CHANGE ORDER MEMORANDUM
April 14, 2023
To: Roberto Yano
Director of Engineering & Public Works/City Engineer
Engineering and Public Works Department
City of National City
From: Josh Johnson
Senior Project Manager
Project Professionals Corp
Project: Paradise Creek Educational Park Extension
CIP No.: 19-33
Subject: Change Order No. 15
Chan e Order No. 15 provides for
Reconnecting the existing irrigation wires to the newly installed irrigation controller.
Payment for this change order was under force account.
Supporting inform CI don:
As described in change order 'I 1, the irrigation controller needed to be removed and replaced. During
removal, the Contractor identified existing irrigation wires that were connected to the controller but were
not tagged or marked to annotate which irrigation line they were connected to. The Contractor was
directed to proceed with connecting the irrigation lines as per plan which only included connecting the
new irrigation lines. City landscaping originally stated they would trouble shoot and reconnect the old
irrigation wires.
On February 15, 2023 during the punchwalk, the City's Landscaping department redirected the
Contractor to reconnect the existing irrigation wires as well. The Contractor proceeded under force
account and reconnected the irrigation wires that had been previously connected to the pre-existing
irrigation controller.
Time Adjustment:
No additional working days are being provided for this change in the scope of work as it did not affect the
critical path of the approved schedule.
Cost Adjustment:
The additional cost for this change in the scope of work has been agreed upon by force account for a total
of $480.62.
The pay method and amount have been reviewed by the Project Manager and are considered fair and
reasonable. The supporting documentation is on file with the project records.
7/25/23
Date
#) CALIFORNIA."0
NPA NAL
PARADISE CREEK EDUCATIONAL PARK EXTENSION
CIP NO. 1-33
Contractor: Tri-Group Construction and Development.
9580 Black Mountain Rd. Ste. L
San Diego, CA 92126
CHANGE ORDER NO. 15
April14, 2023
This Change Order modifies Contractor's and the City's obligations and rights under the abovementioned
contract. This change order is not effective until approved by the City.
Time adl tment:
Zero (0) additional working days are to be added to the Contract.
Cost of Change Order:
The City and the Contractor agreed that the Contractor proceeded under force account with
reconnecting the existing irrigation wires to the new irrigation controller. The additional work included
but was not limited to reconnecting the existing irrigation wires that had been connected to the
pre-
existingirrigation controller. The total amount for all labor, material, equipment and all other
associated work is $480.62.
Recommended by Project Manager:
Date: 7/25/23
By signing this Change Order the Cant ctor confi s that he/she is completely familiar with and has fairly
negotiatedprice, its terms and conditions. If this ange Order is approved, Contractor will provide all of the
equipment, materials and labornecessary to pr ide a complete work as described above at that the price
stated herein.. Contractor confirms that the price is fair and complete and represents all costs associated with
the work, including but not limited to ail equipment, materials, labor, supervision, overhead, fees, ends,
insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the
original contract documents are incorporated herein. The signer for the Contractor confirms that he/she is
authorized to bind the Contractor to this Change Order.
Agreed and Accepted by Contractor:
(Print Name and Title)
Approved by Project Coordinator:
Approved by Assistant Director of E & PW:
Approved by City Engineer:
Approved by City Manager:
(Required for change orders $25,000 and above)
c4,
VIP
Date:
Date:
Date:
Date:
CALIFORNIA
NATIONAL ci
T+NCO��'
ATV)��
PARADISE CREEK EDUCATIONAL PARK EXTENSION
CIP NO. 19-33
DATE: April 13., 2023
CHANGE ORDER NO. 15
WORK PERFORMED BY: Tri-Group Construction & Development
DESCRIPTION OF WORK: Reconnect Wires to Irrigation Controller
ACCOUNTING FOR TIME, MATERIALS, AND EQU IPM ENT
LABOR
La borerioumeyman
La borer Apprentice P5
EQUIPMENT
Work Truck
LI n rt
HR
HR
Unit
HR
2.00
2.00
Wage I Total
59.81
119.62
55.48
Sub -Total Labor:
Labor Surcharge 30.99%)
Labor Markup (20%):
City
Rate
2.00 I $ 49.31
110.96
230.58
71
60.41
TOTAL LABOR: 362.45
Total
98.62
Sub -Total Equipment:
Equipment Markup (154
TOTAL EQUIPMENT:
98.62
14.79
SU BTOTAL:
1% BOND:
GRAND TOTAL:
113.41
475.86
4.76
480.62
$
DAILY EXTRA WORK REPORT
City Of National City
t n oter. 2-0 Paradise Creek Educational al Park Extension
Work PerforEmd BY: Tri-Group Construction, Inc.
Description of Mat; r Connecting Wires To Irrigation Controller
Labor Charges
GraWievel
lO, LBWL!
102 APP P5
e blame
F
E RodrigUez
Equipment Charges
E art ID Class Make
Eon IN03 TRUCK TWIT 20-28
Model
Al A2
tirs DT/DT Mrs
2.00
2.00
FIT Firs
2.00
liril `rI croup onion; inc.
9580 Black Mountain Rd, Ste. 1.. San Diego, CA 92I 28
Phone: 85808-0058 Fax: 858-689-1594
14TEt Special Hill Form
OTleis
Subs Units
Contract: 19
RT Rale MDT Rate
62.93a
57.610
AT Rale
52.020
Subs Rate
OT Rate Delay Factor
Extended
125.860
115.220
Extended
104.040
Change Order
Iliing Numb
ieafl Dale
Porforrn Data
001
5.0
3/2712023
2 f20
Labor Charges
RT Labor 241.08
SC MOS% 74.71
OTilYr LahOY 0.00
Subtotal Labor
Subsistence
Othor Pxpensee
ML.1 20.00%
Labor Total
Equipment
Subtotal
MU 15.00
Equipment Total
afle
315.79
0.00
0,00
0.18.
376.95
Charges
104.04
119.65
Material Charges
WAWA ? `scorn