CHANGE Ol DER MEMORANDUM
August 9th, 2023
To: Martha Juare
Acting Director of Engineering & PublicWors/City Engineer
Engineering and Public Works Department
City of National City
From: ,Nosh Johnson
Senior Project Manager
Project Professionals Corp
Project: Civic Center Basement Power Upgrade
CIP o.: 20-03
Subject: Change Order No 8
Change Order No. 8 provides for:
Proceeded under time and materials with circuit tracing and labeling of panels and devices within basement and
throughout other panels in building. This change order covers all the remaining panels completed outside of
change order ##4.
Supporting ti'ng Information:
During site investigation it was discovered that the existing control panels have not been updated in years and
many were incorrect with existing conditions. To update the labeling, the Contractor must trace all existing wire
connections to see what is fed or if it is still in use. The Contractor proceeded under time and materials for this
work and this change order covered all the remaining panels outside of the work completed under change order
Time Ad/ustmnt:
Zero (0) additional working days are to be added to the Contract as the additional work did not affect the critical
path of the approved schedule.
Cost Adjustment:
Cost was determined by force account analysis for a total of $3,, 3/13. 8.
osh Johnson, PPC 8/11/23
roject ariager Date
/
CALIFORNIA 4'
NATIONAL CITp
Civic Center Basement Power Upgrade CHANGE ORDER NO. g
lP NO. 0-03 August 9th, 2023
Contractor: National Electric Works
44/10 Rainer Ave, Sprite 101
San Diego, CA 92120
This Change Order modifies Contractor's and the City's obligations and rights under the
abovementioned contract. This change order is not effective until approved by the City.
Time adjustment:
Zero (0) additional working days are to be added to the Contract as the additional work did not affect
the critical path of the approved schedule.
Cost of Change Order:
The City and the Contractor agree that the Contractor proceeded under time and
materials with circuit tracing and labeling of panels and devices within basement
and throughout other panels in building. This change order covers all the
remaining panels completed outside of change order #4 to complete the building.
The total amount for all labor, material, equipment and all other associated work is
$3,343 .7,
Recommended by Project Manager:
ash Johnson, PPC
Date: 8/11/23
By signing this Change Order the Contractor'` confirms that he/she is completely familiar with and has fairly
negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the
equipment, materials and labor necessary to provide a complete work as described above at that the price
stated herein. Contractor confirms that the price is fair and complete and represents all costs associated with
the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds,
Insurance, profit, etc. andthatthere will be no further compensation. Alt of the terms and conditions of the
original contract documents are incorporated herein. The signer for the Contractor confirms that he/she is
authorized to bind the Contractor to this Change Order.
Agreed and Accepted by Contractor:
(Print Name and Title) eitA4
Approved by City Engineer:
I
Approved by City Manager:
(Required for change orders $25,000 and above)
Date:
Date:
Date: