Loading...
HomeMy WebLinkAbout2023 CON E&H General Contracting Inc. CIP No. 22-06 - Change Order No. 8MLK ommunity Center C1P No: 22-06 Contractor E&H General Contracting, Inc. CHANGE O RD R . 8 June lei Reason/Purpose for this Change Order: The City has directed the contractor to replace the exisitiing damaged floor drain in the kitchen. i The City of National City and Contractor agree to the following change to the original Contract: The City has directed the contractor to replace the exisiitng damaged floor drain located in the kitchen serving area. Contractor to demo concrete, and repair/replace the floor drain as needed. All work has been authorized at the agreed lump sum price listed below. Original Contract Amount.. Net change by previously authorized Change Orders..,,.,..., Subtotal Amount of this change ordeir......,....r New contract amount. Working days added: 1 Working days subtracted: 0 t44 i i, i i• a• i R i I 599,810.00 17,434.83 617,244.83 37137.01 $ 620,381.84 Percent change in Contract to date 3.43% Submitted by: et Mena s er 6-20-23 Date eat M Ater bate Approved by: 1 'Cit-Engineer ( PIK Date City Manager, required roc Chi oOrders '$24 Date By signing this Change Order the Contractor confirms that hefshe is completely familiar with its terms and conditions and has fairly negotiated Its price, terms arid conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price Is fair and complete and represents ail costs associated with the work, including but riot limited to all equipment, materials, labor, supervision, overhead, fees, bonds, Insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents am incorporated herein, (2 cr(glrisrs. 1 for City Clerk, t for Contractor) Ac _ and a. =ed by E H General Contracting trlc. Date Note to Contractor: if you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you rrtay proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 106 .4611 4 1 1243 National City Boulevard, National City, CA 91950 Telephone 019) 33E41380 E&H General Contracting Inc 8402 N. Magnolia Ave. Suite B Santee, CA 92071 Phone: (619) 8 5 3 Fax 61 4 6-68 7 PROPOSED CHANGE ORDER No. 10 -1 TITLE: Replace existing Floor Drain PROJECT: F itch en Remodel and Flooring Replaoement TO: Attn: Sean Gill I C , LLC. PO Box 6211 Norco, CA 92860 DATE:06113/2023 JOB: 22-105 CONTRACIIPO: GIP NO 22-06 SUBMITTED: COMPLETED: REQUIRED: DESCRIPTION Cost Revised per RI Per FF1 1 , please see the attached Cost Serving Area Note: This does not include the patchback, conditions before they will provide a price Num Item 1 2 Description to Replace an existing damaged Floor Drain Located in the as the epoxy flooring contractor wants to review the Ref Qty Unit Unit Price Amount APPROVAL By: Date: Plumbiing Concrete Demo 1.000 1.000 Item Total: E&H Overhead (5%) Bond Cost (1 %) B. Date: 1,96 .3B 1,963.38 994.67 994.67 $2,958.05 $147. 0 $31.06 Total: $3,137.01 MLK Community Center HPS Job #2880 Floor Drain Replacement HP - #1 Description Quantity Units Material . Total Manhours . Rate Total Equip Eq. Costinr Total LABOR & EQUIPMENT 11111.11111 Plumber 1 EA € .00 94.48 755.84 EA .111111 011111=1461.68 $ 461.68 EA 7.71 Equipment Total: Material 80.00 Matetlals 260.00 Labor 755.84 Labor 755.84 1 Equipment 461.68 : Subcontractors Material $ 280.00 Sales Tax ig 7.7 % 1.70 _ Miscellaneous Materials @ % : - 1 .. Freight Restocking Maria! Subtotal 301.70 OH&P Mark Up Labor Line 20 % 151.17 OH&P Mark Up Equipment Line 15 % - - 69.25 . OH&P Mark Up Subcontractors Line % : - . HAP Mark Up Materials Line 15 % . -- - -- 45.26 Safety % $ - BIM % : - Bond c . - Prot it 10 % . $ 178.49 TOTAL 1,9 3.38 CO-1 excel 6e/13120 g:36 AM ROSENBACE COMPANY INC. License 842271 T as PI EXTRA WORK REPORT DATE OF PERFORMANCra TBD PROJECT NAMCommunity Center DEseiturnoN OF WOE Saw, Break and Remove concrete around drain EQUIPMENT COSTS EQUIPKENT DESCHMTION Com tressor Fleck Hand Saw QIY $34.32 TOTAL COST OF EQUIPMENT (B) TOTAL $102.96 $OEOO $o.00 $OEoo $0.00 $o.00 $o.00 Office MEma&er TOTAL LABOR (A) SIGNATURE & TITLE TOTAL EQUIP (B) TOTAL MAfiERIAT. (C) TOTAL SUB TIER WORK p) Phone:619-749-9999 BOND & LIABILITY INS. 1870 Joe Crosson Drive, Suite 200 El Cajon, CA 2 2 REPORT DATE: PROEM CHANGE ORDER REQ TOTALS % MARKUP $479i3 2O.0% $23997 1 . a $125OO 1.% $OEoo 5.O% $994.67 0.00% MARK UP AMOUNT $9583. $36.00 $18.75 .00 SUBTOTAL $0.00 TOTAL 1 •i June 9, 2023 7503 05 TOTAL $574 $275.97 $143.75 $o,00 $994.67 $994o7 *99467, Fax: 1 : 9- 3 Contractor; E&H General Contracting RFCO ## coPi# 1 1 2 2 3 3 4 4 5 5 6 6 7 7 8 8 9 9 10 10 Date Requested or notified Description nfWark 2/22/2023 3/8/2023 3/14/2023 4/4/2023 4/10/2023 5/1/2023 5/1/2023 5/18/2023 6/1/2023 6/9/2023 Moisture Tests - 6 each VCT Flouring Removal Remove casework not shown Di) pions Kitchen pafnt CPL Mark -out Floor Prep (T&M) Waiting for ccst5 Electrical outlet relocation FRP fnstaflation Epoxy Floor Patch Repair floor drain Contract Amount: $599,810 Change Order Limits $89,971.50 contingency - 15% of contract NATIONAL CITY CHANGE ORDER LOG RAM Community Center Orlg, Amount Requested or FetimaterJ 7, 2013, 00 8,232.00 1,409.09 6,813.7/ 662.81 10,000.00 393,57 2, 025.77 2,577.02 8,203.13 $ 47,518.20 Revised Amount $ 3,600.00 Apprnved CO It Days Amount Issued Date Issued added Running Total Reason for CO 3,000,00 1 2/23/2023 0 $ 3,000,00 8,232.00 2 3/14/2023 2 $ 11,232.00 542,56 5 5/24/2023 1 $ 11,774.55 0 $ 11,774.56 662.81 3 4/12/2023 0 $ 12,437.37 5/25/2023 $ 12,4.37.37 393.67 4 5/4/2023 0 $ 12,831.0e1 2,026.77 6 5/25/2023 1 $ 14,857.81 2,577.02 7 6/9/2023 1 $ 17,434.83 3,137.01 8 6/16/2023 1 $ 20,571.84 $ 20,571.84 $ 20,571.84 City Requested City Requested Was not showon on plans City Requested City Requested Required due to existing floor condition Required due to plumbing canfllct Required due to case work removal Additional flooring removal required Unknown condition discovered