Loading...
HomeMy WebLinkAbout2023 CON E&H Contracting Inc. - MLK Community Center CIP No. 22-06 - Change Order No. 4ci*LIFOaNIA . NATIONAL CITY ; ! — 1'tI3a I•UILATL•I' MLK Community Center CIF No: 22-06 Contractor: E&H General Contracting, Inc. Reason1Purpose for this Change Order: • a ! U 'j E ORDER NO. 4 May 4, 2023 CTY NP10' Ct1( ;) The City has directed the contractor to remove the exisiting outlet below the new sink and re cate above counter with 4 gang outlet The City of National City and Contractor agree to the following ang to the original Contract The City has directed the contractor to remove the exisiting outlet below the new sink service and replace the exisiting 2 gang outlet above the counter with a 4 gang. All work has been authorized at the agreed lump sum price listed below. Original Contract Amount Net change by previously authorized Change Orders Subtotal ....... , .... Amount of this change order.... New contract amount.. Working days added: 0 Submitted by ect Manager Approved I.. 599,810.00 11,894.81 6 11,704.81 393.67 $ 612,098.48 Working days subtracted: 0 Percent change in Contract to date 2.05% 5/04/23 Date tinl (014-5z City Project Manager Z:31 la3 Date City Eng Date City Manager, tequircd for Change on iers 424,999 Date By signing is Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costa associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, Insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of th.e original contract documents are incorporated herein. (2 originals: I for City Clerks 'I for Contractor) by E&H General Contracting Inc.: /?,0 Date Note to Contractor: If you don t agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor 1243 National City Boulevard, National City, CA 91950 cc: Engineering project tile, Project Manager Telephone (619) 336-4380 E&H General Contracthig Inc. 6402 N. Magnolia Ave. Suite B Santee, CA 92071 TITLE: Phone: (619) 486-6553 Fax: x: (19) 4 6 6897 New Handsink At Serving Area Item #25 PROJECT: Kitchen Remodel and Flooring Replacement TO: Attn: Sean Gill I -- --5 LL- . Poo Box 6211 Norco, CA. 92860 REQUEST FOR INFORMATION No. 10 DATE. 03/2312023 JOB:22-105 CONT T!PO: CIP NO 22-06 STARTED: 03/13/2023 COMPLETED: REQUIRED: Moto: cose3 cannot be REQUEST: Scheduling Impact: MonetaryImpact: O! onu etug s limo. Regarding the added hand sink at the service area, we are unable to install the hot water and cold water � � �- the wall cavit In per sheet P3.0. The existing wall is 2 ,CIS and the added vent for this sink will occupy order to install hot and cold water, all water will need to be rerouted above ceiling to work around the new vent line. In addition there is an existing outlet at the same location where the new water angle stops will need to be installed, Please provide direction if it is acceptable to reroute waterline for this sink and if the existing outlet is to be removed/relocated. Please see attached information provided by plumber for further clarification. ANSWER After a site appear it does a ear the hot and cold waters can be routed from connection points above and ran between the stud locations. The existing outlet at the new sink location can be terminated at the feeding outlet to the left. in order to maintain the necessary plugs required for this area, the existing two 2- o be exchanged to a 4-gang plug. Please discuss any additional questions with your 1C CS 2- gang plug should +� Inspector. Sean Gill 3-28-23 Requested By: EMI General Contracting Inc. Date: Signed: Jake Espinoza Page 1 of 1 E&H General Contracting Inc. 8402 N. Magnolia Ave. Suite B Santee, CA 9 071 TITLE: Relocate Outlet per RFI #10 Phone: (619) 486-6553 Fax: 519) 486-6897 PROJECT: Kitchen Remodel and Flooring Replacement TO: Attn: Sean Gill T—LAC: PG Box 62i 1 Norco, CA. 92860 DESCRIPTION PROPOSED CHANGE ORDER DATE: 05/01/2023 JOB: 2 -105 CONTRACT/PO: CIP NO 2 -06 SUBMITTED: COMPLETED: REQUIRED: Per RFI #10 Remove the existing ng outlet below new Service Sink in Service area and change out existing 2 gang outlet above counter to a 4 gange outlet. Num Item I 2 3 4 APPROVAL By: Date: Description Maternal Material Mark up 15% Labor Labor !'ark up 20% Ref Qty Unit Unit Price Amount 1.000 62.12 62.12 1,000 9.32 9.32 1.000 249.81 249.31 1,0OO 49.96 49,96 Item Total: E&H Overhead (5%) Bond Cost (1%) Date: $371.21 $18.56 3. 0 Total: $393.67 BftTURI CHANGE ORDER PR POSAL Job Name and Address: MU< Kitchen Remodel and Flooring Replacement 140 E. 12th Street National City, CA 91950 Description of Change: Demo existing electrical outlet and change adjacent duplex receptacle to a double duplex receptacle. MATERIAL 1. Material 2. Sa les-Tax 3. Total Material Charge LABOR 4. Electrician 5. Foreman General Foreman 7. Project Manager 8. Subtotal (Lines 4, 5, 6 & 7 G. 9. Overtime Premium 10. Total Labot Cost average rate x 1.5 Ln+ I Date: Saturn Job #: Change Order #: Project Manager: 3 Hrs. @ $ 83.2 7 Hrs. Hrs. Hrs. Hrs. EXPENSES 11. Labor Burden 12. Cartage & Handling 13. Expendables 14. Permits 15. Small Tools 1C, Large Tools & Equipment Rentals 1.7. Total Expenses SUBCONTRACTS AND ENGINEERING 18. Engineering, Drafting ing & Design 19. Subcontracts 20. Total Subcontracts/Engineering OVERHEAD & PROFIT 21. 22. 23. 24, 25. 2, Subtotal of Lines 3, 10 17 Overhead Subtotal of Lines 21 & 22 62% of Line 3% of Line 1 4 of Line 4 of Line BOND & MISCELLANEOUS COSTS 28. Subtotal from Lines 3, 10, 17, 20, and 27) 29. Bond Rate 30. 31. 32. Total Bond & Miscellaneous (Lines 29, 30 & 31) 10 of Line 21 1.50% of Line 28 4 2 /2023 776 1 Bob Dudek $57,5 4_4 7_ isr7„, 62.12 249.81 $ 249.8i $ 249.81 zUri.9 (e/ oo $ $ S • Total Cost Proposed Change (Sum of Lines 3, 10, 17, 20, 27 and 32) 43 From: Wesley Scott <wscott hpsrrrechanical.com> Sent: Wednesday, March 22, 2023 1 :48 PM To: Jake Espinoza; Eddy Espinoza Cc msamoles hpsmechanicai.com; Joseph Ahrens Subject: H PPS #128BO Hand Sink & Existing Wall Size Conflict/RH draft HPS performed field verification of existing DC V and DHW overhead as well as In -wall plumbing. Observations and issues found include; - inadequate wall space for new DWV and DcW/DHW installations at sink location. as built drawings reflect different pipe routing than actual field Installation. - existing electrical outlet in conflict with new sink rough in installation. Please provide resolution to issues noted. Thank you. • �i• 4 �T'Y 2Fi a 1r )3/L" CV'r UP k • r I • f) (1)3/4" cW 0 U CO;--1/4r1 ; . 4 i .4 1 I 1r '� r .• : rf era f L N r ,I { r t a a t4 �11..4 ` r 4 r,.,•F * 1 "t'. t- . , (003/ r' ;1N A t) :�-(F)-1/" `#W t z