HomeMy WebLinkAbout2023 CON Innovative Construction Consulting Services LLC - Las Palmas Pool Renovation CIP No. 22-01 Change Order No. 7Innovative Construction Consulting Services, LLC P.O. Box 6211 Norco CA 92860 Phone (951) 532-6483 Lic1 # 671_810 sgill@iccsinc.net CHANGE ORDER mEmoRANDitsMcoF August 7, 2023 To: Luca Zappiell'o National City Engineering and Public Works Department City of National City From: Sean Gill Project: Las Palmas Pool Renovation COP No,: 22-01 Subject: Change Order No. 7 C'J Change Order No. 7 provides for: The contractor to install a new 1.5" backflow preventer and enclosure for the external hose bibs around the pool deck per the County Health code requirements. The exact location will be coordinated with the contractor in the field adjacent to the backside of the woman's locker entrance. Payment for this change order will be at the lump sum prince identified on C06. Supporting inforrrrction. The e ist[ g plumbing did not have a backflow device installed and will be required per the County Health Department. Time djustm e n t. The work will take one day to complete and the contract will be adjusted accordingly. Cost Adjustment: The charge will increase the original contract arrant by $2,731.63 per the attached proposal. The payment method and amount have been reviewed by ICCS and are considered fair and reasonable compared to past projects. The supporting documentation is on file with the project records. 8-9-3 ct Manager Date CJP NO. 22-01 Contractor: California Commercial Pools — CALIFORNIA pATIONAL CITy- INcORPOR ATICD Las Palmas Pool Renovation CHANGE ORDER NO. 07 August 7, 2023 The city has directed the contractor to install a new 1.5" backflow preventer and enclosure for the external hose bibs around the pool deck per the County Health code requirements. This Change Order modifies Contractor's and the City's obligations and rights under the abovementioned contract. This change order is not effective until approved by the City. Time adjustment: One (1) working day is added to contract time due to accommodate the installation. Cost of Cha re Order: There is a cost increase to the original contract per the lump sum price shown. 2,731. 3 Recommended by Project Manager: Date: By signing this Change order the Contractor confirms that he/she is completely familiar with and has fairly negotiated its price, terns and conditions. if this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limitecl to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporatedherein. The signer for the Contractor confirms that he/she is authorized to bind the Contractor to this Change Order. Agreed and Accepted by Contractor: (California Commercial Pools) Approved by Project Coordinator: 4 Approved by Assistant Director of E & PW: Approved by City Engineer: Approved by City Manager: (Required for change orders $ s,000 and above) Date: i /'23 2255 East Auto Centre Dr. Glendora, CA 91740 phone (909) 394-1280 fax (909) 394-1630 ,,CALIFORNIA commercial pools Change Ortler Request JOB NAME: LOCATION: DESCRIPTION: Las Palmas Pool 1800 E. 22nd St National City, CA Install New Backflow Preventer and New Enclosure. Connect Plumbing lines DATE: Project # C".C.F." # 22054 CHANGE ORDER # 8-1-23 LABORER 8 M.H. $76.61 PER HR. IRON WORKER 0 M.II. $85.64 PER HR. OPERATOR 0 ll.l.r $89.88 PER HR. ELECTRICIAN 0 Ili.N. $92.47 PER 1-IR, PLUMBER 0 M.I- . .$90.71 PER HIS. CARPENTER 0 M. Ilia $ 8 7. 01 PER HR. . PROJECT MR_ &. TEM. 0 tvt,H4t $105.00 PER FIR. 2 SUBTOTAL OF LABOR HOURS COST 3 LIABILITY AND PROPERTY INSURANCE (4, 0.00% OF LINE ##2 $0.00 4 MATERIAL SALES TAX OF LINE 4 $0.00 6 SUBTOTAL OF MATERIAL COST $1,735.80 7 I TBTOTAL OF FAN TIPMEIT COST $0.00 9 111:A'1'ER lAL HANDLING & MISCELLANEOUS EXPENSE 0.00% OF LINE # 6 $0.00 $612.88 SO.00 $0.00 $.00 $0.00 $0.00 $0,00 $612.88 $1,735.80 8 EQUPMENT & MATERIALS 15.00% 60. 37 10 SUBTOTAL OF LABOR, MATERIAL & EQUIPMENT $2,60 05 11 SUBTOTAL OF SUBCONTRACTOR COST $0.00 12 SUBCONTRACTOR'S LABOR & MATERIAL MARGIN @ 5.00% OF LINE 11 $0.00 13 LABOR MARGIN @ 20.00% OF LINE 10 $122.58 14 SUBTOTAL OF LABOR,MATERIAL, EQUIPMENT, OVERHEAD, & PROFIT $2,731.63 15 BOND PREMIUM INCLUDED ABOVE [ ° $0.00 16 SUBCONTRACTS & EQUIPMENT RENTAL MARGIN 0.O0% $0.00 TOTAL $2,731.63 ardCALIFORNIA commercial poolscommercial Reference 1 Back11aw Preventer 8acktlow Preventer Ca Co -rPi e&Fittn:s/Ada Equipment Extended Materials $1,017_80 $468.00 250.00 $0 , 00 Extended $1.017.80 $48. 00 $0.00 Man Hours $0.00 $0.00 $0.00 0.00 0.00 Extended $0.00 i 735.80 80 Vendor Ferguson Enterprises # 1 50 P: O. Box 740827 Los Angeles, CA 90074-0827 Phone: (818) 786-.9720 Fax: Qty Uf M Item No 1.00 0.00 0.00 0.00 Description Ship to California Commercial Poots 2255 Auto Centre Dr Glendora, CA91740 LAS PALMAS YY'95OXL 1 2J 1.5' BA K LO PRE V EN 1 ER QUOTE B639663 Unit price ' Amount 1.017.80 0.00 0.00 0.00 1.017.80 0.00 o.00 0.00 PO Writer: Lee Warner Vendor 1 CK %I FLOW PART SILIF1416 10350 411.1 &mei Rai CUICamcgva. Ca 91730 Shuan Wilght Slutangeackflowpartsusa owl Phone: 909 316-7057 Qty Ulm j Item No 1.00 EA 0.00 0.00 0.00 0.00 Description SubtotaI4 1,017.80 Total 1 104.32 1.122.12 Ship to CALIFORNIA COMMERCIAL POOLS 2255 E AUTO CENTRE DR GLENDORA. CA 91740 LAS PALMAS GUARDSHACK BP-2T TAN 10" 24t1X 0BACKFLOW ENCLOSURE SHIPPING t Writer Lee Warner Email: iwerneecalcommpools.com 1 Unit Price Amount 4.00 468,00 ubtot Tax: Total: 0,00 45.00 0..00 0.00 0.00 0.00 45.00 0.00 0.00 0.00 513.00 47.97 _ 560.97