HomeMy WebLinkAbout2023 CON Project Professionals Corporation - Civic Center Basemet Power Upgrade - CIP No. 20-03 - Change Order No. 5CHANGE ORDER MEMORANDUM March 21.202 Roberto Vano Director of Engineering Public Works/City Engineer Engineering and Public Works Department City of National City From: Josh Johnson Project Manager Project Professionals Corp Project: Civic Center Basement Power Upgrade CtP No.: 20-03 Subject: Change Order Noe 5 Change Order No.5_rvids for: Procure and install a temporary generator to provide temporary power to panel L for the duration of the main service switchboard outage. a ortr } Information: : Per Plan Sheet E-003 the Contractor is to temporarily power panel L from a 200A circuit breaker in switchboard MSB for the du ration of the replacement of the switchboard EC and ATS. For safety reasons switchboard MSB will need to be de -energized for approximately 8 hours while the Contractor removes the existing ATS feeder wire and installs new wire. Panel L will not have power for this duration. In order to keep Panel L energized the Contractor will need to utilize a temporary generator as the UPS powering Panel L can only hold the critical load for a short period of time. Time Adjustment: Zero (0) additional working days are to be added to the Contract as the additional work did not affect the critical path of the approved schedule. Cast Adjustment: Cost was determined by force account analysis for a total of 4,923.49, ash Johnson, PPC 3/22/23 Pr ojectrnaer Date -fifrtr *,. CALIFORNIA, NkTI I)NAL C1?p „.al•Em.,. a .6' itild (!3 .$) Civic Center Basement Power Upgrade CHANGE ORDER NO. 5 CIP NO. 20-03 March 21, 2023 Contractor: National Electric Works 4440 Rainer Ave, Suite 101 San Diego, CA 92120 This Change Order modifies Contractor's and the City's obligations and rights under the abovementioned contract. This change order is not effective until approved by the City. Time adjustment: Zero (0) additional working days are to be added to the Contract as the additional work did not affect the critical path of the approved schedule. Cost of Change Order: The City and the Contractor agree that the Contractor shall procure and install a temporary generator to provide temporary power to panel L for the duration of the main service switchboard outage. The total amount for all labor, material, equipment and all other associated work is $4,923.49 , Recommended by Project Manager,,V , Johnson, PPC Date: 3/22/23 By signing this Change Order the Contractor confirms that he,f she is completely familiar with and has fairly negotiated Its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. The signer for the Contractor confirms that he/she is authorized to bind the Contractor to this Change Order. Agreed and Accepted by Contractor: ' (Print Name and Title) ifAt.44. 0 Approved by City Engineer:/� Approved by City Manager: (Required for change orders $25,000 and above) Date: S/2)) Z3 Date: Date: