HomeMy WebLinkAbout2023 CON E&H Contracting Inc. - MLK Community Center CIP No. 22-06 - Change Order No. 6MLK Community Center CIP No:22-06 Contractor: EH General Contracting, Inc. NfrATIONAL Cline 4 ! +-t A I it 2[173 .2„,, 13 iA OS --art 01' INTimiuH7-\:-.i Reason/Purpose for this Change Order: fer: The City has directed the contractor install FRP wall panels at the exisitin removed. CHANGE ORDER NO. 6 June 7, 2023 cation where the casework was The City of National C y and Contractor agree to the following change to the original Contract: The City has directed the contractor to install approximately 20. of FRP wall panels at the exisiting location where the casework was removed in the kitchen. All work has been authorized at the agreed lump sum price listed below. Original Contract Amount Net change by previously authorized Change Orders Subtotal. Amount of this change order I~....i..li*O11111...,.......■•.•.r•••essier...w■ New contract amount Working days added: I Working days subtracted: 0 [ubrnitted by: -Approved by: l r Enqineertiq By signing this Change Order the Contractor confirms that he/she Is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. 2 originals: I for City Clerk, I for Contractor) Da F E ...,,E ■ $ 599,810.00 12,831.04 612,641.04 2,026.77 $ 14, 7_81 Percent change in Contract to date 2.48% • ate agree • v .• &H General C0ntraetinInc.: Manager, required for Change Orders >$24,999 Date Note to Contractor: if you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard: National City, CA 9i950 Telephone (619) 336 4380 E&H General Contracting Inc. 8402 N. Magnolia Ave. Suite Santee, CA 92071 TITLE: Phone: (619)486-6653 F : 1 486-6897 Added FRP at Existing Casework Location PROJECT: Kitchen Remodel and Flooring Replacement TO: Attn: Sean Gill I, LL. PO Box 6211 Norco, CA. 92860 PROPOSED CHANGE ORDER No. 8 DATE:05/18/2023 JOB: 22-105 CONTRACT/PO: CIP 22-06 SUBMITTED: COMPLETED: REQUIRED: DESCRIPTION Per Job Walk, the Following Cost is to provide `I wall Panels t the Existing location where the casework was removed. Num item Description 1 Labor ( 2 Guys 4 Hours) 2 Labor Markup 20% 3 Material 4 Material Markup 15% APPROVAL By: Date: Ref QV Unit Unit Price 8.000 81.74 1.000 130.78 11000 940.00 1.000 282.00 By: Date: Item Total: Bond Cost (1%) Amount 653.92 130.76 940.00 282.00 $2,006.70 2.7 Total: $2,026.77