HomeMy WebLinkAbout2023 CON Project Professionals Corporation - National City Street Resurfacing FY21-22 CIP No. 22-19 Change Order No. 81111111111111113EZMOVIIIIIIIUMEIVEIRI CHANGE ORDER MEMORANDUM June 2023 To: Roberto Yano Director of Engineering & Public Works/City Engineer Engineering and Public Works Department City of National City From: Josh Johnson Project Manager Project Professionals Corporation Project: National City Street Resurfacing FY 1/22 CIP No. 22-19 Subject: Change Order No. 8 Change Order No. 8 provides for: Installing two flashing message boards at the limits of work on National City Boulevard for additional public information of paving operations, Payrnent for this change order will be as agreed upon at a lump sum price. Supporting Information: The City directed the Contractor to install flashing message boards on National City Boulevard to provide additional public information of paving operations. The City directed the Contractor to install the message boards on May gth as work was already being performed on the intersection of 30th Street for the P-. Sewer Upsize project. The message boards were removed from the site on May 26th, following the paving operations. Time Adjustment: Zero (0) additional working days are to be added to the Contract. Cost Adjustment: The additional cost for this change order has been agreed upon at a lump sum price of $2,310.00 The pay method and amount have been reviewed by the Project Manager and are considered fair and reasonable. The supporting documentation is on file with the project records. 6/26/23 Date CALIFORNIA NAT'L NAL Y`- • City- ., INCORPORATED National City Street Resurfacing FY 21/22 CHANGE ORDER NO, 8 Cl R Iio. 2 -19 Contractor: Eagle Paving Company, Inc. 13915 Danielson Street Poway, CA 92064 June 15, 2023 This Change Order modifies Contractor's and the C ity!'s obligations and rights under the abovementioned contract. This change order is not effective until approved by the Cite. Time adjustment: Zero (0) additional working clays are to be added to the Contract. Cost of Change Order: The City and the Contractor agree that the Contractor shall proceed with installing two flashing message boards at the limits of work on National City Boulevard to provideadditional public information on the paving operations. The additional work includes but is not limited to installing flashing message boards at the cross streets of 16th Street and 32nd Street. The total amount for all labor, material, equipment and all other associated work is 2, 10.00r. 1 Recommended by Project Manager: Date: 6/26/23 By signing this Change Order the Cont ctor confr s that he/she is completely familiar with and has fairly negotiated itsprice, terms and conditions.: If this ange Order is approved, Contractor will provide g g pp all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. The signer for the Contractor confirms that he/she is authorized to bind the Contractor to this Change Order. Agreed and Accepted by Contractor: Date: (Print Name and TOO STEPHEN HOUSTON (PM `' fi - " �/21 "o) Approved by Project Coordinator: �---- Date:7/10/43 Approved by Assistant Director of E & PW: tr\_,C7-71 Date: -4 (61 lar3 IL) Approved by City Engineer: \V/ 61-1?-73 Date: 1/1(T3 Approved by City Manager: Date: (Required for change orders $25,000 and above,' CALPFORNIA Nitk CrIvir ae,a,„,3„, --,..F i CO P RAT D NATIONAL STREET RESURFACING FY 21-22 CIP NO. 22-19 DATE: June 15, 2023 CHANGE ORDER NO. WORK PERFORMED BY: Statewide Traffic Safety & Signs DESCRIPTION OF WORK: Install flashing message wards along National City Blvd ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT MATERIAL'S 1 U nit CM, Rate Total 1) Flashing Message Board WK .00 550.00 $ 1,650.00 2) Flashing fviessage Board WK 3.00 $ 550.00 $ 1,650.00 3) Deduction for Message Board Error Wl 2.00 (550.00) $ (1,100.00)1 TOTAL MATEa I ,I. S: $ 2,200.00 Subtotal: Prime Markup 5%: GRAND TOTAL: $ 2,200.00 $ 110.00 2,310.00