HomeMy WebLinkAbout2023 CON Project Professionals Corporation - Street Resurfacing CIP No. 22-19 - Change Order No. 4PP - , - F ILLJ- JI A" tjN CHANGE ORDER MEMORANDUM February 28, 2023 To: Roberto Yano Director of Engineering & Public works/City Engineer Engineering and Public works Department City of National City From: Josh Johnson Project Manager Project Professionals Corp Project: National City Street Resurfacing FY 21/22 CIP No.: 22-19 Subject: Change Order No. Change Order No. 4 provides for: Demolition and removal of an additional 3" of the existing subgrade for an approximate 800 square feet to install the new bus pad on the Northern side of Plaza Blvd. Payment for this change order will be as agreed upon at a lump sum price. Supporting Information: Per the new detail for the bus pad, the existing surface of the bus pad will match the adjacent concrete utility trench existing surface. The new bus pad will be 3" lower than the original bus pad elevation. This change order covers for the 3" additional structural section that will need to be removed to install the new bus pad as the Contractor has not proceeded with the original 9" of contract demolition. Time Adjustment: Zero (0) additional working days are to be added to the Contract as the additional work did not affect the critical path of the approved schedule. Cost d justment: The additional cost for this change in the scope of work has been agreed upon at a lump surn price of 4,266.49. The pay method and amount have been reviewed by the Project Manager and are considered fair and reasonable. The supporting documentation is on file with the project records. oject d .`! alter osh Johnson, PPC 2/28/2023 Date - CALIFORNIA NNUONAL CiTy eF 0 0 National City Street Resurfacing FY 21/22 CHANGE ORDER NO. 4 CIP NO. 22-19 February 23, 2023 Contractor: Eagle Paving Company, Inc. 1391 Danielson Street Poway, CA 92064 This Change Order modifies Contractor's and the City's obligations and rights under the ab vennentiened contract This change order is not effective until approved by the City. Time adjustment: Zero (0) additional working days are to be added to the Contract as the additional work did not affect the critical path of the approved schedule. Cost of Change Order: The City and the Contractor agree that the Contractor shall proceed with the additional 3" of demolition and removal of existing subgrade beneath the 800 SF bus pad area along the northerly edge of Plaza Boulevard, The total amount for all labor, material, equipment and all other associated work is 4,266,49. Recommended by Project Manager: 1, Date: / 8/20 3 By signing this Change Order the C' tractoriconfirms that he/sh.e is completely familiar with and has fairly negotiated its price, terms and conditions. I this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. The signer for the Contractor confirms that heJshe is authorized to bind the Contractor to this Change Order. Agreed and Accepted by Contractor: (Print Name and, Title) Stephen HoustG Approved by City Engineer: Approved by City Manager: (Requiredfor change orders $25,000 and above) by $Mohan Hini ton i7 ate: 023fl.2 28 1539:44 -OR'11:' Date: 02 Z8 2023 Date: Date: CALIFORNIA NATIONAL CITY CZNCORPQiLA7'V) NATIONAL CITY STREET RESURFACING FY21-22 OP NO. 22-19 SUBCONTRACTOR 3) 7} DATE: February 17, 2023 CHANGE ORDER NO. 4 WORK PERFORMED BY: YBS Construction Engineering DESCRIPTION OF WORK: Additional clerno for the bus pad (north side) - 3" grave removal for 640 SF (remaining work is per contract) ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT Laborer (1) Laborer (1) Laborer (Traffic Control) ( ) Laborer( Traffic Control) (1) Operator (G3) Operator (G3) MATERIALS 1) Dump fees Trucking (2 trucks) EQUIPMENT 1) 2) 5) Tool Truck Vibratory Plate Jumping Jack Low Bed C Mini Excavator Skid Steer-+- Breaker U nit HR HR HR HR HR HR I-IR U nit EA HR U nit HR HR HR HR HR HR Qty 3.00 3.00 3.00 3.00 3.00 3.00 3.00 Wage 62.03 62.03 62.03 62.03 62.03 80.76 $ 80.76 Sub -Total Subcontractor: Labor Surcharge (10%) Labor Markup (20%): TOTAL SU BCC NTRACTOR: 1.00 6.00 Total $ 186.09 186.09 186.09 186.09 $ 186.09 242.28 242.28 1,415.01 141.50 311.30 Rate 645.00 $ 145,00 Sub -Total Materials: Materials Markup (15%): Qty 2.00 2.00 2.00 2.00 2.00 2.00 Rate Total 645.00 870.00 1,515.00 227.25 TOTAL MATERIALS: 1.50 12.30 12.00 31.99 56.33 53.25 Sub -Total Equipment: Equipment Markup (15 ) Total $ 63.00 24.00 1,867.81 1,742.25 24. 00 63.98 112.66 106.50 394.14 59,12 TOTAL EQUIPMENT: Subtotal: Prime Markup (5): 453.26 GRAND TOTAL: 4,063.32 $ 4,266.49