HomeMy WebLinkAbout2023 CON Tri-Group Construction & Development - Roosevelt Smart Growth - Change Order No. 16E, Roosevelt mart Growth CIP o: 19-19 Contractor: T'ri-Group Construction & Development, Inc. Reason/Purpose for this Change Order: The City has directed the contractor to install yellow striping around the boulders. 1e?3 r 1 1 , . •_s 1� 11 I~ � ti `'' H •ORDERING. 1 TY 0 F N AT ' r k 2 The city of National City and Contractor agree to the following change to the original Contract: The City has directed the contractor to install yellow striping around the boulders to help delineate the pedestrian path of travel. All work was performed at the total lump sum price listed below and per the pattached quote. Original Contract Amount....•..•....■#•■■.•....■...••F•i•.:l Net change by previously authorized Change Orders... Subtotal. t 4.4 Amount of this change ordersif.r...iFl.i.sE. .iYi\. i...wf. iM44414fINIPIifG/ram... New contract amount. Working days added: 1 iSubmitted by: Pr ji4A..'er --- Approved by Working days subtracted: 0 4-24-23 r .. • i .. i ■ i . r • i ..... ffit.■Ui! i.i iai $ 2,04 , 1.00 124,13.41 Percent change in Contract to date 6.21% ,173, .41 3,110.00 2,176,733.41 Date ager r...lbate City, n i Date 'Cit lAnager, required for change Orders >524.999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated Its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, Including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. (2 originals: 1 for City Clerk, 1 for Contractor) Accepted and agreed to by (Contractor's name): Name: 44- ......i••.yl...i........ _. rNcra.sr r.. ►....-....... x feo�3 Date ---.._ Note to Contractor: if you do not agree with this Change Order you maybe directed to proceed with this workunder the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting awritten protest to protect y►o u r claim. Originals: City Clerk, Contractor 1243 National City Boulevard, National City, CA 91950 cc: Engineering project file, Project Manager Telephone (619) 336-4380 March 09, 2023 Mr. Sean Gill City of National City 1243 National City Blvd_ National City CA 11950 TRI•BGROUP Construction and Development, Inc. Vic. Na. 792159 Project: ROOSEVELT SMART GROEWTH CORRIDOR Subject: Bulb -out Striping Cost Proposal Tn-Group Construction and Development, Inc. (TriGrop) proposes to paint yellow edge stripes along the Decorative Boulders on Roosevelt Ave at Bulb -outs of approximately 975 LF of striping, for a lump sum of: $3,110.00 Cost Break Down: Subcontractor's work: $2,800.00 (see attached quote from Payco Spe.tialt}`) Outside Services Markup: $28000 Bond: $30.00 1% 9580 Black Mountain Rd1 Suite L a San Diego, CA 921260 Office (858) 8 -0058 0 Fax (858) 8 - i 4 TRIGRCu P Construction and Development, inc. Lie. Na. 792159 Conditions: • T&M / Force Account cannot be used. . All Sections of the Contract apply, . Removal of any kind is not included. • This cost proposal is n addition cost and does not replace any Cost Proposal expires on / 1 023. Please contact our office at 858-689-0058 for any esti Sincerely Hani Assi 9580 Black Mountain Rcli Suite L * San Diego, CA 92126 • Office () --00 8 Fax (858) -1594 P ayco Specialties, Inc. AwoMAN OWNED susIxEss Highway -Airport - Parking Lot - Signage - Striping -Marking & Removals SSE 418502 -DBE I WEE #102-LABORERS LOCAL UNION #'1184 - LICENSE 11248637 C-32 CA OR REGtMtA9'(Q{V #1000003515 21006 Charge Order Project Description: PSI 21008 BE LT B LB T BOULDER BORDERS Bid Date: 211S120 ▪ ANY ba+dging, security checks, railroad classes, project required salety training will be billed at T2i to contractor • A signed Purchase Order or Subcontract le requirad molar to any +ark associated with this Propo$01. Tiffs Proposal Is based an 8 hour shift per workday,. any ar ethrne (preiniun Worm) wll7 be paled by tha Prirtre Guntrctcr. • This Proposal is valid for 30 days after the bid date. * if accepted, this Proposal will be incorporated as an Exhibit to the Contract or Purchase Order. ▪ A minimum of 20 wolf# days schedule notice in writiing is required Al TE F ALL PAPERWORK is COMPLETED. • Bond cost to be paid by Prime Contractor. Cane lation charge for any shy of work called off within 12 hours of showup time is $, D • Industry standard insurance available up to $5,000,000.00 LIMIT Railroad Inaurance EXCLUDED • A Mobilization .l Move -In is any work accomplished through consecutive shifts. Unavailable worll and all extra —work will be charged additional mobilizations upon completion, • Payments are net 30 clays, Retention Is to be paid 30 day from Payco's completion of work. " EXCLUDES ALL MASTARM S! NS,SI N STRUCTURES, AND ELECTRICAL SIGNS • in the event of significant delays or price Increase of material occurring during the performance of the contract through no fault of Payco Spada/ties Spada/tiesInc, the contract sum, time of peffonnance, and contract requirements shall be equitably ac6usted by change order In accordance with the procedures of the contract documents. A chan#re in price of an Hem of material shall be considered signint wlrerr the price of an ►tam Increases by ten percent between the date of this contract end the date of Installation EXCLUSIONS; ENGINEERING - TRAFFIC CONTROL PLANS PERMITS - PERMITS- BONDS • Llie • HAZARDOUS WASTE i i VA►L— TRUNCATED DOMES - CUR PAINT REMOVAL - BOLLARDS • CONCRETE CURE Re w:Amt. - FLA$Hi # BEACONS CUSTOMSTENCILING- FLAGGEf8 . SEAL COAT- FOG SEAL - SLURRY SEAL - SURFAE REPAIR , PREFORMED THERMOPLASTIC - PCMS PILOT CARS • FLAG MEN - PROJgc'T IDENTIFICATION SIGNS - REMOVAL AND DISPOSAL. OF TREATED WOOD FROM SIGN POST REMOVAL LEAD COMPLIANCE PLAN • S P- NO PARKING BARRICADES - SIGNS- THERMOPLASTIC INCLUSIONS: Striping: iCoat Point U of working Days to Complete our Wort, BID AMOUNT: of Move - is .hotted: 1 . Adel 1's: 00 --...2450sta ESTIMATOR: 120 North Second Avenue, Chula Vista, CA 91 1 D-112 7 Phone (19) 422-9204 r Fax (619) 427-1620 JEREPEY GRIFFIN