the City of
National City.
An excavation permit from the city of National City will be required prior to any excavation work in street
property.
2
EASEMENTS
If easements are required before the final construction order can be issued, your project will be placed 'on
hold' until all necessary easements within your project and from adjacent property owners have been
acquired by SDG&E.
Please return the Customer Payment Remittance form, and payment for 2,498 payable to SDG&E.
Project Management Offices are unable to accept payments. All payments may be mailed to:
Customer Payment Services — CP11w1
San Diego Gas & Electric
P.O. Box 12 831
San Diego, CA 921i =9831
Once your payment and Customer Payment Remittance form are received, your construction order will be
issued.
This offer shall expire at the end of business day on 11/10/2022. If business negotiations are not
completed, or if you request revised costs after that date, an engineering fee An -ay, will be required.
Also, please understand that SDG&E is subject to California Public Utilities Commission decisions —any
changes directed by the Commission can affect the quotes..
The costs quoted in this letter include a cost component to cover the utility's estimated liability for State
and Federal Income Tax.
Online Portal & Contact Information
Did you know you can access your Planner's contact information and track the progress of your project
on the new SDG&E Builder Services Portal? Visit e.comilmilder-portal and have your Project #:
300000483814 and Access Code: 153734.
We appreciate your business and hope you are very satisfied with our service. If I may be of further
assistance or should you have any non -construction -related questions (easements, charges, etc.), please
call me or your Project Support Coordinator at the number below. Our office hours are 7:00 a.m. to
4:00 p.m., Monday through Friday. For additional information, visit sde.com/builder-services.
Sincerely,
Rich Ignacio
Project Planner
619-676-5132
said
Stirniaro Energy my'
1
511Z,
LA
0
N
X-ST EAST 20TH
Customer to install 3309.1 is e!ed
DGc E, placed within 10' of
P183474413 and in franchise
portion.
45-100
1-50 HE
P183474413
s
LAS PALMAS PARK
San Diego Gas & Electric
Elg f esrgn & Construcijon management
Project Notification #30,00004-834914
Job Notification ,i#34044+E
Pict MCR/Planner Name ,& Phone:
—
.Richard 'Ignacio (619) 676-5132
Date; 7/2712022
Address. East 2atti& Newell St. NC
Prolect Coordination: (619)699-1039
C imer POO Roberto Pull 67c1-3O7A5593
41,
a.
Ex. Comm —
SDGE New 3"
Climbing Space
Cable Pole Detail
P183474413
NOT TO SCALE
Know what's below
Call 811 before dig.