HomeMy WebLinkAbout2023 CON E&H Contracting Inc. - MLK Community Center CIP No. 22-06 - Change Order No. 3I—. C A L t F O R JOA ""ra MLK Community Center C l P No: 22-06 Contractor: E&H General Contracting, Inc. Reason/Purpose for this Change Order: � Ai r k,fi t' , 4e r "re The City has directed the contractor to use Cable Pipe & Leak Detection in order to determine utility locations on the East side of the building. NATIONAL Mr (eNcITTeir e . . w f � 14. 1 � CHANGE ORDER NO. 3 April 13, 2023 The City of National City and Contractor agree to the following change to the original Contract: The City has directed the contractor to use Cable Pipe & Leak Detection to determine the location of the Gas line/utility locations on the East side of the building prior to placing the condesor unit for the new walk in cooler. CPL is required for locating private utilities outside of the public RIW. All work has been authorized at the agreed lump sum price listed below. Original Contract A►mount..... Net change by previously authorized Change Orders Subtotal Amount of this change order New contract amount • •+•A s lu.ss 60 III toss 11.11.41$1011•1111111110010•NONIIBIIIIIIII Working days added: 0 Working days subtracted: 0 Submitted by. 4-18-23 ip ct ylana,ger ...........,Date Cit f Project Manager 599,810.00 11,2 .00 611,042.00 662.81 611,704. 1 Percent change in Contract to date 1.98% Approved by. Daie City Engineer Date Ci Manager, required for Change Orders >$24,999 Date By signing this Chan Order t _ Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. (2 originals: l for City Clerk, t' for Contractor) Ac and : yea► by E&H eneral Contracting Inc.: c--/e4/e0,23 Date Note to Contractor: If you 'o not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor -1 iatiunBi GLy a a N ti of -City, 2e9/2. Tyk, cc: Engineering project file, Project Manager Telep-h-onelet91 336=4380 *1' 2_ E&H General Contracting inc. 8402 i i, Magnolia Ave. Suite B Santee, CA 92071 TITLE: Underground Locator Phone: (619) 486-655a 'Pax: (619) 486,6897 PROJECT: Kitchen Remodel and flooring Replacement TO: Attn: Sean Gill ICCS, LLC. PO Box 62 1 i Norco, CA. 92860 PROPOSED CHANGE ORDER No. 5 DATE: 04,11012023 JOB: 22-105 CONTI CTIPO: CIP 140 22-06 SU LI'I•TED: COMPLETED: REQUIRED: DESCRIPTION Per request from Construction Manager, Please see the attached cost from Cable Pipe & Leak Detection. CPL`s Proposal is for 2 hours Minimum and includes Prevailing Wage, Atditonal Hours are changed at $300 a Hour. Num item I 2 APPROVAL E3y: Date: Description 2 Hours Loc-aeon - Minimum Fuel Charge Ref Qty Unit Unit Price Amount 2.000 300.00 800.00 1.000 25.00 25.00 Item Total: E&H Overhead WA) Bond Coat (1%) By: Date: Total: $625.00 25 $6.56 $862.81 4/4/2023 Cable Pipe 61 Leak Detection ' 'S. 'E.' II'V-1•6917.S'''' Teri Krurnmel Project Coordinator CPI. Detection 619 673-1534 F 619-873•1 30 Company name: E & H General Contractor Project: 140 E 12th St., National City Scope: Locate and mark utilities in areas directed by customer. Amass to all areas in and around work site, Including utility rooms, manholes/utility vaults, shut off valves, sewer/drain lines, and other structures may be necessary to complebe the mark out. As -built drawings/facility maps may be needed to locate utilities that are non-conductive and/or rind structures that are not visible. Depths and line size to be provided where available; depths will be considered estimated until potholed/verified. Storm train Lines and Sewer lines over b" in diameter may require CCTV tra loom llitits-charged-at r-additional-rate7 'rip -owr quests-for-1ocatln -ou ide-of s e-will-be- harged-at the hourly rates listed below. UtilibliaganintadalSagiUM Prevailing Wage Hourly Rate: $300/hr. - 2 hr minimum gfitinlidedjam 2 hours Fuel Surcharge: Mobilization fee: n/a Per Diem: no Mapping & Reports: none Estimated Ott 625.00 { _ _ {- 5 5� i•!i� r • .fir it fi .: �, it lL • rj." Cable, Pipe & Leak Detection, Inc. agrees to perform the service indicated in a proper and professional manner, using equipment standard for this type of service, to the best of our ability. Customer understands that Cable, Pipe & teak Detection, Inc. makes no warranties end/or guarantees Expressed or implied, and that no consequential damages will be recoverable due to the work performed hereunder. in the event we are locating urnderaround utilities, customer fully acknowledges that some utilities are simply "Untraceable" and we shall not be liable for any losses or damages due to undetected utilities_ Customer actcnowledgcs rates are minimum basic and do not include prevailing wagejcertilled payroll requirement cads, and that they have read and understand this ngreement and have executed the agreement voluntarily CPL Safi Diego 114014. Socon 1. i it ac 201. t::1 Goie . C J20 t 1 Toti Froc 80-4 aQ- kf` i I Tel ti l9-87; -153#1 I Vox 64 •17 15 I www,cpidelcclion,com I