Loading...
HomeMy WebLinkAbout2023 CON E&H General Contracting Inc. - MLK Community Center - CIP No. 22-06 - Change Order No. 2... CALIFOPNIA - MLK ommunity Center CIP No: -06 Contractor: E&H General Contracting, Inc. Reason/Purpose for this Change Order. NATIONAL airy Ar dift1'[o*t Ae tr rt Ei 11173 tIn 29 1'w 1f7 a CITY OF NI crrY The City has directed the contractor to remove the existing VCT from the meeting/dining room. CHANGE ORDER NO. March 14, 2023 The City of National City and Contractor agree to the following change to the original Contract: The City has directed the contractor to remove the existing VCT from the meeting/dining room due to delamination and excessive cracking. The removal will help evaluate and prepare the existing concrete surface for the new LVT flooring and provide a warranty for the LVT product. All work has been authorized at the agreed lump sum price listed below. Original Contract Amount Net change by previously authorized Change Orders Subtotalsw.t Amount of this change order .... .. ..., New contract amount! Working days added: Submitted by. ect Manager 599,810.00 3,000.00 602,810.00 812 2.00 $ 611, 042. 04 Working days subtracted: 0 Percent change in Contract to date 1. 7% 3-28-23 Date City Project Manager Date City Engin,: Date City Manager, requited for Change Orders 4.99 i Date By signing thj Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated it rice terms and conditions. If this Change Order is approved, Contractor will provide ail of the equipment, materials and price, labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is lair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. AU of the terms and conditions of the original contract documents are incorporated herein. (2 originals: 1 for City Clerk, I for Contractor) . ccepte reed . : H General Contracting Inc.: 3 �2 de; foz_,.2 Date Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this wort under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380 E&H General Contracting inc. PROPOSED CHANGE ORDER 8402 N. Magnolia Suite B Phone: 619-486-6553 No. Santee, CA.92071 Fax: 61--486-68 7 TITLE: VCT Removal in Meeting/Dining Room DATE: 03/07/2023 PROJECT: Kitchen Remodel and Flooring Replacement TO: JOB: 22-105 Atn: Sean Gill I C} LLC , PO Box 6211 SUBMITTED: Norco, CA.92 ] COMPLETED: CONTRACT/PO: CEP NO 22-06 REQUIRED: DESCRIPTION Per recommendation from flooring contractor and flooring manufacturer the excisting VCT will need to be removed to provide a warranty for the LVT product. Please see attached costs for removal of existing VCT in meeting/dining room. Num item Description Ref Qty Unit Unit Price Amount 1 APPROVAL By: Date: Rosenbach VCT Removal 1.000 Eddy Espinoza 7,840.00 7,840.00 item Total: $7,840,00 E&H Overhead (5%) $392.00 By: Date: Total: $8,232.00