HomeMy WebLinkAbout2023 CON E&H Contracting Inc. - MLK Community Center CIP No. 22-06 - Change Order No. 4ci*LIFOaNIA .
NATIONAL CITY
; ! —
1'tI3a I•UILATL•I'
MLK Community Center
CIF No: 22-06
Contractor: E&H General Contracting, Inc.
Reason1Purpose for this Change Order:
•
a
!
U
'j
E ORDER NO. 4
May 4, 2023
CTY NP10'
Ct1(
;)
The City has directed the contractor to remove the exisiting outlet below the new sink and re cate above
counter with 4 gang outlet
The City of National City and Contractor agree to the following ang to the original Contract
The City has directed the contractor to remove the exisiting outlet below the new sink service and replace the
exisiting 2 gang outlet above the counter with a 4 gang. All work has been authorized at the agreed lump sum
price listed below.
Original Contract Amount
Net change by previously authorized Change Orders
Subtotal ....... , ....
Amount of this change order....
New contract amount..
Working days added: 0
Submitted by
ect Manager
Approved
I..
599,810.00
11,894.81
6 11,704.81
393.67
$ 612,098.48
Working days subtracted: 0 Percent change in Contract to date 2.05%
5/04/23
Date
tinl
(014-5z
City Project Manager
Z:31 la3
Date
City Eng Date City Manager, tequircd for Change on iers 424,999 Date
By signing is Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly
negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and
labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the
price is fair and complete and represents all costa associated with the work, including but not limited to all equipment, materials, labor,
supervision, overhead, fees, bonds, Insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions
of th.e original contract documents are incorporated herein. (2 originals: I for City Clerks 'I for Contractor)
by E&H General Contracting Inc.:
/?,0
Date
Note to Contractor: If you don t agree with this Change Order you may be directed to proceed with this work under the terms of the
contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect
your claim.
Originals: City Clerk, Contractor
1243 National City Boulevard, National City, CA 91950
cc: Engineering project tile, Project Manager
Telephone (619) 336-4380
E&H General Contracthig Inc.
6402 N. Magnolia Ave. Suite B
Santee, CA 92071
TITLE:
Phone: (619) 486-6553
Fax: x: (19) 4 6 6897
New Handsink At Serving Area Item #25
PROJECT: Kitchen Remodel and Flooring Replacement
TO: Attn: Sean Gill
I -- --5 LL- .
Poo Box 6211
Norco, CA. 92860
REQUEST FOR
INFORMATION
No. 10
DATE. 03/2312023
JOB:22-105
CONT T!PO: CIP NO 22-06
STARTED: 03/13/2023
COMPLETED:
REQUIRED:
Moto: cose3 cannot be
REQUEST: Scheduling Impact: MonetaryImpact: O! onu etug s limo.
Regarding the added hand sink at the service area, we are unable to install the hot water and cold water
� � �- the wall cavit In
per sheet P3.0. The existing wall is 2 ,CIS and the added vent for this sink will occupy
order to install hot and cold water, all water will need to be rerouted above ceiling to work around the new
vent line.
In addition there is an existing outlet at the same location where the new water angle stops will need to
be installed,
Please provide direction if it is acceptable to reroute waterline for this sink and if the existing outlet is to
be removed/relocated.
Please see attached information provided by plumber for further clarification.
ANSWER
After a site appear it does a ear the hot and cold waters can be routed from connection points above and
ran between the stud locations. The existing outlet at the new sink location can be terminated at the
feeding outlet to
the left. in order to maintain the necessary plugs required for this area, the existing two 2-
o be exchanged to a 4-gang plug. Please discuss any additional questions with your 1C
CS
2-
gang plug should +�
Inspector.
Sean Gill
3-28-23
Requested By: EMI General Contracting Inc. Date:
Signed:
Jake Espinoza
Page 1 of 1
E&H General Contracting Inc.
