HomeMy WebLinkAbout2023 CON Tri-Group Construction & Development - Roosevelt Smart Growth - Change Order No. 16E,
Roosevelt mart Growth
CIP o: 19-19
Contractor: T'ri-Group Construction & Development, Inc.
Reason/Purpose for this Change Order:
The City has directed the contractor to install yellow striping around the boulders.
1e?3
r 1 1 , .
•_s 1� 11 I~ � ti
`'' H •ORDERING. 1
TY 0 F N AT ' r k 2
The city of National City and Contractor agree to the following change to the original Contract:
The City has directed the contractor to install yellow striping around the boulders to help delineate the
pedestrian path of travel. All work was performed at the total lump sum price listed below and per the
pattached quote.
Original Contract Amount....•..•....■#•■■.•....■...••F•i•.:l
Net change by previously authorized Change Orders...
Subtotal.
t 4.4
Amount of this change ordersif.r...iFl.i.sE. .iYi\. i...wf. iM44414fINIPIifG/ram...
New contract amount.
Working days added: 1
iSubmitted by:
Pr ji4A..'er
---
Approved by
Working days subtracted: 0
4-24-23
r .. •
i .. i ■ i . r • i .....
ffit.■Ui! i.i iai
$ 2,04 , 1.00
124,13.41
Percent change in Contract to date 6.21%
,173, .41
3,110.00
2,176,733.41
Date ager r...lbate
City, n i Date 'Cit lAnager, required for change Orders >524.999 Date
By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly
negotiated Its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and
labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the
price is fair and complete and represents all costs associated with the work, Including but not limited to all equipment, materials, labor,
supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions
of the original contract documents are incorporated herein. (2 originals: 1 for City Clerk, 1 for Contractor)
Accepted and agreed to by (Contractor's name):
Name:
44-
......i••.yl...i........ _. rNcra.sr r.. ►....-....... x
feo�3
Date ---.._
Note to Contractor: if you do not agree with this Change Order you maybe directed to proceed with this workunder the terms of the
contract and you may proceed under protest. You must comply with the contract requirements of submitting awritten protest to protect
y►o u r claim.
Originals: City Clerk, Contractor
1243 National City Boulevard, National City, CA 91950
cc: Engineering project file, Project Manager
Telephone (619) 336-4380
March 09, 2023
Mr. Sean Gill
City of National City
1243 National City Blvd_
National City CA 11950
TRI•BGROUP
Construction and Development, Inc.
Vic. Na. 792159
Project: ROOSEVELT SMART GROEWTH CORRIDOR
Subject: Bulb -out Striping Cost Proposal
Tn-Group Construction and Development, Inc. (TriGrop) proposes to paint yellow edge
stripes along the Decorative Boulders on Roosevelt Ave at Bulb -outs of approximately 975
LF of striping, for a lump sum of:
$3,110.00
Cost Break Down:
Subcontractor's work: $2,800.00
(see attached quote from Payco Spe.tialt}`)
Outside Services Markup: $28000
Bond: $30.00
1%
9580 Black Mountain Rd1 Suite L a San Diego, CA 921260 Office (858) 8 -0058 0 Fax (858) 8 - i 4
TRIGRCu P
Construction and Development, inc.
Lie. Na. 792159
Conditions:
• T&M / Force Account cannot be used.
. All Sections of the Contract apply,
. Removal of any kind is not included.
• This cost proposal is n addition cost and does not replace any
Cost Proposal expires on / 1 023.
Please contact our office at 858-689-0058 for any esti
Sincerely
Hani Assi
9580 Black Mountain Rcli Suite L * San Diego, CA 92126 • Office () --00 8 Fax (858) -1594
P ayco Specialties, Inc. AwoMAN OWNED susIxEss
Highway -Airport - Parking Lot - Signage - Striping -Marking & Removals
SSE 418502 -DBE I WEE #102-LABORERS LOCAL UNION #'1184 - LICENSE 11248637 C-32 CA OR REGtMtA9'(Q{V #1000003515
21006 Charge Order
Project Description: PSI 21008 BE LT B LB T BOULDER BORDERS
Bid Date: 211S120
▪ ANY ba+dging, security checks, railroad classes, project required salety training will be billed at T2i to contractor
• A signed Purchase Order or Subcontract le requirad molar to any +ark associated with this Propo$01.
Tiffs Proposal Is based an 8 hour shift per workday,. any ar ethrne (preiniun Worm) wll7 be paled by tha Prirtre Guntrctcr.
• This Proposal is valid for 30 days after the bid date.
* if accepted, this Proposal will be incorporated as an Exhibit to the Contract or Purchase Order.
▪ A minimum of 20 wolf# days schedule notice in writiing is required Al TE F ALL PAPERWORK is COMPLETED.
• Bond cost to be paid by Prime Contractor.
Cane lation charge for any shy of work called off within 12 hours of showup time is $, D
• Industry standard insurance available up to $5,000,000.00 LIMIT Railroad Inaurance EXCLUDED
• A Mobilization .l Move -In is any work accomplished through consecutive shifts. Unavailable worll and all extra —work will be
charged additional mobilizations upon completion,
• Payments are net 30 clays, Retention Is to be paid 30 day from Payco's completion of work.
" EXCLUDES ALL MASTARM S! NS,SI N STRUCTURES, AND ELECTRICAL SIGNS
• in the event of significant delays or price Increase of material occurring during the performance of the contract through no fault of
Payco Spada/ties Spada/tiesInc, the contract sum, time of peffonnance, and contract requirements shall be equitably ac6usted by change order
In accordance with the procedures of the contract documents. A chan#re in price of an Hem of material shall be considered signint
wlrerr the price of an ►tam Increases by ten percent between the date of this contract end the date of Installation
EXCLUSIONS;
ENGINEERING - TRAFFIC CONTROL PLANS PERMITS - PERMITS- BONDS • Llie • HAZARDOUS WASTE i i VA►L— TRUNCATED DOMES - CUR PAINT
REMOVAL - BOLLARDS • CONCRETE CURE Re w:Amt. - FLA$Hi # BEACONS CUSTOMSTENCILING- FLAGGEf8 . SEAL COAT- FOG SEAL - SLURRY SEAL -
SURFAE REPAIR , PREFORMED THERMOPLASTIC - PCMS PILOT CARS • FLAG MEN - PROJgc'T IDENTIFICATION SIGNS - REMOVAL AND DISPOSAL. OF
TREATED WOOD FROM SIGN POST REMOVAL LEAD COMPLIANCE PLAN • S P- NO PARKING BARRICADES - SIGNS- THERMOPLASTIC
INCLUSIONS:
Striping: iCoat Point
U of working Days to Complete our Wort,
BID AMOUNT:
of Move - is .hotted: 1 . Adel 1's: 00
--...2450sta ESTIMATOR:
120 North Second Avenue, Chula Vista, CA 91 1 D-112 7
Phone (19) 422-9204 r Fax (619) 427-1620
JEREPEY GRIFFIN