CHANGE ORDER mEmoRANDitsMcoF
August 7, 2023
To: Luca Zappiell'o
National City Engineering and Public Works Department
City of National City
From: Sean Gill
Project: Las Palmas Pool Renovation
COP No,: 22-01
Subject: Change Order No. 7
C'J
Change Order No. 7 provides for:
The contractor to install a new 1.5" backflow preventer and enclosure for the external hose bibs around the pool
deck per the County Health code requirements. The exact location will be coordinated with the contractor in the
field adjacent to the backside of the woman's locker entrance.
Payment for this change order will be at the lump sum prince identified on C06.
Supporting inforrrrction.
The e ist[ g plumbing did not have a backflow device installed and will be required per the County Health
Department.
Time djustm e n t.
The work will take one day to complete and the contract will be adjusted accordingly.
Cost Adjustment:
The charge will increase the original contract arrant by $2,731.63 per the attached proposal. The payment method
and amount have been reviewed by ICCS and are considered fair and reasonable compared to past projects. The
supporting documentation is on file with the project records.
8-9-3
ct Manager Date
CJP NO. 22-01
Contractor: California Commercial Pools
— CALIFORNIA
pATIONAL CITy-
INcORPOR ATICD
Las Palmas Pool Renovation CHANGE ORDER NO. 07
August 7, 2023
The city has directed the contractor to install a new 1.5" backflow preventer and enclosure for the external
hose bibs around the pool deck per the County Health code requirements. This Change Order modifies
Contractor's and the City's obligations and rights under the abovementioned contract. This change order
is not effective until approved by the City.
Time adjustment:
One (1) working day is added to contract time due to accommodate the installation.
Cost of Cha re Order:
There is a cost increase to the original contract per the lump sum price shown.
2,731. 3
Recommended by Project Manager:
Date:
By signing this Change order the Contractor confirms that he/she is completely familiar with and has fairly
negotiated its price, terns and conditions. if this Change Order is approved, Contractor will provide all of the
equipment, materials and labor necessary to provide a complete work as described above at that the price
stated herein. Contractor confirms that the price is fair and complete and represents all costs associated with
the work, including but not limitecl to all equipment, materials, labor, supervision, overhead, fees, bonds,
insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the
original contract documents are incorporatedherein. The signer for the Contractor confirms that he/she is
authorized to bind the Contractor to this Change Order.
Agreed and Accepted by Contractor:
(California Commercial Pools)
Approved by Project Coordinator:
4
Approved by Assistant Director of E & PW:
Approved by City Engineer:
Approved by City Manager:
(Required for change orders $ s,000 and above)
Date:
i /'23
2255 East Auto Centre Dr.
Glendora, CA 91740
phone (909) 394-1280
fax (909) 394-1630
,,CALIFORNIA
commercial pools
Change Ortler Request
JOB NAME:
LOCATION:
DESCRIPTION:
Las Palmas Pool
1800 E. 22nd St National City, CA
Install New Backflow Preventer and New Enclosure. Connect
Plumbing lines
DATE:
Project #
C".C.F." # 22054
CHANGE ORDER #
8-1-23
LABORER 8 M.H. $76.61 PER HR.
IRON WORKER 0 M.II. $85.64 PER HR.
OPERATOR 0 ll.l.r $89.88 PER HR.
ELECTRICIAN 0 Ili.N. $92.47 PER 1-IR,
PLUMBER 0 M.I- . .$90.71 PER HIS.
CARPENTER 0 M. Ilia $ 8 7. 01 PER HR.
.
PROJECT MR_ &. TEM. 0 tvt,H4t $105.00 PER FIR.
2 SUBTOTAL OF LABOR HOURS COST
3 LIABILITY AND PROPERTY INSURANCE (4, 0.00% OF LINE ##2 $0.00
4 MATERIAL
SALES TAX OF LINE 4 $0.00
6 SUBTOTAL OF MATERIAL COST $1,735.80
7 I TBTOTAL OF FAN TIPMEIT COST $0.00
9 111:A'1'ER lAL HANDLING & MISCELLANEOUS
EXPENSE 0.00% OF LINE # 6 $0.00
$612.88
SO.00
$0.00
$.00
$0.00
$0.00
$0,00
$612.88
$1,735.80
8 EQUPMENT & MATERIALS
15.00% 60. 37
10 SUBTOTAL OF LABOR, MATERIAL & EQUIPMENT $2,60 05
11 SUBTOTAL OF SUBCONTRACTOR COST $0.00
12 SUBCONTRACTOR'S LABOR & MATERIAL MARGIN @ 5.00% OF LINE 11 $0.00
13 LABOR MARGIN @ 20.00% OF LINE 10 $122.58
14 SUBTOTAL OF LABOR,MATERIAL, EQUIPMENT, OVERHEAD, & PROFIT $2,731.63
15 BOND PREMIUM INCLUDED ABOVE [ ° $0.00
16 SUBCONTRACTS & EQUIPMENT RENTAL MARGIN 0.O0% $0.00
TOTAL $2,731.63
ardCALIFORNIA
commercial poolscommercial
Reference
1
Back11aw Preventer
8acktlow Preventer Ca
Co -rPi e&Fittn:s/Ada
Equipment
Extended
Materials
$1,017_80
$468.00
250.00
$0 , 00
Extended
$1.017.80
$48. 00
$0.00
Man Hours
$0.00
$0.00
$0.00
0.00
0.00
Extended
$0.00
i 735.80
80
Vendor
Ferguson Enterprises # 1 50
P: O. Box 740827
Los Angeles, CA 90074-0827
Phone: (818) 786-.9720
Fax:
Qty Uf M Item No
1.00
0.00
0.00
0.00
Description
Ship to
California Commercial Poots
2255 Auto Centre Dr
Glendora, CA91740
LAS PALMAS
YY'95OXL 1 2J 1.5' BA K LO PRE V EN 1 ER
QUOTE B639663
Unit price ' Amount
1.017.80
0.00
0.00
0.00
1.017.80
0.00
o.00
0.00
PO Writer: Lee Warner
Vendor
1 CK %I
FLOW
PART SILIF1416
10350 411.1 &mei
Rai CUICamcgva. Ca 91730
Shuan Wilght
Slutangeackflowpartsusa owl
Phone: 909 316-7057
Qty Ulm j Item No
1.00 EA
0.00
0.00
0.00
0.00
Description
SubtotaI4
1,017.80
Total 1
104.32
1.122.12
Ship to
CALIFORNIA COMMERCIAL POOLS
2255 E AUTO CENTRE DR
GLENDORA. CA 91740
LAS PALMAS
GUARDSHACK BP-2T TAN 10" 24t1X 0BACKFLOW
ENCLOSURE
SHIPPING
t Writer Lee Warner
Email: iwerneecalcommpools.com
1 Unit Price Amount
4.00 468,00
ubtot
Tax:
Total:
0,00
45.00
0..00
0.00
0.00
0.00
45.00
0.00
0.00
0.00
513.00
47.97