8402 N. Magnolia Ave. Suite B
Santee, CA 9 071
TITLE: Relocate Outlet per RFI #10
Phone: (619) 486-6553
Fax: 519) 486-6897
PROJECT: Kitchen Remodel and Flooring Replacement
TO: Attn: Sean Gill
T—LAC:
PG Box 62i 1
Norco, CA. 92860
DESCRIPTION
PROPOSED
CHANGE ORDER
DATE: 05/01/2023
JOB: 2 -105
CONTRACT/PO: CIP NO 2 -06
SUBMITTED:
COMPLETED:
REQUIRED:
Per RFI #10
Remove the existing ng outlet below new Service Sink in Service area and change out existing 2 gang outlet
above counter to a 4 gange outlet.
Num Item
I
2
3
4
APPROVAL
By:
Date:
Description
Maternal
Material Mark up 15%
Labor
Labor !'ark up 20%
Ref
Qty Unit Unit Price Amount
1.000 62.12 62.12
1,000 9.32 9.32
1.000 249.81 249.31
1,0OO 49.96 49,96
Item Total:
E&H Overhead (5%)
Bond Cost (1%)
Date:
$371.21
$18.56
3. 0
Total: $393.67
BftTURI
CHANGE ORDER PR POSAL
Job Name and Address:
MU< Kitchen Remodel and Flooring Replacement
140 E. 12th Street
National City, CA 91950
Description of Change:
Demo existing electrical outlet and change adjacent duplex
receptacle to a double duplex receptacle.
MATERIAL
1. Material
2. Sa les-Tax
3. Total Material Charge
LABOR
4. Electrician
5. Foreman
General Foreman
7. Project Manager
8. Subtotal (Lines 4, 5, 6 & 7
G.
9. Overtime Premium
10. Total Labot Cost
average rate x 1.5
Ln+ I
Date:
Saturn Job #:
Change Order #:
Project Manager:
3 Hrs. @ $ 83.2 7
Hrs.
Hrs.
Hrs.
Hrs.
EXPENSES
11. Labor Burden
12. Cartage & Handling
13. Expendables
14. Permits
15. Small Tools
1C, Large Tools & Equipment Rentals
1.7. Total Expenses
SUBCONTRACTS AND ENGINEERING
18. Engineering, Drafting ing & Design
19. Subcontracts
20. Total Subcontracts/Engineering
OVERHEAD & PROFIT
21.
22.
23.
24,
25.
2,
Subtotal of Lines 3, 10 17
Overhead
Subtotal of Lines 21 & 22
62% of Line
3% of Line 1
4 of Line
4 of Line
BOND & MISCELLANEOUS COSTS
28. Subtotal from Lines 3, 10, 17, 20, and 27)
29. Bond Rate
30.
31.
32. Total Bond & Miscellaneous (Lines 29, 30 & 31)
10 of Line 21
1.50% of Line 28
4 2 /2023
776
1
Bob Dudek
$57,5
4_4 7_
isr7„,
62.12
249.81
$ 249.8i
$
249.81
zUri.9 (e/
oo
$
$
S
•
Total Cost Proposed Change (Sum of Lines 3, 10, 17, 20, 27 and 32)
43
From: Wesley Scott <wscott hpsrrrechanical.com>
Sent: Wednesday, March 22, 2023 1 :48 PM
To: Jake Espinoza; Eddy Espinoza
Cc msamoles hpsmechanicai.com; Joseph Ahrens
Subject: H PPS #128BO Hand Sink & Existing Wall Size Conflict/RH draft
HPS performed field verification of existing DC V and DHW overhead as well as In -wall plumbing.
Observations and issues found include;
- inadequate wall space for new DWV and DcW/DHW installations at sink location.
as built drawings reflect different pipe routing than actual field Installation.
- existing electrical outlet in conflict with new sink rough in installation.
Please provide resolution to issues noted. Thank you.
•
�i• 4 �T'Y 2Fi a
1r
)3/L" CV'r UP
k
•
r
I
•
f)
(1)3/4" cW
0 U
CO;--1/4r1 ;
. 4
i
.4 1
I 1r
'� r
.• : rf
era f L N r ,I
{
r t a a
t4
�11..4
` r 4 r,.,•F
* 1 "t'. t- . ,
(003/ r' ;1N A t)
:�-(F)-1/" `#W
t
z