CHANGE ORDER MEMORANDUM
March 30, 2023
Roberto Yana
Director of Engineering &. Public Works/City Engineer
Engineering and Public Works Department
City of National City
From: Josh Johnson
Project Manager
Project Professionals Corporation
Project: Paradise Creek Educational Park Extension
CI P No.. 19-33
Subject: Change Order No. 13
1
• 's s
Change Order No. 13 provides for:
Removing and reinstalling "no ped crossing signs" to correctly reflect the new crosswalk improvements layout,
installing a new pedestrian barricade and additional striping as per the revised details 21 and 41 on sheet C1.8.
Payment for this change order will be as agreed upon at a lump sum price,
Supporti Information:
During the punch walk on February 15, 2023, PPC identified an issue with the existing barricade installed on the
northwest corner of Hoover Ave. and 18th St. The existing barricade directed pedestrian traffic to the crosswalk
west of the project site at Coolidge Ave, and 18th St. With the newly installed improvements, PPC directed the
Contractor to install a barricade on the southwest corner to restrict pedestrian crossing as well as to reinstall the
"no ped crossing signs" to direct traffic to the newly installed crosswalk.
During the punch walk Kimley-Horn identified the need for additional striping along Hoover Ave. to designate
opposing traffic across 18th St. The revised striping plan was supplied to the Contractor along with punch list on
February23, 2023.
Time Adjustrent:
Zero (0) additional working days are to be added to the Contract.
Cost Adjustment:
The additional cost for this change in the scope of work has been agreed upon at a lump sum price of 2,333.10.
The cost for this change in the work accounts for all labor, equipment, materials and ail other work associated with
this change order.
The pay method and amount have been reviewed by the Project Manager and are considered fair and reasonable. The
supporting documentation is on file with the project records.
7/25/23
Date
4 CALIFORNIA ,,
01 ALr 1"
CITy
I`f
M
NCO itroitKral)
PARADISE CREEK EDUCATIONAL PARK EXTENSION CHANGE ORDER NO.O. 13
C#P No. 1 33 March 30, 2023
Contractor: Tri-Group Construction and Development.
9580 Black Mountain Rd. Ste. L
San Diego, CA 92126
This Change Order modifies Contractor's and the City's obligations and rights under the abovernentioned
contract. This change order is not effective until approved by the City.
Time adjustment:
Zero (0) additional working days are to be added to the Contract.
Cost of Change Order:
The City and the Contractor agree that the Contractor shall proceed with removing and reinstalling ''no
ped crossing signs" to correctly reflect the new crosswalk improvements layout, installing a new
pedestrian barricade and additional striping as per the revised details 21 and 41 on sheet C1.8. The
additional work includes but is not limited to installing a new barricade on the southwest corner of
Hoover Ave. and 18th St., reinstalling "no ped crossing signs" on the northwest and southwest corners
to reflect new crosswalk improvements, and providing additional striping as per details on sheet C1.8.
The total amount for all labor, material, equipment and ail other associated work is 2,333.10.
Av
Recommended by Project manager:
Date: 7/25/23
By signing this Change Order the Co actor con rrns that he/she is completely familiar with and has fairly
negotiated its price, terms and conditions. if thi s hange Order is approved, Contractor will provide all of the
equipment, materials and labor necessary to provide a complete work as described above at that the price
stated herein. Contractor confirms that the price is fair and complete and represents all costs associated with
the work, including but not limited to all equipment, niaterials, labor, supervision, overhead, fees, bonds,
insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the
original contract documents are incorporated herein. The signer for the Contractor confirms that he/she is
authorized to bind the Contractor to this Change Order.
Agreed and Accepted by Contractor:
(Print Name and Title)
Approved by Project Coordinator:
Approved by Assistant Director of E & PW:
Approved by City Engineer:
Approved by City Manager:
(Required for change orders $25,000 and above)
Date: --7/j� /z3
Date: %:116(
Date'.
11..3 -3
Date;
CALIFORNIA
NsnoaNAL arr. +NCO�� 9YED -
PARADISE CREEK EDUCATIONAL PARK EXTENSION CHANGE ORDER NO. 13
CIP NO. 19-33
DATE: March 29, 2023
WORK PERFORMED BY: Tri-Group Construction & Development
DESCRI PIM N OF WORK: Additional Striping and Barricades
ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT
SUBCONTRACTOR
I Pedestrian Ba rr-ica de Southwest
\Corner
Unit
EA
Qty
1.00
Rate I Total
1120C ,00
1,200.00
Striping as per detail 2:1 and 41 on
C1.8
LS
1.00
1,000.00
Sub -total Subcontractor: $
1,000. 00
2,200.00
Subcontractor Markup (5%): 110. 00
TOTAL L SU B CO1 TRACTO R:
SU BTOTAL:
1%BOND: $
2,310.00
2,310.00
GRAND TOTAL:
23.10
2,333.10