Loading...
HomeMy WebLinkAbout2023 CON E&H Contracting Inc. - MLK Community Center CIP No. 22-06 - Change Order No. 7Picc(e-k. hW'1 MLK imunit r Center CIP No: 22-06 Contractor: E&H General Contracting, Inc. L f . 4F—„ ; rt!FA .s 1 Reason/Purpose for this Change order. CHANGE ORDER NO.7 June 9, 2023 r: 0 ti The City has directed the contractor install additional er fi ran tat 2 locations.. 'thin the kitchen. The City of National City and Contractor agree to the following change to the original Contract: : The City has directed the contractor to install additional epoxy floor where the cabinets were located and where the existing floor drain was failing and needed repairs. Approximately 65 sqft. All work has been authorized at the agreed lump sum price listed below. Original Contract Amount. Net change by previously authorized Change +rders... Subtotal.... • .... • • w w • .. ■ Amount of this change orderF...... i.... .ws.........wi# ,,.. Newcontract amount..........,...,. Working days added: I Working days subtracted: 0 • $ 599,810.00 14,857.81 614,667.81 .81 2,577.02 Percent change in Contract to date 2.91% 617,244.88 Submitted by:......_ 6/20/23 City'Orc4 VAP 6 tii, .,...._ _..... . ct Manager Date ana er _L--3_ .._ ate Approved by: Ant\pai En. ineer Date City Manager, required for Change Orders >$24.999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. It this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, tees, bands, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. (2 originals: I for City r Clerk, I for Contractor) A c and a b E&H General Contracting Inc.. (olio fz_x Date Note to Contractor: if you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor : Engineering project file, Project Manager 1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380 E&H genera! Contracting Inc. 8402 N. Magnolia Ave. Suite Santee, CA 92071 TITLE: PROPOSED CHANGE ORDER Phone: 1 -6553 Fax:(619) 48 Additional Epoxy Flooring PROJECT: Kitchen Remodel and Flooring Replacement TO: Attn: Sean Gill ICCS, LLC. PO Box 6211 Norco, CA. 92860 DATE: 0610112023 JOB:12-105 CONTRACTII30: CI22-06 SUBMITTED: COMPLETED: REQUIRED: DESCRIPTION Please see the attached PCO for the Additional epoxy flooring that was added to the project. The added scope is for Two areas. . Place epoxy at area where the i tincabinets were located nd removed. 2. During sitewalk, the area around the existing flog drain in the serving area is failing and reeds to be corrected. Num Item I APPROVAL By: Date: Description Epoxy Flooring Ref [sty Unit Unit Price Amount - 1.000 item Total: E&H Overhead (5%) nd Cost (1%) By: Date: 2,430.00 2,430.00 $2,430.00 $121.50 $25,52 Total: $2r577.02 ,,. MAGNESITE SPECIALTIES, INC. 8686 Production Ave,,. uit , San Diego, CA 91 1- * License1 ( 8) 578-41 4"Fax (858)578-0293 r wvinm.rnagnesitespecialties.com awitgamer E&H General Contracting, Inc. geMilatz, Thursday, June 1, 2023 Aftn: Eddy Espinoza -PM 19) 87O6545 4J ,;_ MLK Community Center Kitchen 8402 N. Magnolia Ave., Ste. B 140 E. 12th St Santee, CA 92071 National City, CA 91950 .: (619) Ciantatt Jake Espinoza -PE Ej (619)4B6897 Mow Ermosalk, 29052 iatatonalaSMIL. gagativallarl Gary English gary@magnesitespecialties.com CHANGE ORDER Oa; 2.5 Dfibagn 9495-1486 mapCocle_a, rdrimatAtti- Extratigitssiihr, Jake ADDITIONAL PATCHING: Prep existing concrete. Install epoxy fill at area around -I drain and against center wall where cabnets were removed. DEMO Y OTHERS Psachatign ADDED PATCHING CHANGES APPROVED By Yid (Contractor) Print Name: By I Date Date ainita ■ 2,430.00 gintiat.QtALICIAL Sub_Mtai $2.430.00 $2,430 00 Original Contract Price: This Change Order. Approved: Change Orders: Total Contract And Extras: $41500.00 g,OO $0,00 $61930.00 (Owner) Print Name: . If Owner's approval Is not obtained, Contractor promises to pay amount of change order to Magnesite Specialties, Inc.. Please sign and return original CHANGE ORDER to our office. Page I of X-O-TE ° TERRAZZO •• EPDXY COATINGS • WATERPROOF COATINGS 6 BEAD B.L.ASTEN