Loading...
HomeMy WebLinkAbout2023 CON Project Professionals Corporation - Police Dept. Parking Structure Waterproofing CIP No. 22-42 Change Order No. 2PROJECT PROFESSIONALS CORPORATION CHANGE ORDER MEMORANDUM June 16, 2023 To: Roberto Llano, PE Director of Engineering & Public Works/City Engineer Engineering and Public Works Department City of National City From: Randy Garcia Construction Manager Project Professionals Corporation Project: Police Department Parking Structure Waterproofing CIP No.: 22-42 Subject: Change Order No. Change Order No.2 provides_or: The removal of concrete wheelstops and installation of rubber wheelstops. Payment for this change order will be as agreed upon at a lump sum price. Supporting information: During removals in phase 1, the Contractor identified issues with cracking in the concrete wheelstops, As many of the existing wheelstops were cracked, removals caused them to shatter. To better protect the new waterproofing, the City suggested researching an alternative installment of wheelstops. The Contractor suggested wheelstops which could be epoxied to the surface. The alternative installation provided durable wheelstops that would not damage the waterproofing when impacted by vehicles. Time Ad/usmen: Zero (0) working days are to be added to the Contract. Cost Adjustment: The additional cost for this change in the scope of work has been agreed upon at a lump sum price of 7,500,1 , The pay method and amount have been ;reviewed by the Project Manager and are considered fair and reasonable. The supporting documentation is on file with the project records. Randy Garcia 6/26/23 Project Manager Date CALIFORNIA NALTIONAL CTy 3,41 mcortPOR AT D Police Department Parking Structure Waterproofing CHANGE ORDER No. CI P NO. 22 42 Contractor: Harbor Coating and Restoration, ratiorn, Inc, 625 W I atel la Avenue, Suite 5 Orange, CA 92867 June 16, 2023 This Change Order modifies Contractor's and the City's obligations and rights under the abovennentioned contract. This change order is not effective until approved by the City. Time adjustment: Zero (0) working days are to be added to the Contract. Cost of Change Order: The City and the Contractor agree that the Contractor shall proceed with removing and replacing the existing concrete wheelstops within the parking area. Thescope of this additional work includes removal of existing concrete wheelstops and furnishing and installing rubber wheelstops with epoxy and joint The total amount for all Tabor, material, equipment, and all other associated work is ,500,17. sealant. Recommended mended y Project Manager: Randy Garcia Date: 6/26/23 By signing this Change Order the Contractor negotiated its price, terms and conditions. equipment, materials and labor necessary stated herein. Contractor confirms that the the work, including but not limited to all insurance, profit, etc. and that there will be original contract documents are incorporated authorized to bind the Contractor to this Change confirms that he/she is completely If this Change Order is approved, Contractor to provide a complete work as described price is fair and complete and represents equipment, materials, labor, supervision, no further compensation. All of the herein, The signer for the Contractor Order. familiar with and has fairly will provide all of the above at that the price all costs associated with overhead, fees, bonds, terms and conditions of the confirms that he/she is Agreed and Accepted by Contractor: (Print Name and Title)6/23/2023 M_ah oud Merzi - owner f Date; Approved by Project Coordinator: r\d,rtai Qk Date: '/I 0/4--z,..._ Approved by Assistant Director of E & PW: ,-. Intl C te: (a-3 Approved by City Enginee :Ne: i/'- Approved by City Manager: (Required for change orders $25,000 and above) Date: + CALIFORNIA NATIONAL CITY C- :N�a£3U11 POLICE DEPARTMENT PARKING STRUCTURE WATERPROOFING CIP NO. 2 2-42 DATE: May 30, 2023 CHANGE ORDER NO. WORK PERFORMED BY: Harbor Coating and Restoration DESCRIPTION F WORK: Remove and replace concrete wheel stops with yellow rubber wheel stops ACCOU NTING NTiNG FOR TIME, MATERIALS, AND EQU IPM ENT LABOR 2) 3) Laborer Laborer Laborer Two-part epoxy glue -clown Unit Qty HR HR HR 16.00 16.00 16.00 Wage 65.55 65.55 65.55 Sub -Total Labor: Total 1,048.80 1,04.0 1,048.80 3,146.40 TOTAL LABOR: Sub -Total Materials: TOTAL MATERIALS: SUB TOTAL: Total Markup (1O%): 3 146 40 $ 6,818.34 681,83