CHANGE ORDER NO. 3
April 13, 2023
The City of National City and Contractor agree to the following change to the original Contract:
The City has directed the contractor to use Cable Pipe & Leak Detection to determine the location of the Gas
line/utility locations on the East side of the building prior to placing the condesor unit for the new walk in
cooler. CPL is required for locating private utilities outside of the public RIW. All work has been authorized at
the agreed lump sum price listed below.
Original Contract A►mount.....
Net change by previously authorized Change Orders
Subtotal
Amount of this change order
New contract amount
• •+•A s lu.ss 60 III toss 11.11.41$1011•1111111110010•NONIIBIIIIIIII
Working days added: 0 Working days subtracted: 0
Submitted by.
4-18-23
ip ct ylana,ger ...........,Date Cit f Project Manager
599,810.00
11,2 .00
611,042.00
662.81
611,704. 1
Percent change in Contract to date 1.98%
Approved by.
Daie
City Engineer Date Ci Manager, required for Change Orders >$24,999 Date
By signing this Chan Order t _ Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly
negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and
labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the
price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor,
supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions
of the original contract documents are incorporated herein. (2 originals: l for City Clerk, t' for Contractor)
Ac and : yea► by E&H eneral Contracting Inc.:
c--/e4/e0,23
Date
Note to Contractor: If you 'o not agree with this Change Order you may be directed to proceed with this work under the terms of the
contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect
your claim.
Originals: City Clerk, Contractor
-1 iatiunBi GLy a a N ti of -City,
2e9/2.
Tyk,
cc: Engineering project file, Project Manager
Telep-h-onelet91 336=4380
*1' 2_
E&H General Contracting inc.
8402 i i, Magnolia Ave. Suite B
Santee, CA 92071
TITLE:
Underground Locator
Phone: (619) 486-655a
'Pax: (619) 486,6897
PROJECT: Kitchen Remodel and flooring Replacement
TO: Attn: Sean Gill
ICCS, LLC.
PO Box 62 1 i
Norco, CA. 92860
PROPOSED
CHANGE ORDER
No. 5
DATE: 04,11012023
JOB: 22-105
CONTI CTIPO: CIP 140 22-06
SU LI'I•TED:
COMPLETED:
REQUIRED:
DESCRIPTION
Per request from Construction Manager, Please see the attached cost from Cable Pipe & Leak
Detection.
CPL`s Proposal is for 2 hours Minimum and includes Prevailing Wage, Atditonal Hours are changed at
$300 a Hour.
Num item
I
2
APPROVAL
E3y:
Date:
Description
2 Hours Loc-aeon - Minimum
Fuel Charge
Ref
Qty Unit Unit Price Amount
2.000 300.00 800.00
1.000 25.00 25.00
Item Total:
E&H Overhead WA)
Bond Coat (1%)
By:
Date:
Total:
$625.00
25
$6.56
$862.81
4/4/2023
Cable Pipe 61 Leak Detection
' 'S. 'E.' II'V-1•6917.S''''
Teri Krurnmel
Project Coordinator
CPI. Detection
619 673-1534 F 619-873•1 30
Company name: E & H General Contractor
Project: 140 E 12th St., National City
Scope: Locate and mark utilities in areas directed by customer. Amass to all areas in and around work site, Including
utility rooms, manholes/utility vaults, shut off valves, sewer/drain lines, and other structures may be necessary to
complebe the mark out. As -built drawings/facility maps may be needed to locate utilities that are non-conductive
and/or rind structures that are not visible. Depths and line size to be provided where available; depths will be
considered estimated until potholed/verified. Storm train Lines and Sewer lines over b" in diameter may require CCTV
tra loom llitits-charged-at r-additional-rate7 'rip -owr quests-for-1ocatln -ou ide-of s e-will-be- harged-at
the hourly rates listed below.
UtilibliaganintadalSagiUM
Prevailing Wage Hourly Rate: $300/hr. - 2 hr minimum
gfitinlidedjam 2 hours
Fuel Surcharge:
Mobilization fee: n/a
Per Diem: no
Mapping & Reports: none
Estimated Ott 625.00
{ _ _ {-
5 5� i•!i� r • .fir it fi .: �, it lL • rj."
Cable, Pipe & Leak Detection, Inc. agrees to perform the service indicated in a proper and professional
manner, using equipment standard for this type of service, to the best of our ability. Customer
understands that Cable, Pipe & teak Detection, Inc. makes no warranties end/or guarantees Expressed or
implied, and that no consequential damages will be recoverable due to the work performed hereunder. in
the event we are locating urnderaround utilities, customer fully acknowledges that some utilities are simply
"Untraceable" and we shall not be liable for any losses or damages due to undetected utilities_ Customer
actcnowledgcs rates are minimum basic and do not include prevailing wagejcertilled payroll requirement
cads, and that they have read and understand this ngreement and have executed the agreement
voluntarily
CPL Safi Diego 114014. Socon 1. i it ac 201. t::1 Goie . C J20 t 1 Toti Froc 80-4 aQ- kf` i I Tel ti l9-87; -153#1 I Vox 64 •17 15 I www,cpidelcclion,com
I