HomeMy WebLinkAbout2023 CON Project Professionals Corporation - Police Dept. Parking Structure Waterproofing CIP No. 22-42 Change Order No. 1PROJECT PROFESSIONALS CORPORATION CHANGE ORDER MEMORANDUM June 16, 2023 To: Roberto Yano, PE Director of Engineering 84 PublicWorks/City Engineer Engineering and Public Works Department City of National City From: Randy Garcia Construction Manager Project Professionals Corporation Project: Police Department Parking Structure Waterproofing CIP No.. 22-42 Subject: Change Order No. 1 Chanae Order No. 1 provides for: The removal and replacement of existing waterproofing and joint sealant around the north gate storage room sidewalk. Payment for this change order will be as agreed upon at a lump sum price. Supporting orting information: Following a rain event on May 4`r'`, Salvador Gil of the National City Police Department identified a leak issue under the north gate storage room. After discussingwith the Contractor, it was determined that the existing grade of the sidewalk surrounding the facility sloped inwards towards the building causing the water to drain into and under the facility. Additionally, the existingwaterproofing displayed several cracks and signs of deterioration.. The joint sealant surrounding the facility was also cracked and easily stripped away from the building. The Contractor recommended removing the existing waterproofing, installing polycoat polyprime as a thin set material to direct water away from the facility and then installing pedestrian traffic waterproofing. Time Adjustment: Zero (0) working days are to be added to the Contract. Cost djcrstment: The additional cost for this change has been agreed upon at a lump sum price of , 00.00. The pay method and amount have been reviewed by the Project Manager and are considered fair and reasonable. The supporting documentation is on file with the project records. Randy Garcia 6/26/23 Project Manager Date =CALIFORNIA NALTIONAL CITY an4r) INCORPORATED. ) Police Department Parking Structure Waterproofing CHANGE ORDER NO. 1 CIP NO. 22-42 Contractor: Harbor Coating and Restoration, Inc. 625 W Katella Avenue, Suite 5 Orange, CA 92867 June 16, 2023 This Change Order modifies Contractor's and the City's obligations and rights under the abovernentioned contract. This change order is not effective until approved by the City. Time adjustment: Zero (0) working days are to be added to the Contract. Cost of Change Order: TheCity and theContractor agree that theContractor shall proceed with removing and replacing the existing waterproofing along the north gate storage room sidewalk. The scope of this additional work includes removal and replacement of existing waterproofing, installing poiycoat po►lyprime as a thin set material to drain water away from the facility, and removal and replacement of joint sealant along vertical joints. The total amount for all labor, material, equipment, and all other associated work is $64O0.00. Recommended by Project Manager: Randy Garcia Date: 6/26/23 By signing this Change Order negotiated its price, terms and equipment, materials and labor stated herein. Contractor confirms the work, including but not limited insurance, profit, etc. and that original contract documents are authorized to bind the Contractor the conditions. there Contractor necessary that to will incorporated to this confirms that he/she is completely familiar with and has fairly if this Change Order is approved, Contractor will provide all of the to provide a complete work as described above at that the price the price is fair and complete and represents all costs associated with all equipment, rnaterials, labor, supervision, overhead, fees, bonds, be no further compensation. All of the terms and conditions of the herein. The signer for the Contractor confirms that hefshe is Change Order. Agreed and Accepted by Contractor: (I ri not Name and Title} r����o�� � - ,� , Date: / 3/ 0 Approved by Project Coordinator: Date:- i Approved by Assistant Director of E & PW: Date: 41 11 (artr Al(Approvedby CityEngineer:1Date:f'L/3 _ anager: Approved by City Manager: (Required for change orders $25,000 and above) Date: 1 CALIFORNIA NATIONAL le nor a ig INCORPORArfrD POLICE DEPARTMENT PARKING STRUCTURE WATERPROOFING CIP NO. 22-42 DATE: May 24, 2023 WORK PERFORMED BY: Harbor Coating and Restoration CHANGE ORDER NO. 1 DESCRIPTION OF WORK: Remove and replace existing waterproofing along storage room sidewalk at north gate ACCOU NTING FOR TIME, MATERIALS, AN D EQUIPMENT LABOR Laborer(G1) Laborer (G1) Laborer (G1) MATERIALS 2) 4) Poly rime F M B Poly coat PC-260 - Grey PWG Silica Sand Base coat and top coat Unit HR HR HR Unit EA EA EA LS aty 16.00 16.00 0 17.00 Wage 64.04 64,04 64.04 Sub -Total Labor: Labor Markup (20): Qty 1.00 2.00 10.00 1.00 Total 1,024.64 1,024.64 1,088.68 $ 3,137.96 627.59 TOTAL LABOR: 3, 800. 0 Rate 305.28 265.9- 11.77 1,306.01 Sub -Total Materials: Materials Markup (15%): Total 305.28 531.88 117.70 1,306.01 $ 2,260.87 339413 TOTAL MATERIALS: SUB TOTAL: GRAND TOTAL: 2,600.00 I 6,400.00