HomeMy WebLinkAbout2023 CON E&H Contracting Inc. - MLK Community Center CIP No. 22-06 - Change Order No. 6MLK Community Center
CIP No:22-06
Contractor: EH General Contracting, Inc.
NfrATIONAL Cline
4 !
+-t
A I
it
2[173 .2„,, 13 iA OS
--art 01' INTimiuH7-\:-.i
Reason/Purpose for this Change Order:
fer:
The City has directed the contractor install FRP wall panels at the exisitin
removed.
CHANGE ORDER NO. 6
June 7, 2023
cation where the casework was
The City of National
C y and Contractor agree to the following change to the original Contract:
The City has directed the contractor to install approximately 20. of FRP wall panels at the exisiting location
where the casework was removed in the kitchen. All work has been authorized at the agreed lump sum price
listed below.
Original Contract Amount
Net change by previously authorized Change Orders
Subtotal.
Amount of this change order I~....i..li*O11111...,.......■•.•.r•••essier...w■
New contract amount
Working days added: I Working days subtracted: 0
[ubrnitted by:
-Approved by:
l
r
Enqineertiq
By signing this Change Order the Contractor confirms that he/she Is completely familiar with its terms and conditions and has fairly
negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and
labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the
price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor,
supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions
of the original contract documents are incorporated herein. 2 originals: I for City Clerk, I for Contractor)
Da
F E ...,,E ■
$ 599,810.00
12,831.04
612,641.04
2,026.77
$ 14, 7_81
Percent change in Contract to date 2.48%
•
ate
agree • v .•
&H General C0ntraetinInc.:
Manager, required for Change Orders >$24,999 Date
Note to Contractor: if you do not agree with this Change Order you may be directed to proceed with this work under the terms of the
contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect
your claim.
Originals City Clerk, Contractor
cc: Engineering project file, Project Manager
1243 National City Boulevard: National City, CA 9i950
Telephone (619) 336 4380
E&H General Contracting Inc.
8402 N. Magnolia Ave. Suite
Santee, CA 92071
TITLE:
Phone: (619)486-6653
F : 1 486-6897
Added FRP at Existing Casework Location
PROJECT: Kitchen Remodel and Flooring Replacement
TO: Attn: Sean Gill
I, LL.
PO Box 6211
Norco, CA. 92860
PROPOSED
CHANGE ORDER
No. 8
DATE:05/18/2023
JOB: 22-105
CONTRACT/PO: CIP 22-06
SUBMITTED:
COMPLETED:
REQUIRED:
DESCRIPTION
Per Job Walk, the Following Cost is to provide `I wall Panels t the Existing location where the
casework was removed.
Num item Description
1 Labor ( 2 Guys 4 Hours)
2 Labor Markup 20%
3 Material
4 Material Markup 15%
APPROVAL
By:
Date:
Ref
QV Unit Unit Price
8.000 81.74
1.000 130.78
11000 940.00
1.000 282.00
By:
Date:
Item Total:
Bond Cost (1%)
Amount
653.92
130.76
940.00
282.00
$2,006.70
2.7
Total: $2,026.77