Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
2023 CON Project Professionals Corporation - Civic Center Basement Power Upgrade CIP No. 20-03 - Change Order No. 6
PROJECT d PROFESSIONALS CORPORATION CHANGE ORDER MEMORANDUM May 1.9,.023 To: RobertoYano Director of Engineering & Public Works/City Engineer Engineering and Public Works Department City of National City From: Josh Johnson Project Manager Project Professionals Corporation Project: Civic Center Basement Power Upgrade CIP o.: 20-03 Subject: Change Order No. Chajige Order No. 6 provides for: Procure and install new electrical run from panel E in the main electric room in the basement uptothe conference room on first floor with (2) new emergency receptacles, (2) triple CAT6 drops in the conference room and create a designated 20A receptacle at plotter on first floor. Sup ortinq Information: City Engineering conference room needed additional electrical receptacles and communication lines for future use. The plotter receptacle was also having issues running the plotter and needed to be placed on a designated circuit from the panel instead of a shared circuit. Time A cis/ ustm e n t: Zero (0) additional working days are to be added to the Contract as the additional work did not affect the critical path of the approved schedule. Cost Adjustment: Cost was determined by force account analysis for a total of $4,631.03. Josh Johnson, PPC 5/22/23 Pro) ct nager Date CALIFORNIA — NATIONAL "' Le moo RPM /WED hG Civic Center Basement Power Upgrade rade CHANGE ORDER NO. 6 CIP NO. 20 03 Contractor: latiDnal Electric Works 4440 Rainer Ave, Suite 101 San Diego, CA 92120 May 19,2023 This Change Order modifies Contractor's and the City's obligations and rights under the abovementioned contract. This change order is not effective until approved by the City. Time adjustment: Zero (0) additional working days are to be added to the Contract as the additional work did not affect the critical path of the approved schedule. Cost of ha-ne Order: The City and the Contractor agree that the Contractor shall procure and install a new electrical run from panel E in the main electric room in the basement up to the conference room on first floor with (2) new emergency receptacles, (2) triple CAT6 drops in the conference room and create a designated 20A receptacle at plotter on first floor. The total amount for all labor, material, equipment and all other associated work is 4,6 1.0 . Recommended by Project Manager: cash Johnson, PPC Date: 5/22/23 ,By signing this Change Order the Contractor confirms that he/she is completely familiar with and has fairly negotiated its price, terms and conditions. If this Charge Order is approved, Contractor- will provide all of the equipment, materials and labor necessary to provide a complete work as described above atthat the price stated herein. Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. The signer for the Contractor confirms that he/she is authorized to bind the Contractor to this Change Order. Agreed and Accepted by Contractor: (Print Name and Title) "6444= va,4-.1 Approved by Project Coordinator: , Approved by Assistant Director of E & PW: Approved by City Engineer: Approved by City Manager: (Required for change orders $25,000 and above) Date: � I 9 I Date: Date: 51 2Epe2 6//Date: Date: National Electric Works 4440 Rainier Avenue Suite 101 San Diego, CA 92120 Telephone: 6 19-528-2880 POTENTIAL CHANGE ORDER PCO# 10 Date: 5/16/2023 Project Name: 21-8-000 - National City Civic Center Page Number: 1 Work Description SCOPE: - Provide and install (1) #10/3 MC cable from panel E in main electric room in basement up to conference room on first floor. - Existing shaft to be used between basement and 1st floor. -- install (2) new emergency receptacles in conference room. - install (2) triple CAT6 drops in office next to receptacles from IT rack in adjacent IT room. - Provide and install (1) ##1212 MC cable from panel 2-A to cot -in box at plotter location. - Install (1) 20A receptacle. - Terminate ##1212 wire on existing 20A circuit breaker and test receptacle. Original contract terms, conditions, and exclusions apply. We reserve the right to correct this quote for errors and omissions. This price is good for acceptance within 10 days from the date of receipt. We request a time extension of 3 days. itemized Breakdown Description Qty Total Mat. Total Hrs. #12/2C SOLID CABLE MC - STL ARMOR 40 40.74 2.50 #10/3C SOLID CABLE MC -- STL ARMOR 250 581.6O 10,00 DELI BOX 1 1 /2" DEEP 1/2" KO VW EARS 3 21.32 0.90 1 G SINGLE REC PLATE :. PLASTIC IVY 3 1.59 0.38 20A 125V DUP PE - l\N _LS ) 0 66.29, 1.13 20,E 1 P BREAKER BOLT -ON 2 137.22 0.86 Fire Caulk 1 25.00 0.00 MC Clips 25 12.50 0.00 Totals 327 2T 15.76 Summary General Materials Material Tax Material Markup Total Material LU 569 - General Foreman Thru 06/06/22 LU 569 - Journeyman thru 06/06122 Labor Markup Subtotal 8.750 %) 15.000 %) (7.88 Hrs $94.57) (7.88 Hrs © $79.15) (© 20.000 %) ORIGINAL 886.27 77.55 144.57 1,1 0.9 745.21 62.70 273.78 2,751.08 POTENTIAL CHANGE ORDER PCO# 10 Date:5/16/2023 Project Name: - -00 - National City Civic Center Page Number: National Electric Works 4440 Rainier Avenue San Diego, CA 92120 Summary (Cont'd)__ _ _ _ ------------ - Low Voltage abli g Subtotal Final Amount CLIENT ACCEPTANCE $1,7 0. + 0.000 % 0.000 %+ 5.000 %) 1,879.95 4,631.03 $4,631.03 PCO# 10 Final Amount: $4,631.03 Name: Date: Signature: Change Order #: hereby accept this quotation and authorize the contractor to complete the above described work. ORIGINAL