Loading...
HomeMy WebLinkAbout2023 CON Innovative Construction Consulting Services LLC - MLK Community Center CIP No. 22-06 Change Order No. 10Innovative Construction Consulting Services, LLC P.O. Box 6211 Norco CA 92860 Phone (51) 532-6483 Lic . # 671810 sgillOiccsinc.net CHANGE ORDER MEMORANDUM UM July 7, 2023 To: Luca Zappiello National City Engineering and Public Works Department City of National City From: Sean Gill Project: MLK Community ity Center CiP No.: 22-06 Subject: Change Order No. 10 j -I 1 ' , j CITY OF i\LATION,..!, Change Ordr o. 1 ' r.avides `o,r• The city has directed the contractor patch back the damaged floor during the floor drain repair. Payment for this change order will be at a lump sum price identified. Supporting trng information Change order 8 identified and compensated the contractor for the demo of the existing Boor drain that was not working. The contractor excluded the floor patch pack as part of the CO as his subcontractor performing the floor drain repair was excessively high for the floor repair cost. We knew the contractor's epoxy repair subcontractor could provide a more competitive price for the repair and did not include this work in CO. ICCS requested alternate pricing for the floor repair. Time Adjustment: No additional days were added to the contract time to coordinate and perform the work as this work was performed the same day as the epoxy repair. Cost Adjustment; The pay method and amount have been reviewed by ICCS and are considered fair and reasonable. able. The supporting documentation is on file with the project records. 8/7/23 roject Manager Date MLK Community Center CHANGE ORDER NO. 10 CIP NO. 22 O6 Contractor: E&H General Contracting July 13, 2023 The city has directed the contractor to patch back the damaged floor during the floor drain repair. This work was previously excluded by the demo subcontractor. This Change Order modifies Contractor's and the ity's obligations and rights under the abavementioned contract. This change order is not effective until approved by the City. Time adjustment: No (0) wday is added to contract time as this work was completed with other items of work. Cost of Change Order: There is a cost increase to the original contract amount. $255.13 Recommended by Project 'Manager: Sean Gill Date:July►13, 2023 By signing this Change Order the Contractor confirms that he/she is completely negotiated its price, terms and conditions. If this Change Order is approved, Contractor equipment, materials and Labor necessary to provide a complete work asdescribed stated herein. Contractor confirms that the price is fair and complete and represents the work, including but not limited to all equipment, materials, labor, supervision, insurance, profit, etc. and that there will be no further compensation. All of the original contract documents are incorporated herein. The signer for the Contractor authorized to bind the Contractor to this Change Order. ..---------- familiar with and has fairly will provide all of the above at that the price all costs associated with overhead, fees, bonds, terms and conditions of the confirms that he/she is Agreed and Accepted by Contractor: (EOM General contracting) -- Date: 11?-12,3 Approved by Project Coordinator: Date: f /23 Approved by Assistant Director of E & PW: Y Date:qi ic417_3_ Approved by City Engineer: Date: qi 1 tiii2a i Approved by City Manager. (Required for change orders 25 000 and above) ielr Date. OAP.) E&H General Contracting inc. 8402 1. Magnolia Ave. Suite Santee, CA 92071 Phone: 1486-6553 Fax: 1 4 - 897 PROPOSED CHANGE ORDER No. 13 TITLE: Concrete Patchback at Serving Area PROJECT: Kitchen Remodel and Flooring Replacement TO: Attn: Sean Gill ICCS LL . PO Box 6211 Norco, CA. 92860 DATE: 07/11/2023 JOB: 22-105 CONTRACT/PO: CIP NO -0 SUBMITTED: COMPLETED: REQUIRED: DESCRIPTION Per PCO #10-1 1, please see the attached cost for the concrete patchback for the floor drain replacement at the serving area. This area was completed by the epoxy contractor to avoid the standard cure time required. Num item Description Ref Qty Unit Unit Price Amount 1 APPROVAL By: Date: Concrete Paohbak 1.000 Item Total: E&H Overhead (5%) Bond Cost (1%) By: Date: 250.00 250.00 $0. 0 $1.0 $2.63 Total: $.1