HomeMy WebLinkAbout2023 CON Project Professionals Corporation - Paradise Creek Educational Park Extension CIP No. 19-33 Change Order No. 12r •• ■ 01, PROJECT PROFESSIONALS CORPORATION CHANGE ORDER MEMORANDUM March 30, 2023 To, Roberto Yano Director of Engineering & Public Works/City Engineer Engineering and Public Works Department City of National City From: Josh Johnson Project Manager Project Professionals Corporation Project: Paradise Creek Educational Park Extension CIP No.: 19-33 u bJ ect: Change Order No. 12 Change Order. No. 12 provides for: Removal and disposal of 3/8" Mojave Gold Gravel and planting of 240 1-gallon Salicornia Pacifica in native soil. Payment for this change order will be as agreed upon at a lump sum price. Supporting Information: As per change order #9, the Contractor installed 3/8" Mojave Gold Gravel in ail planter areas. After being informed of excess gravel Neri Landscape Architecture directed the Contractor to place the excess gravel along the newly installed paver areas on the southerly portion of the project site. During the punch walk, the Contractor was directed by theCity to remove the gravel and replant the native plant species in the locations identified south of the project site to help preserve the wetlands. `uirne Ad/Lrs trter7t: Zero (0) additional working days are to be added to the Contract. • Cost Adjustment: The additional cost for this change in the scope of work has been agreed upon at a lump sum price of 7,500.00. The cost for this change in the work accounts for all labor, equipment, materials and all other work associated with this change order. The pay method and amount have been reviewed by the Project Manager and are considered fair and reasonable. The supporting documentation is on file with the project records. 7/25/23 Pr ct Man ag " Date CALIFORNIA NATI: NAL PARADISE CREEK EDUCATIONAL PARK EXTENSION CHANGE ORDER NO. CIP NO. 19-33 Contractor: Tri-Group Construction and Development. 9580 Black Mountain Rd. Ste. L San Diego, CA 92126 March 30, 2023 This Change Order modifies Contractor's and the City's obligations and rights under the abovementioned contract. This change order is not effective until approved by the City. Time adustent: Zero (0) additional working days are to be added to the Contract. Cost of Chaim a Order: The City and the Contractor agree that the Contractor shall proceed with removing the 3/8" Mojave Gold Gravel placed at the southerly end of the project site and restoring the native vegetation in the same area.. The additional work includes but is not limited to removal and disposal of the 3/8" Mojave Gold Gravel and planting of 240 1-gallon Salicornia Pacifica on native soil. The total amount for all labor, material, equipment and all other associated work is $7,500.00. Recommended by Project Manager: Approved by Assistant Director of E & PW: - Approved by City Engineer: Otiegti Approved (Required for by City Manager: change orders $25,000 and above) Date: -)-= CALIFORNIA NATI NAL Clint mav nvcoRPoRATV) PARADISE CREEK EDUCATIONAL PARK EXTENSION CIP NO. 1 - 3 DATE: March 22, 2023 CHANGE ORDER NO. 12 BREAKDOWN FROM CONTRACTOR WORK RK PERFORMED BY: Tri-Group Construction & Development DESCRI PTION OF WORK: Remove gravel and install native plant species ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT 14/1 LaborerApprentice Operator Driver MATERIALS 1-Gal SaCicornia Pacifica EQUIPMENT Work Truck Skid Steer Mini Excavator S uper Ten Unit EA 12.00 I $ 10$.15 6.00 36.68 Sub -Total Labor: Labor Markup ("10): city 240.00 Rate 5.50 Sub -Total Materials: 1,324A8 1,297.80 20.0E 3,753.08 372.32 TOTAL LABOR: Total $ 1,30.00 $ 1,3 0.00 TOTAL MATERIALS: Sub -Total Equipment: 788,96 465.24 294,00 506.40 2,054. 60 TOTAL EQUIPMENT: SU BTOTAL: 4,125.40 1s320.00 2,054.E+0 GRAND TOTAL: $ 7,500.00 7,500 00